Laserfiche WebLink
SECTION 11930 <br /> PUMPS-GENERAL <br /> PART 1 - GENERAL <br /> 1 .01 DESCRIPTION OF WORK <br /> The work covered by this section and the related sections consists of providing all labor, material , <br /> equipment and performing all construction required to install vertical pumps, motors, and pump <br /> control valves, including all accessories as specified and shown on the drawings. <br /> 1 .02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br /> A. Section 01300 - Submittals <br /> B . Section 01730 - Operating and Maintenance Manuals <br /> C. Section 11934 - Horizontal Service Pumps-Horizontal Split Case <br /> 1 .03 PUMP PERFORMANCE DATA <br /> A. Certified pump performance data (curves) are to be submitted to the Engineer for the pumps <br /> prior to delivery and pump installation. Performance data must be the results of actual pump <br /> operation of a complete pump assembly before shipment of pump. Also report amperage and <br /> voltage of each power leg, efficiency, horsepower. <br /> B . Pump shall not overload the motor across the etitire operating curve of the pump. <br /> f1 .04 QUALITY ASSURANCE <br /> 1 . Provide shop drawings in accordance with Section 01340. <br /> 2. Provide operation and maintenance material and record drawings in accordance with Section <br /> 01720 and 01730 . <br /> 3 . Provide manufacturer's certification of correct installation after manufacture's inspection. <br /> fPART 2 - PRODUCTS <br /> Not used. <br /> PART 3 - EXECUTION <br /> 3.01 Install all equipment in strict conformance with the manufacturers specifications and industry <br /> standards. Perform all work in a workmanldw manner. <br /> I <br /> 044572015 <br /> 11930- 1 <br />