Laserfiche WebLink
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART 1 - GENERAL <br /> 1 .01 PERMITS REQUIRED <br /> A . Florida Department of Environmental Protection : The water plant construction permit <br /> from the Florida Department of Environmental Protection (FDEP) for the project has been <br /> issued . <br /> B . Building Permits : The County is currently in the process of obtaining a site plan <br /> approval permit for the site and expects to obtain the permit prior to Notice of Award. <br /> The Contractor is required to obtain all applicable local building permits from the <br /> County, such as concrete, plumbing, and electrical permits . The cost of these permits is <br /> to be drawn from an allowance to be included in the bid amount . Unused portions of the <br /> allowance for permits is to be returned to the County by final change order in the form of <br /> a deduct. Permit fees in excess of the allowance will be compensated by means of <br /> change order process . <br /> C. Other Permits Required: The Contractor is responsible for obtaining any temporary <br /> discharge permits that may be required by local drainage districts. <br /> 1 .02 NOTIFICATION <br /> ! A. Indian River County: The Contractor is required to notify the Indian River County Utilities <br /> Department 48 hours prior to initiating construction (Mike Hotchkiss, 772426- 1835) . <br /> iB . Utility Companies : Contractor shall notify the following known utility companies in the <br /> area 48 hours prior to initiating construction: <br /> U .N.C.L.E. , 1 -800-432-4770 <br /> Southern Bell Telephone, W.G. Gallagher, 561468-5538 <br /> i TCI Cablevision, Craig Bowers, 561-567-3444 Ext. 51 <br /> A list of contacts can be obtained by contacting (Mike Hotchkiss, 772-226- <br /> 1835) , <br /> t <br /> C . The Contractor shall give the Owner not less than seven (7) calendar days notice of the <br /> f time and place (or places) where he will start the work. <br /> I D. When the Contractor's excavating operations encounter prehistoric remains or artifacts of <br /> historical or archeological significance, the operations shall be temporarily discontinued in <br /> 1 that area and the Engineer -shall be notified. The Engineer will consult archaeological <br /> authorities and determine the disposition of the remains or artifacts. The Contractor agrees <br /> that he will make no claim for additional payment or for extension of time because of any <br /> delays in or alteration of his procedure due to removal of any such remains or artifacts. <br /> l <br /> 044572017 <br /> 01060- 1 <br />