Laserfiche WebLink
SECTION 01710 <br /> CLEANING <br /> PART 1 — GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . Execute cleaning, during progress of the work, and at completion of the work, as required <br /> by General Conditions . <br /> 1 .02 RELATED WORK <br /> A. Standard General Conditions of the Construction Contract are included in Section 00700 . <br /> B . Each Section: Cleaning for specific products or work. <br /> 1 .03 DISPOSAL AND CLEANING <br /> A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations <br /> and anti-pollution laws . <br /> PART 2 — PRODUCTS <br /> 2 .01 MATERIALS <br /> A. Use only those cleaning materials which will not create hazards to health or property and <br /> which will not damage surfaces. <br /> IB . Use only those cleaning materials and methods recommended by manufacturer of the <br /> surface material to be cleaned. <br /> C . Use cleaning materials only on surfaces recommended by cleaning material manufacturer. <br /> PART 3 — EXECUTION <br /> 3 .01 DURING CONSTRUCTION <br /> 1 A. Execute periodic cleaning to keep the work, the site and adjacent properties free from <br /> accumulations of waste materials, rubbish and windblown debris, resulting from <br /> construction operations. <br /> I - B , Provide on-site containers for the collection of waste materials, debris and rubbish. <br /> i C . Remove waste materials, debris and rubbish from the site periodically and dispose of at <br /> { legal disposal areas away from the site. <br /> l <br /> 044572017 <br /> 017104 <br />