17.02. Utilities. The Contractor shall, at its expense, arrange for, develop and maintain all utilities in Work <br />areas to meet the requirements of the Contract. Such utilities shall be furnished by Contractor at no additional <br />cost to the Owner, and shall include, but not be limited to the following: public telephone service for the <br />Contractor's use; construction power as required at each point of construction; and water as required <br />throughout the construction. Prior to final acceptance of the Work the Contractor shall, at its expense, <br />satisfactorily remove and dispose of all temporary utilities developed to meet the requirements of the Contract. <br />The Owner will assume the utility costs directly related to its usage of areas in which it has taken Beneficial <br />Occupancy. <br />17.03. Drainage. The Contractor shall so conduct its operations and maintain the Work in such condition that <br />adequate drainage will be in effect at all times. Existing functioning storm sewers, gutters, ditches, and other <br />run-off shall not be obstructed. <br />17.04. Fire Hydrants. Fire hydrants on or adjacent to the highway shall be kept accessible to fire apparatus at <br />all times and no material or obstruction shall be placed within fifteen feet (15') of any such hydrant. <br />17.05. Protection of Structures. Heavy equipment shall not be operated close enough to pipe headwalls or <br />other structures to cause their displacement. <br />17.06. Fencing. On all Work which includes fencing and where the Engineer determines it to be necessary <br />for maintaining the security of livestock or adjacent property, or for protection of pedestrians who are likely to <br />gain access to the Work from adjacent property, the Contractor shall erect an appropriate temporary security <br />fence as a first order of business. Temporary fencing shall be installed at temporary construction easement <br />areas on all commercial and residential properties appropriate to secure the Work area and protect persons and <br />domestic animals. At all times, the Contractor shall conduct the Work under secure temporary fencing. <br />Permanent fencing shall be addressed as required by the Plans and Specifications. <br />17.07. Record Drawings. The Contractor shall keep one record copy of all Specifications, Drawings, <br />Addenda, Modifications, and Shop Drawings at the site in good order and annotated to show all changes made <br />during the construction process. These items shall be available to the Engineer and shall be delivered to the <br />Engineer for the Owner. Record Drawings shall be submitted with each pay request. Final acceptance of the <br />Work will be withheld until the approval of such documents are made by the Owner. <br />17.08. Progress Videotapes. Contractor shall deliver to the Owner both prior to commencing the Project and <br />before receipt of Final Payment, VHS Type color videotape of the Project showing the site before and after <br />Work has been completed. Contractor shall audibly identify on the videotape the station numbers as those <br />areas of the Project are taped. The cost of the videotaping is included in the bid submitted by the Contractor. <br />17.09. Commercial Activities. Contractor shall not establish any commercial activity or issue concessions or <br />044572017 <br />00800-19 <br />