|
.
<br />1950981 RECORDED IN THE RECORDS OF JEFFREY K BARTON, CLERK CIRCUIT COURT INDIAN
<br />RIVER CO FL, BK: 2295 PG: 2284, 10/03/2008 11:28 AM
<br />Bond No. 929461647
<br />SECTION 00610
<br />PERFORMANCE BOND
<br />TATS IS AN INSTRUCTION, NOT PART OF THE BOND The bond must state cu its front page:
<br />the name, principaa business address, and phone number of the contractor, the surety, the owner of
<br />the property bemg.4uproved, and, if different from the owner, the contracting public entity; the,
<br />contract number. assigned by the contractffiing public entity; and a description of the project
<br />sufficient to identify it, such as a legal description or the street address of the property. being
<br />improved, and a general description of the improvement, and the bond number.
<br />KNOW ALL MEN BY THESE PRESENTS: ('yal I=% A.r�, S�► � 100
<br />BYTHIS BOND, we _Interstate EngineerI Cor 3c' P -6e 3348`1
<br />8 p ,-A� qq8. 4 a.5: as Principal,
<br />i and WesternSurety Company , .a corporation, as
<br />Surety, are held and firmly bound unto the County of Indian River, Florida, in the sums of Eight Hundred
<br />NinetymFour Thousand Six u....a.._,, __L rani.. Dollars (� _�__, amounting to 100% of the
<br />total bid price. For the piyriient of said sutra we bind ourselves, our heirs, executors, administrato rtd
<br />j assigns, j ndy and severally, for the faithful performance of a certain written Contract, dated then
<br />day d ian River, foor:r:
<br />of Ind20MI, entered into between the Principal and the County
<br />i
<br />Project Name: South RO Water Treatment Plant improvements
<br />" County noject )aid Number: 2008027
<br />County Project Number; UCP 2859
<br />Project Address: 15009", Street (Oslo Rd.) .
<br />.. _. ._..... Vero Begeli, FL 32962
<br />Project Description:
<br />1. Fliraish all labor and materials necessary to complete the South R.O. Water
<br />Treatment Plant .�Improvenments including the following: relocation of permeate
<br />acid injector, installation of new acid supply and c6atainmeot piping,
<br />modifications to raw water blend piping including acid injector and static mixer,
<br />remove and install three (3) new 150 hp horizontal split case high service pumps
<br />including bases, couplings, motors, all nuts, bolts, fasteners, oua!ds, electrical
<br />_ . wiring, disconnects, VFD's, and all other appurtenances, installation of two
<br />owner -furnished PE bulk tanks including pad, demolition of existing entrance
<br />opening, piping, valves, appurtenances and hardware, ihtegtation of SCADA
<br />system programming, modification of RO trains including replacement of simple
<br />_.. tubing, permeate hoses, 6" permeate headers, permeate port end a0.apters,
<br />r appurtenances and hardware, replacement of up to a total of twelve (12) new 6M
<br />pressure vessels, painting and architectural treatment and accessory items, as
<br />depicted in these documents.
<br />0:
<br />044572017
<br />00610-1
<br />A6TRUE COPY
<br />CERTIFICATION ON LAST PAGE
<br />J.K. BARTON, CLERK
<br />
|