Laserfiche WebLink
SECTION 01050 <br />FIELD ENGINEERING <br />1.01 SCOPE OF WORK <br />A. Provide and pay for field engineering services required for project. <br />1. Survey work required in execution of project. <br />2. Civil, structural or other professional Engineering services specified, or required <br />to execute Contractor's construction methods. <br />B. The Contractor shall retain the services of a registered land surveyor licensed in the State <br />of Florida: <br />1. Identify existing control points and property line corner stakes indicated on the <br />Drawings, as required. <br />2. Verify all existing structure locations and all proposed building and structure <br />corner locations, tank locations and equipment locations. <br />3. Maintain an accurate location of all buried piping 4 -inch in diameter and larger. <br />1.02 RELATED WORK <br />A. Standard General Conditions of the Construction Contract are included in Section 0700. <br />B. Summary of Work is included in Section 0 10 10. <br />C. Applications for Payment are included in Section 01052, <br />D. Contract Closeout is included in Section 01700. <br />1.03 SUBMITTALS <br />A. Submit, in accordancewith Section 01340, name and address of registered land surveyor <br />or professional Engineer. <br />B. On request of the Engineer, submit documentation to verify accuracy of field engineering <br />work <br />C. Submit certificate signed by registered Engineer or land surveyor certifying that elevations <br />and locations of improvements are in conformance, or non-conformance, with Contract <br />Documents, <br />D. At the end of the project, and prior to final payment, submit certified drawings with the <br />Surveyor's title block (signed and sealed by the registered land surveyor) of the items <br />listed below. Vertical Control shall conform to NGVD mean sea level datum. These <br />drawings shall be included with, and made a part of, the project record documents. <br />044572017 <br />01050-1 <br />