My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:05:33 AM
Creation date
10/1/2015 12:33:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Alternate Name
IEC
Supplemental fields
SmeadsoftID
7554
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval referred to in the Contract Documents, Contractor and Owner respectively are required to <br /> or purchase and maintain in accordance with Article 5 . <br /> c . has been damaged prior to Engineer' s - 2 .02 Copies of Documents <br /> recommendation of final payment (unless <br /> responsibility for the protection thereof has been A. Owner shall furnish to Contractor up to ten printed or <br /> assumed by Owner at Substantial Completion in hard copies of the Drawings and Project Manual . <br /> accordance with Paragraph 14 . 04 or 14 . 05 ) . Additional copies will be furnished upon request at the <br /> cost of reproduction . <br /> 2 . 03 Commencement of Contract Times; Notice to <br /> Proceed <br /> E . Furnish, Install, Perform, Provide <br /> A. The Contract Times will commence to run on the <br /> 1 . The word "furnish, " when used in connection thirtieth day after the Effective Date of the Agreement or, <br /> with services, materials, or equipment, shall mean to if a Notice to Proceed is given, on the day indicated in the <br /> supply and deliver said services, materials , or Notice to Proceed. A Notice to Proceed may be given at <br /> equipment to the Site (or some other specified any time within 30 days after the Effective Date of the <br /> location) ready for use or installation and in usable or Agreement. In no event will the Contract Times com- <br /> operable condition. mence to run later than the sixtieth day after the day of <br /> Bid opening or the thirtieth day after the Effective Date of <br /> 2 . The word "install," when used in connection the Agreement, whichever date is earlier. <br /> with services, materials, or equipment, shall mean to <br /> put into use or place in final position said services, 2 . 04 Starting the Work <br /> materials, or equipment complete and ready for <br /> intended use . A. Contractor shall start to perform the Work on the date <br /> when the Contract Times commence to run . No Work <br /> 3 . The words "perform" or "provide," when used in shall be done at the Site prior to the date on which the <br /> connection with services, materials, or equipment, Contract Times commence to run. <br /> shall mean to furnish and install said services, <br /> materials , or equipment complete and ready for 2 .05 Before Starting Construction <br /> intended use. <br /> A . Preliminary Schedules: Within 10 days after the <br /> 4. When "furnish," "install," "perform," or "pro- Effective Date of the Agreement (unless otherwise speci- <br /> vide" is not used in connection with services, fied in the General Requirements) , Contractor shall <br /> materials, or equipment in a context clearly requiring submit to Engineer for timely review : <br /> an obligation of Contractor, "provide" is implied. <br /> 1 . a preliminary Progress Schedule ; indicating the <br /> F . Unless stated otherwise in the Contract Documents, times (numbers of days or dates) for starting and <br /> words or phrases which have a well-known technical or completing the various stages of the Work, including_ <br /> construction industry or trade meaning are used in the any Milestones specified in the Contract Documents ; <br /> Contract Documents in accordance with such recognized <br /> meaning . 2 . a preliminary Schedule of Submittals ; and <br /> 3 . a preliminary Schedule of Values for all of the <br /> ARTICLE 2 - PRELIMINARY MATTERS Work which includes quantities and prices of items <br /> which when added together equal the Contract Price <br /> and subdivides the Work into component parts in <br /> 2 . 01 Delivery of Bonds and Evidence of Insurance sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such <br /> A. When Contractor delivers the executed counterparts of prices will include an appropriate amount of <br /> the Agreement to Owner, Contractor shall also deliver to overhead and profit applicable to each item of Work . <br /> Owner such bonds as Contractor may be required to <br /> furnish. 2 . 06 Preconstruction Conference <br /> B . Evidence of Insurance: Before any Work at the Site is A. Before any Work at the Site is started, a conference <br /> started, Contractor and Owner shall each deliver to the attended by Owner, Contractor, Engineer, and others as <br /> other, with copies to each additional insured identified in appropriate will be held to establish a working <br /> the Supplementary Conditions, certificates of insurance understanding among the parties as to the Work and to <br /> (and other evidence of insurance which either of them or discuss the schedules referred to in Paragraph 2 .05 . A, <br /> any additional insured may reasonably request) which procedures for handling Shop Drawings and other <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.