Laserfiche WebLink
Contract Documents . Engineer will also have authority to C . Engineer ' s written decision on the issue referred will <br /> require special inspection or testing of the Work as be final and binding on Owner and Contractor, subject to <br /> provided in Paragraph 13 . 04, whether or not the Work is the provisions of Paragraph 10 . 05 . <br /> fabricated, installed, or completed . <br /> D . When functioning as interpreter and judge under this <br /> 9 . 06 Shop Drawings, Change Orders and Payments Paragraph 9 . 08 , Engineer will not show partiality to <br /> Owner or Contractor and will not be liable in connection <br /> A . In connection with Engineer ' s authority, and with any interpretation or decision rendered in good faith <br /> limitations thereof, as to Shop Drawings and Samples, see in such capacity . <br /> Paragraph 6 . 17 . <br /> 9 . 09 Limitations on Engineer 's Authority and <br /> B . In connection with Engineer' s authority, and Responsibilities <br /> limitations thereof, as to design calculations and design <br /> drawings submitted in response to a delegation of A. Neither Engineer ' s authority or responsibility under <br /> professional design services , if any, see Paragraph 6 . 21 . this Article 9 or under any other provision of the Contract <br /> Documents nor any decision made by Engineer in good <br /> C . In connection with Engineer' s authority as to Change faith either to exercise or not exercise such authority or <br /> Orders, see Articles 10, 11 , and 12 . responsibility or the undertaking, exercise, or <br /> performance of any authority or responsibility by <br /> D . In connection with Engineer' s authority as to Engineer shall create, impose, or give rise to any duty in <br /> Applications for Payment, see Article 14 . contract, tort, or otherwise owed by Engineer to <br /> Contractor, any Subcontractor, any Supplier, any other <br /> 9 .07 Determinations for Unit Price Work individual or entity, or to any surety for or employee or <br /> agent of any of them. <br /> A. Engineer will determine the actual quantities and <br /> classifications of Unit Price Work performed by B . Engineer will not supervise, direct, control, or have <br /> Contractor. Engineer will review with Contractor the authority over or be responsible for Contractor ' s means , <br /> Engineer ' s preliminary determinations on such matters methods, techniques, sequences, or procedures of <br /> before rendering a written decision thereon (by construction, or the safety precautions and programs <br /> recommendation of an Application for Payment or incident thereto , or for any failure of Contractor to <br /> otherwise). Engineer ' s written decision thereon will be comply with Laws and Regulations applicable to the <br /> final and binding (except as modified by Engineer to performance of the Work. Engineer will not be respon- <br /> reflect changed factual conditions or more accurate data) sible for Contractor ' s failure to perform the Work in <br /> upon Owner and Contractor, subject to the provisions of accordance with the Contract Documents . <br /> Paragraph 10 . 05 . <br /> C . Engineer will not be responsible for the acts or <br /> 9 . 08 Decisions on Requirements of Contract omissions of Contractor or of any Subcontractor, any <br /> Documents and Acceptability of Work Supplier, or of any other individual or entity performing <br /> any of the Work . <br /> A. Engineer will be the initial interpreter of the <br /> requirements of the Contract Documents and judge of the D . Engineer ' s review of the final Application for Payment <br /> acceptability of the Work thereunder. All matters in and accompanying documentation and all maintenance <br /> question and other matters between Owner and Contractor and operating instructions, schedules, guarantees, bonds, <br /> arising prior to the date final payment is due relating to certificates of inspection, tests and approvals, and other <br /> the acceptability of the Work, and the interpretation of the documentation required to be delivered by Paragraph <br /> requirements of the Contract Documents pertaining to the 14 . 07 .A will only be to determine generally that their <br /> performance of the Work, will be referred initially to content complies with the requirements of, and in the case <br /> Engineer in writing within 30 days of the event giving rise of certificates of inspections, tests, and approvals that the <br /> to the question results certified indicate compliance with the Contract <br /> Documents . <br /> B . Engineer will, with reasonable promptness, render a <br /> written decision on the issue referred. If Owner or E. The limitations upon authority and responsibility set <br /> Contractor believe that any such decision entitles them to forth in this Paragraph 9 .09 shall also apply to, the <br /> an adjustment in the Contract Price or Contract Times or Resident Project Representative, if any, and assistants, if <br /> both, a Claim may be made under Paragraph 10 .05 . The any. <br /> date of Engineer ' s decision shall be the date of the event <br /> giving rise to the issues referenced for the purposes of <br /> Paragraph 10 .05 . 13 . <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 28 <br />