My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Establish a minimum of two permanent bench marks on site, refer <br /> by survey control points. <br /> 1 . Record locations, with horizontal and vertical data, on P <br /> B . Establish lines and levels, locate and lay out, by instnunentatiu; . <br /> means : <br /> 1 . Site improvements <br /> a. Stakes for grading, fill and topsoil placement_ <br /> b . Utility slopes and invert elevations . <br /> 2 . Batter boards for structures . <br /> 3 . Building foundation, column locations and floor levels . <br /> 4 . Controlling lines and levels required for mechanical and electrical trades . <br /> C . From time to time, verify layouts by same methods. <br /> D. Establish all lines and grades prior to construction of line work for all piping 4 inches in <br /> diameter and larger at 50-feet increments and at defined breaks in grade. <br /> 1 .07 RECORDS <br /> A . Maintain a complete, accurate log of all control and survey work as it progresses . <br /> B . Update the project record drawings on a monthly basis based on the work performed <br /> during the month ending at the pay request as a condition for approval of monthly <br /> progress payment requests . <br /> C. Maintain an accurate record of piping changes, revisions, and modifications. <br /> PART 2 PRODUCTS (NOT USED) <br /> PART 3 EXECUTION (NOT USED) <br /> I <br /> END OF SECTION <br /> I <br /> I <br /> 1 <br /> l <br /> l <br /> 044572017 <br /> 01050-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.