Laserfiche WebLink
2.04 TEMPORARY WATER CONTROL <br />A. The flow of water through the construction site shall be controlled by the Contractor such <br />that it does not damage any constructed items; however, it shall be diverted and <br />channeled to effectively leave the site as soon as possible. Puddling and ponding on the <br />site is not permitted. <br />B. Water shall be controlled such that it does not enter excavated areas, nor is deposited on <br />or against constructed features. <br />2.05 TEMPORARY DEBRIS CONTROL <br />A. Provision shall be made by each Contractor to have available adequate containers to hold <br />any and all debris that is to be generated from the project. Containers should be covered <br />to prevent wind blowing paper, plastic, and lightweight products around and off the site. <br />B. Instructions shall be given to personnel to utilize the trash containers. Containers shall be <br />placed in convenient places at the site. <br />C. At least once per week, a thorough cleaning of trash and debris shall be made at the <br />construction site. An acceptable method of disposal shall be employed. <br />END OF SECTION <br />044572017 <br />01560-2 <br />