My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-014
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 11:35:51 AM
Creation date
9/30/2015 7:38:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/04/2005
Control Number
2005-014
Agenda Item Number
11.1.7
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.5 Oslo Road Bridge Replacement Roadway Widening
Area
Lateral J Canal
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Drill 6 ' deep hand-auger borings within the proposed roadway improvement <br /> corridor to evaluate the in-place subsoils and measure groundwater levels . These <br /> borings will be drilled at a horizontal spacing of about 500 ' . Approximately 10 <br /> borings will be drilled. <br /> ■ Provide a Seasonal High Water Table (SHWT) estimate associated with the <br /> proposed storm water management facility along Oslo Road between 27th and 20th <br /> Avenue . <br /> ■ Prepare and submit brief engineering report of our findings, conclusions and <br /> recommendations as they pertain to the planned construction. <br /> Utility Permitting <br /> The ENGINEER will submit a separate FDEP public drinking water permit to support the <br /> relocation of the 20" water main in the vicinity of the Lateral ` J ' Canal Crossing. The consultant <br /> will coordinate with FDEP in regards to obtaining these permits . The COUNTY will be <br /> responsible for all permit application and agency review fees . <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant <br /> to this Agreement fees inclusive of expenses in accordance with the following : <br /> A. Professional Services Fee <br /> The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is as <br /> follows : <br /> Task Labor Fee <br /> Lump Sum Components <br /> Oslo Road/ Lateral J Canal Crossing $ 17, 721 <br /> Geotechnical Investigation $ 39850 <br /> Utility Permitting $ 1 ,600 <br /> "SECTION XVI — DURATION OF AGREEMENT" is being modified to incorporate the following : <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion <br /> of Probable Construction Cost for the excerpted project shall be two (2) months following <br /> receiving the authorization to proceed. Once permits are received, 100% design drawings shall be <br /> completed 30 days thereafter. <br /> GA04703508\WP\AMENDA05 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.