My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:13:27 AM
Creation date
10/1/2015 12:33:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276A
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Improvements Conditions of Contract
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 . 02 . Utilities . The Contractor shall , at its expense, arrange for, develop and maintain all utilities in Work <br /> areas to meet the requirements of the Contract . Such utilities shall be furnished by Contractor at no additional <br /> cost to the Owner, and shall include, but not be limited to the following : public telephone service for the <br /> Contractor ' s use ; construction power as required at each point of construction; and water as required <br /> throughout the construction . Prior to final acceptance of the Work the Contractor shall , at its expense, <br /> satisfactorily remove and dispose of all temporary utilities developed to meet the requirements of the Contract. <br /> The Owner will assume the utility costs directly related to its usage of areas in which it has taken Beneficial <br /> Occupancy. <br /> 17 . 03 . Drainage . The Contractor shall so conduct its operations and maintain the Work in such condition that <br /> adequate drainage will be in effect at all times . Existing functioning storm sewers, gutters, ditches, and other <br /> run-off shall not be obstructed. <br /> 17 . 04 . Fire Hydrants . Fire hydrants on or adjacent to the highway shall be kept accessible to fire apparatus at <br /> all times and no material or obstruction shall be placed within fifteen feet ( 15 ' ) of any such hydrant. <br /> 17 . 05 . Protection of Structures . Heavy equipment shall not be operated close enough to pipe headwalls or <br /> other structures to cause their displacement. <br /> 17 . 06 . Fencing. On all Work which includes fencing and where the Engineer determines it to be necessary <br /> for maintaining the security of livestock or adjacent property, or for protection of pedestrians who are likely to <br /> gain access to the Work from adjacent property, the Contractor shall erect an appropriate temporary security <br /> fence as a first order of business . Temporary fencing shall be installed at temporary construction easement <br /> areas on all commercial and residential properties appropriate to secure the Work area and protect persons and <br /> domestic animals . At all times, the Contractor shall conduct the Work under secure temporary fencing. <br /> Permanent fencing shall be addressed as required by the Plans and Specifications . <br /> 17 . 07 . Record Drawings, The Contractor shall keep one record copy of all Specifications , Drawings, <br /> Addenda, Modifications, and Shop Drawings at the site in good order and annotated to show all changes made <br /> during the construction process . These items shall be available to the Engineer and shall be delivered to the <br /> Engineer for the Owner. Record Drawings shall be submitted with each pay request. Final acceptance of the <br /> Work will be withheld until the approval of such documents are made by the Owner. <br /> 17 . 08 . Progress Videotapes . Contractor shall deliver to the Owner both prior to commencing the Project and <br /> before receipt of Final Payment, VHS Type color videotape of the Project showing the site before and after <br /> Work has been completed. Contractor shall audibly identify on the videotape the station numbers as those <br /> areas of the Project are taped . The cost of the videotaping is included in the bid submitted by the Contractor. <br /> 17 . 09 . Commercial Activities . Contractor shall not establish any commercial activity or issue concessions or <br /> 044572017 <br /> 00800- 19 <br />