My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br /> FIELD ENGINEERING <br /> PART1 GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . Provide and pay for field engineering services required for project . <br /> 1 . Survey work required in execution of project. <br /> 2 . Civil , structural or other professional Engineering services specified, or required <br /> to execute Contractor' s construction methods . <br /> B . The Contractor shall retain the services of a registered land surveyor licensed in the State <br /> of Florida: <br /> 1 . Identify existing control points and property line corner stakes indicated on the <br /> Drawings , as required . <br /> 2 . Verify all existing structure locations and all proposed building and structure <br /> corner locations, tank locations and equipment locations . <br /> 3 . Maintain an accurate location of all buried piping 4-inch in diameter and larger. <br /> 1 .02 RELATED WORK <br /> A. Standard General Conditions of the- Construction Contract are included in Section 0700 . <br /> B . Summary of Work is included in Section 0 10 10 . <br /> C. Applications for Payment are included in Section 01052 , <br /> D . Contract Closeout is included in Section 01700 . <br /> I <br /> 1 .03 SUBMITTALS <br /> A. Submit, in accordancewith Section 01340, name and address of registered land surveyor <br /> or professional Engineer. <br /> B . On request of the Engineer, submit documentation to verify accuracy of field engineering <br /> work <br /> C. Submit certificate signed by registered Engineer or land surveyor certifying that elevations <br /> and locations of improvements are in conformance, or non-conformance, with Contract <br /> +, Documents. <br /> I <br /> D . At the end of the project, and prior to final payment, submit certified drawings with the <br /> Surveyor' s title block (signed and sealed by the registered land surveyor) of the items <br /> listed below. Vertical Control shall conform to NGVD mean sea level datum. These <br /> drawings shall be included with, and made a part of, the project record documents. <br /> 044572017 <br /> 01050- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.