Laserfiche WebLink
SECTION 01740 <br /> WARRANTIES AND BONDS <br /> PART 1 — GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A . This Section specifies general administrative and procedural requirements for warranties <br /> and bonds required by the Contract Documents, including manufacturer' s standard <br /> warranties on products and special warranties . <br /> 1 .02 RELATED WORK <br /> A. Refer to Conditions of Contract for the general requirements relating to warranties and <br /> bonds . <br /> B . General closeout requirements are included in Section 01700 Contract Closeout, <br /> C . Specific requirements for warranties for the work and products and installations that are <br /> specified to be warranted are included in the individual Sections of Division 2 through 17 . <br /> 1 .03 SUBNMALS <br /> A. Submit written warranties to the Owner prior to the date for Substantial Completion. If the <br /> Certificate of Substantial Completion designates a commencement date for warranties <br /> 'I other than the date of Substantial Completion for the work, or a designated portion of the <br /> work, submit written warranties upon request of the Owner. <br /> B . When a designated portion of the work is completed and occupied or used by the Owner, <br /> by separate agreement with the Contractor during the construction period, submit properly <br /> executed warranties to the Owner within 15 days of completion of that designated portion <br /> of the Work. <br /> C. When a special warranty is required to be executed by the Contractor or the Contractor <br /> I and a Subcontractor, supplier or manufacturer; prepare a written document that contains <br /> appropriate terms and identification, ready for execution by the required parties. Submit a <br /> draft to the Owner for approval prior to final execution. <br /> i D. Refer to individual Sections of Divisions 2 through 17 for specific content requirements, <br /> and particular requirements for submittal of special warranties . <br /> IE. At Final Completion compile two copies of each required warranty and bond properly <br /> executed by the Contractor, or by the Contractor, Subcontractor, supplier, or manufacturer. <br /> Organize the warranty documents into an orderly sequence based on the table of contents <br /> of the Project Manual, <br /> I <br /> 044572017 <br /> 01740 - 1 <br />