My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-218
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2016 10:42:32 AM
Creation date
10/1/2015 3:45:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
08/18/2009
Control Number
2009-218
Agenda Item Number
12.J.2
Entity Name
Kimley-Horn and Associates
Subject
Renovation of air conditioner system
Area
South County Reserve Osmosis Facility
Supplemental fields
SmeadsoftID
10749
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE <br /> We will provide our services within a reasonable length of time to meet the following mutually <br /> agreed upon schedule . <br /> FEES <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated April 6 , 2004 , amended April 7`h5 2007 with Indian River County, <br /> a political subdivision of the state of Florida . <br /> The Consultant will provide these services for a Lump Sum fee as follows : <br /> Task No . Task Task Fee <br /> Task 1 HVAC Design and Drawing Pre aration E $ 65900 <br /> Total LumpSum Fee = $6,900 <br /> ADDITIONAL SERVICES <br /> This Scope of Services does not include the following elements for this project that may be <br /> required depending on circumstances that may arise during the execution of this project . Some <br /> elements that may be considered additional services are mentioned herein . Additional services <br /> I <br /> nclude, but may not be limited to the following : <br /> • Revisions to drawings and specifications beyond what is listed herein . <br /> • Building department review comments which may require significant design changes . <br /> • Bidding phase services and answering bidder questions <br /> • Construction phase services <br /> • Field engineering <br /> • Construction management <br /> K:\WPB—Civil\044572017 - SRO Water Plant Improvements\Scope , JS\South RO Plant HVAC Design rev2 .docx Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.