My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:20:30 AM
Creation date
10/1/2015 12:34:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276B
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Supplementary Conditions
Area
South County RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART 1 - GENERAL <br /> 1 .01 PERMITS REQUIRED <br /> A . Florida Department of Environmental Protection : The water plant construction permit <br /> from the Florida Department of Environmental Protection (FDEP) for the project has been <br /> issued . <br /> B . Building Permits : The County is currently in the process of obtaining a site plan <br /> approval permit for the site and expects to obtain the permit prior to Notice of Award. <br /> The Contractor is required to obtain all applicable local building permits from the <br /> County, such as concrete, plumbing, and electrical permits . The cost of these permits is <br /> to be drawn from an allowance to be included in the bid amount . Unused portions of the <br /> allowance for permits is to be returned to the County by final change order in the form of <br /> a deduct. Permit fees in excess of the allowance will be compensated by means of <br /> change order process . <br /> C. Other Permits Required: The Contractor is responsible for obtaining any temporary <br /> discharge permits that may be required by local drainage districts. <br /> 1 .02 NOTIFICATION <br /> ! A. Indian River County: The Contractor is required to notify the Indian River County Utilities <br /> Department 48 hours prior to initiating construction (Mike Hotchkiss, 772426- 1835) . <br /> iB . Utility Companies : Contractor shall notify the following known utility companies in the <br /> area 48 hours prior to initiating construction: <br /> U .N.C.L.E. , 1 -800-432-4770 <br /> Southern Bell Telephone, W.G. Gallagher, 561468-5538 <br /> i TCI Cablevision, Craig Bowers, 561-567-3444 Ext. 51 <br /> A list of contacts can be obtained by contacting (Mike Hotchkiss, 772-226- <br /> 1835) , <br /> t <br /> C . The Contractor shall give the Owner not less than seven (7) calendar days notice of the <br /> f time and place (or places) where he will start the work. <br /> I D. When the Contractor's excavating operations encounter prehistoric remains or artifacts of <br /> historical or archeological significance, the operations shall be temporarily discontinued in <br /> 1 that area and the Engineer -shall be notified. The Engineer will consult archaeological <br /> authorities and determine the disposition of the remains or artifacts. The Contractor agrees <br /> that he will make no claim for additional payment or for extension of time because of any <br /> delays in or alteration of his procedure due to removal of any such remains or artifacts. <br /> l <br /> 044572017 <br /> 01060- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.