My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .07 SUBMITTAL SCHEDULE <br /> A . Submit two copies of preliminary draft of proposed Table of Contents, formats and <br /> outlines of contents of Operation and Maintenance Manuals within 90 days after Notice to <br /> Proceed . Sets of example O&M manuals are available for examination upon request. <br /> B . Submit two copies of completed data in preliminary form no later than 20 days following <br /> Engineer's review of the last shop drawing of a product and/or other submittal specified <br /> under Section 01340 , but no later than delivery of equipment . One copy will be returned <br /> with comments to be incorporated into the final copies and the other copy will be retained <br /> on-site for use in any early training . <br /> C . Submit six (6) copies of approved manual in final form directly to the offices of the <br /> Engineer, Kimley-Horn and Associates , Inc . , within 10 days after the reviewed copy or <br /> last item of the reviewed copy is returned . <br /> D . Provide six (6) copies of addenda to the operation and maintenance manuals as applicable <br /> and certificates as specified within 30 days after final inspection. <br /> 1 . 08 INSTRUCTION OF OWNER'S PERSONNEL <br /> A. Prior to demonstration test, fully instruct Owner's designated operating and maintenance <br /> personnel in operation, adjustment and maintenance of products, equipment and systems. <br /> B . Operating and maintenance manual shall constitute the basis of instruction. Review <br /> contents of manual with personnel in full detail to explain all aspects of operations and <br /> maintenance. <br /> C . Instructors shall be fully qualified personnel as outlined within the individual equipment <br /> specifications . If no specific training specifications are listed with the equipment, the <br /> Contractor shall provide the instruction with qualified Contractor personnel. <br /> D . The instructors shall provide for and prepare lesson scopes and handouts for up to five <br /> individuals designated by the Owner that outline the items to be covered. Separate <br /> sessions for operation and maintenance instruction shall be provided consecutively. <br /> Handouts shall be submitted to the Owner with at least one week's notice prior to the <br /> training sessions. <br /> E. All instruction sessions shall be video taped with portable video cameras and tapes <br /> supplied by the Contractor. Video taping shall be made by the Contractor under the <br /> direction of the Owner with conventional VCR compatible taping equipment. <br /> 044572017 <br /> 01730 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.