SECTION 11934 <br />HIGH SERVICE PUMPS — HORIZONTAL SPLIT CASE <br />PARTI-GENERAL <br />1.01 DESCRIPTION OF WORK <br />A. Furnish all labor, material, equipment, and incidentals required to remove existing high <br />service pumps No. 1, 2, and 3 and install three (3) new horizontal split case high service <br />pumps, bases, couplings, motors, all nuts, bolts, fasteners, guards, and all other <br />appurtenances including necessary field time to perform start-up services. The contractor is <br />required to repair/modify the existing concrete pump pedestals and pipe supports as needed <br />for installation of the new high service pumps as shown on the plans. The pumping units <br />specified herein shall be supplied by a single manufacturer. <br />B. Furnish all labor, material, equipment, and incidentals required to replace a complete rotating <br />element, with a new one, on one (1) of the existing high service pumps once it has been <br />removed from service. The rehabilitated unit will be a shelf spare for the Owner. The <br />contractor shall coordinate with Hudson Pump so that the pump rehabilitation can be <br />performed onsite once one of the existing high service pumps has been removed from <br />service. Contact Jim Walton with Hudson Pump at 863-665-7867 to coordinate costs and <br />scheduling of work. Rehabilitation of the one (1) high service pump must be coordinated <br />with the Owner as to not interrupt water plant operations. The materials of construction and <br />performance of the new rotating element must comply with the specifications for the <br />proposed high service pumps. <br />C. These Specifications are intended to give a general description of what is required, but do not <br />cover all details which will vary in accordance with the requirements of the equipment <br />application. It is, however, intended to cover the furnishing, the shop testing, the delivery <br />and complete installation and start up (including field testing) of all materials, equipment and <br />appurtenances for the complete pumping unit as herein specified, whether specifically <br />mentioned in these specifications or not. <br />D. No more than one high service pump can be out of service at any time. No high service <br />pump can be out of service for any longer than 10 days during the replacement/start-up <br />process. <br />E. Each high service pump must be installed, tested, disinfected, and fully operational before <br />removing the next high service pump. <br />1.02 RELATED SECTIONS <br />A. Section 01340 - Submittals <br />B. Section 02050 - Demolition <br />C. Section 09900 - Painting <br />044572017 <br />11934-1 <br />