SECTION 11934 <br /> HIGH SERVICE PUMPS — HORIZONTAL SPLIT CASE <br /> PARTI - GENERAL <br /> 1 . 01 DESCRIPTION OF WORK <br /> A . Furnish all labor, material , equipment, and incidentals required to remove existing high <br /> service pumps No. 1 , 2 , and 3 and install three (3 ) new horizontal split case high service <br /> pumps , bases, couplings , motors, all nuts, bolts, fasteners, guards, and all other <br /> appurtenances including necessary field time to perform start-up services . The contractor is <br /> required to repair/modify the existing concrete pump pedestals and pipe supports as needed <br /> for installation of the new high service pumps as shown on the plans. The pumping units <br /> specified herein shall be supplied by a single manufacturer. <br /> B . Furnish all labor, material , equipment, and incidentals required to replace a complete rotating <br /> element, with a new one, on one ( 1 ) of the existing high service pumps once it has been <br /> removed from service . The rehabilitated unit will be a shelf spare for the Owner. The <br /> contractor shall coordinate with Hudson Pump so that the pump rehabilitation can be <br /> performed onsite once one of the existing high service pumps has been removed from <br /> service. Contact Jim Walton with Hudson Pump at 863 -665-7867 to coordinate costs and <br /> scheduling of work, Rehabilitation of the one ( 1 ) high service pump must be coordinated <br /> with the Owner as to not interrupt water plant operations. The materials of construction and <br /> performance of the new rotating element must comply with the specifications for the <br /> proposed high service pumps. <br /> C . These Specifications are intended to give a general description of what is required, but do not <br /> cover all details which will vary in accordance with the requirements of the equipment <br /> application. It is, however, intended to cover the furnishing, the shop testing, the delivery <br /> and complete installation and start up (including field testing) of all materials, equipment and <br /> appurtenances for the complete pumping unit as herein specified, whether specifically <br /> mentioned in these specifications or not. <br /> D . No more than one high service pump can be out of service at any time. No high service <br /> pump can be out of service for any longer than 10 days during the replacement/start-up <br /> I process. <br /> ( E. Each high service pump must be installed, tested, disinfected, and fully operational before <br /> removing the next high service pump. <br /> 1 .02 RELATED SECTIONS <br /> A. Section 01340 - Submittals <br /> I <br /> B . Section 02050 - Demolition <br /> C . Section 09900 - Painting <br /> 044572017 <br /> 11934- 1 <br />