My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01740 <br /> WARRANTIES AND BONDS <br /> PART 1 — GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . This Section specifies general administrative and procedural requirements for warranties <br /> and bonds required by the Contract Documents, including manufacturer' s standard <br /> warranties on products and special warranties . <br /> 1 .02 RELATED WORK <br /> A. Refer to Conditions of Contract for the general requirements relating to warranties and <br /> bonds . <br /> B . General closeout requirements are included in Section 01700 Contract Closeout, <br /> C . Specific requirements for warranties for the work and products and installations that are <br /> specified to be warranted are included in the individual Sections of Division 2 through 17 . <br /> 1 .03 SUBNMALS <br /> A. Submit written warranties to the Owner prior to the date for Substantial Completion. If the <br /> Certificate of Substantial Completion designates a commencement date for warranties <br /> 'I other than the date of Substantial Completion for the work, or a designated portion of the <br /> work, submit written warranties upon request of the Owner. <br /> B . When a designated portion of the work is completed and occupied or used by the Owner, <br /> by separate agreement with the Contractor during the construction period, submit properly <br /> executed warranties to the Owner within 15 days of completion of that designated portion <br /> of the Work. <br /> C. When a special warranty is required to be executed by the Contractor or the Contractor <br /> I and a Subcontractor, supplier or manufacturer; prepare a written document that contains <br /> appropriate terms and identification, ready for execution by the required parties. Submit a <br /> draft to the Owner for approval prior to final execution. <br /> i D. Refer to individual Sections of Divisions 2 through 17 for specific content requirements, <br /> and particular requirements for submittal of special warranties . <br /> IE. At Final Completion compile two copies of each required warranty and bond properly <br /> executed by the Contractor, or by the Contractor, Subcontractor, supplier, or manufacturer. <br /> Organize the warranty documents into an orderly sequence based on the table of contents <br /> of the Project Manual, <br /> I <br /> 044572017 <br /> 01740 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.