My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:25:39 AM
Creation date
10/1/2015 12:34:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 C
Agenda Item Number
8.DD
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Technical Specifications
Area
South RO Water Treatment Plant
Project Number
UCP2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 04340 <br /> REINFORCED UNIT MASONRY SYSTEM <br /> PARTI - GENERAL <br /> 1 .01 SECTION INCLUDED <br /> A . Concrete masonry units . <br /> B . Reinforcement, anchorage, and accessories . <br /> 1 .02 RELATED SECTIONS <br /> A. Section 03200 - Concrete Reinforcement <br /> B . Section 03300 - Cast-in-place Concrete <br /> 1 .03 REFERENCES <br /> A. ASTM A615 - Deformed and Plain Billet Steel Bars for Concrete Reinforcement, <br /> B . ASTM C90 - Hollow Load Bearing Concrete Masonry Units. <br /> 1 .04 SUBMITTALS <br /> A. Submit manufacturer's certificate under provisions of Section 01300 that products meet or <br /> exceed specified requirements. <br /> i 1 .05 QUALITY ASSURANCE <br /> A. Installer : Company specializing in performing the work of this Section with minimum three <br /> years documented experience. <br /> B . Masonry construction and materials shall conform to all requirements of "Specifications for <br /> Masonry Structures (ACI 530 . 1 /ASCE 6/TMS 602)7" published by the American Concrete <br /> Institute, Detroit, Michigan, except as modified by the requirements of these Plans and <br /> Contract documents . <br /> l1 .06 PRODUCT DELIVERY, STORAGE, AND HANDLING <br /> A. Damaged masonry wits, damaged structure components, and damaged packaged material <br /> I shall not be accepted. <br /> B . Failure to detect defective work or material shall not in any way prevent later rejection when <br /> the defect is discovered, nor shall it obligate the Engineer for Final Acceptance. <br /> 1 <br /> C. The Owner shall have the right to have tested, at the Contractor' s expense, using the prism <br /> test method, masonry units for compressive strength, should any of the masonry units fail to <br /> I044572017 <br /> I 04340- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.