Laserfiche WebLink
BK : 2295 PG : 2288 <br /> Bond No . 929461647 <br /> SECTION 00612 <br /> PAYMENT BOND <br /> THIS IS AN INSTRUCTION, NOT PART OF THE BOND The bond must state on its front• page: <br /> the name, principal business address, and phone number of the contractor, the surety, the owner of <br /> the property beb g improved, and, if different from the owner, the contracting public entity; the <br /> contract number assigned by the contracting public entity; and a description of the project <br /> t t <br /> i <br /> sufficeno identify it, such as a 1 <br /> i egal desciription or the street address of the property being <br /> improved, and a general descriptaon of the improvement, and the bond number. <br /> ��kk loK.ss f� �lft. Su �� l00 <br /> �.�. ►� 99 $ _ tea.'d <br /> KNOW ALL MEN BTiESE PRESENT � i <br /> BY THIS BOND we n erataTe Western <br /> �ainPnr ng rnrn`� , as Principal, and Surety Company <br /> i coEoration, as Shur t , are held and firmly bound unto the County of Indian River, Florida, in the sum of <br /> t � h: HHn�edaan� 188 16 our Thousand Dollars 4 , 600 , 00 <br /> l�_ ,, amounting to 100T0 of the total bid <br /> price. For the payment of said sum we bind ourselves , our heirs, executors; administrators and assigns, <br /> jointly and severally, for the faithful performance of a certain written Contract, dared the 44*� day of <br /> St !Ct a "' None , 2008 , entered into between the Principal and the County of Indian River, <br /> Project Name: "South RO Water Treatment Plant Improvements" <br /> County Project Bid Number: 2008027 <br /> County Project Number: UCP2859 <br /> Project Address: 1500 9d' Street (Oslo Rd.) <br /> Yero Beach. FL 32962 <br /> Project Description: <br /> I . Furnish all labor and matezials necessary to complete the South R.O . Water <br /> Treatment Plant Improvements including the following: relocation of permeate <br /> acid injector, installation of new acid supply and containment piping, <br /> rimodifications to raw water blend piping including acid injector and static mixer, <br /> remove and install three (3) new 150 hp horizontal split case high service putnns <br /> _ including bases, couplings, motors, all nuts, bolts, fasteners, guards, electrical <br /> wiring, disconnects, YFD' s, and all other appurtenances, installation of two <br /> owner=furnished PE bulk tanks including pad, demolitionof existing entrance <br /> opening, piping, valves, appurtenances and bardware, integration of SCADA <br /> System programming, modification of RO trains including replacement of sample <br /> tubing, pernuate hoses, 6" permeate headers, permeate port end adapters , <br /> appurtenances and hardware, replacement of up to &'total of twelve ( li) new 6M <br /> pressure vessels, painting and architectural treatment and accessory items, as <br /> depicted in those documents. <br /> 1 ' <br /> 044572017 <br /> 00612- 1 <br /> - - A TRUE COPY <br /> CERTIFICATION ON LAST PAGE <br /> J . K. BARTON , CLERK <br />