My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01720 <br /> PROJECT RECORD DOCUMENTS <br /> PARTI GENERAL <br /> 1 .01 REQUIREMENTS INCLUDED <br /> A . Maintain at the site for the Owner one record copy of: <br /> 1 . Drawings <br /> 2 . Specifications <br /> 3 . Addenda <br /> 4 . Change Orders and other Modifications to the Contract <br /> 5 . Engineer ' s Field Orders or written instructions <br /> 6 . Approved Shop Drawings, Working Drawings and Samples <br /> 7 . Field Test records <br /> 8 . Construction photographs <br /> 9 . Field engineering records for compliance with field engineering submittals <br /> 1 .02 RELATED REQUIREMENTS <br /> A . Section 01050 : Field Engineering <br /> B . Section 01052 : Application for Payment <br /> C . Section 01340 : Submittals <br /> D . Section 01380 : Construction Photographs <br /> 1 .03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> A. Store documents and samples in Contractor' s field office apart from documents used for <br /> construction. <br /> 1 . Provide files and racks for storage of documents. <br /> I2 . Provide locked cabinet or secure storage space for storage of samples. <br /> B . File documents and samples in accordance with CSI/CSC format. <br /> C. Maintain documents in a clean, dry, legible condition and in good order. Do not use record <br /> documents for construction purposes . <br /> D. Make documents and samples available at all times for inspection by the Resident Project <br /> Representative. <br /> iE. As a prerequisite for monthly progress payments, the Contractor is to exhibit the currently <br /> updated "record documents" for review by the Engineer and Owner. <br /> 7 <br /> 1 .04 MARKING DEVICES <br /> A. Provide felt tip marking pens for recording information in the color code designated by the <br /> IResident Project Representative, <br /> 044572017 <br /> 01720- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.