My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 11930 <br /> PUMPS-GENERAL <br /> PART 1 - GENERAL <br /> 1 .01 DESCRIPTION OF WORK <br /> The work covered by this section and the related sections consists of providing all labor, material , <br /> equipment and performing all construction required to install vertical pumps, motors, and pump <br /> control valves, including all accessories as specified and shown on the drawings. <br /> 1 .02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br /> A. Section 01300 - Submittals <br /> B . Section 01730 - Operating and Maintenance Manuals <br /> C. Section 11934 - Horizontal Service Pumps-Horizontal Split Case <br /> 1 .03 PUMP PERFORMANCE DATA <br /> A. Certified pump performance data (curves) are to be submitted to the Engineer for the pumps <br /> prior to delivery and pump installation. Performance data must be the results of actual pump <br /> operation of a complete pump assembly before shipment of pump. Also report amperage and <br /> voltage of each power leg, efficiency, horsepower. <br /> B . Pump shall not overload the motor across the etitire operating curve of the pump. <br /> f1 .04 QUALITY ASSURANCE <br /> 1 . Provide shop drawings in accordance with Section 01340. <br /> 2. Provide operation and maintenance material and record drawings in accordance with Section <br /> 01720 and 01730 . <br /> 3 . Provide manufacturer's certification of correct installation after manufacture's inspection. <br /> fPART 2 - PRODUCTS <br /> Not used. <br /> PART 3 - EXECUTION <br /> 3.01 Install all equipment in strict conformance with the manufacturers specifications and industry <br /> standards. Perform all work in a workmanldw manner. <br /> I <br /> 044572015 <br /> 11930- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.