My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . When Engineer concurs that the work is substantially complete, he will: <br /> 1 • Prepare a Certificate of Substantial Completion, accompanied by a list of <br /> items to be completed or corrected <br /> 2 . Submit the Certificate to Owner and Contractor for their written <br /> acceptance of the responsibilities assigned to them in the certificate. <br /> 1 . 03 FINAL INSPECTION <br /> A . When Contractor considers the work is complete , he shall submit written <br /> certification that : <br /> 1 . Contract Documents have been reviewed <br /> 2 . Work has been inspected for compliance with Contract Documents <br /> 3 . Work has been completed in accordance with Contract Documents <br /> 4 . Equipment and systems have been tested in the presence of the Owner' s <br /> representative and are operational <br /> 5 . Equipment and systems instructions to Owner' s personnel have been <br /> completed in accordance with Section 01730 <br /> 6 . Work is completed and ready for final inspection <br /> B . Engineer will make an inspection to verify the status of completion with <br /> reasonable promptness after receipt of such certification . <br /> C . Should Engineer consider that the work is incomplete or defective: <br /> 1 . Engineer will promptly notify the Contractor, in writing, listing the <br /> incomplete or defective work. <br /> 2 . Contractor shall take immediate steps to remedy the stated deficiencies, <br /> and send a second written certification to Engineer that the work is <br /> complete. <br /> 3 . Engineer will re-inspect the work <br /> D . When Engineer finds that the work is acceptable under the Contract Documents, <br /> he shall request the Contractor to make closeout submittals. <br /> 1 .04 RE-INSPECTION FEES <br /> Should the Engineer perform reinspection due to failure of the work to comply with the <br /> claims of status of completion made by the Contractor, Contractor will compensate <br /> Engineer/Owner for such additional services. <br /> 1 .05 ADDITIONAL SERVICES <br /> Should Engineer be required to provide representation at the site for the administration of <br /> the Contract for Construction, more than thirty days after the specified Date of <br /> Substantial Completion of the work, Contractor will compensate Engineer for such <br /> additional services . <br /> 044572017 <br /> 01700 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.