Laserfiche WebLink
12 / 20 / 2004 23 : 19 772 - 343 - 9404 DET PSL PAGE 02 <br /> 0 <br /> DUNKELBERGER ENGINEERING & TI. STING INC. <br /> Indian River County December . 21 , 2004 <br /> Department of Public Works Proposal No. PO4- .11. - 1726 <br /> 1840 — 250' Street <br /> Vero Beach , Florida 32960 <br /> Attention : Ms. Terry Thompson, P.E_ . . . via facsimile <br /> Subject : Geotechnrcael Savices <br /> Roadway Soil Survey & Pond SubsurfaceInvestigation <br /> Oslo Road Widening from 2e ,Avenue to 27" Avenue <br /> Vero Beach, Florida <br /> Dear Ms. Thompson : <br /> Pursuant to your request, Dunkelberger Engineering & Testing, Inc . (DE&T) i.3 pleased to submit <br /> this proposal, for geotechnical services in connection with the above referel iced project. Our <br /> proposed scope of work is based on our telephone conversation with Mr. Btian Good., P.E., of <br /> K.imley-horn and Associates, Inc., review of the plan set provided to us, and our previous <br /> experience with Oslo Road improvemezits. Genually, our scope of work, is to complete a <br /> roadway soil survey for widening of Oslo Road between 20th Avenue and 27th Avenue, and a <br /> subsurf we exploration for the proposed f2-acre pond. <br /> Our services will include drilling auger boxings along the roadway alignment for the purpose of <br /> exploring the shallow subsurface conditions (i.e. , soil and groundwater). Ow• services will also <br /> include drilling Standard Penetration Test (SPT) borings for the purpose of exploring the <br /> subsurface conditions within the area of the proposed f2-acre pond. <br /> Presented hereafter are descriptions of the technical scope of work that we propose to undertake, <br /> the cost breakdown, and a time frame for completion of the work. <br /> PROJECT GOMMERA.TIONS <br /> The project will involve design and construction of a new 4 and 5-lane divided roadway along <br /> the existing right-of way of Oslo Road.. The roadway will be a complete reronstruetion of the <br /> right-oof--way which wall replace the existing roadway alignment from the. south edge of the <br /> existing pavement to approximately 30 feet north of the north edge of the (Wstin,g pavement. <br /> The existing pavement is approximately 35 feet wide. <br /> The new roadway will be divided by a raised, landscaped median or a turning ' lane, depending on <br /> the section of roadway. The roadway design will include Type F curb and gutter system and an <br /> 8-foot sidewalk along the north side. <br /> 523A BIW Eht Isms c Drive, Port S4 Ludev Florida 34986 • CM) 343-9787 • Fa) . ('772) 3434444 <br />