My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 09900 <br /> PAINTING <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE <br /> A . Furnish all labor, surface preparation and coating material , tools, rigging, lighting, ventilation , <br /> and other related items of equipment and materials necessary to clean , prepare, coat, cure and <br /> cleanup a complete coating system on all interior and exterior exposed items and surfaces <br /> throughout the project, except as otherwise specified or shown on the drawings . <br /> 1 . Surface preparation, priming, and coats of paint specified are in addition to shop priming <br /> and surface treatment specified under other sections of the work. <br /> 2 . The scope of work shall include the coating of existing equipment and surfaces which are <br /> modified by this project. Color shall match existing unless otherwise noted and shall not <br /> look like patchwork - coating shall be extended to the nearest breakline, corner, etc. as <br /> may be necessary. <br /> B . The work includes field painting of exposed bare and covered pipes and ducts, hangers, exposed <br /> steel and iron work, tanks, vessels, and primed metal surfaces of equipment installed, except as <br /> otherwise indicated. <br /> C. Paint all exposed surfaces normally painted in the execution of a new building project. Where <br /> items or surfaces are not specifically mentioned, or are not specifically excluded from the <br /> painting work, paint these the same as adjacent similar materials or areas. <br /> D . Clean, prepare, coat, and cure all surfaces in strict accordance with the manufacturer's published <br /> Irecommendations and specifications . <br /> E. Perform all work by the use of skilled workpersons in a safe and productive manner using <br /> equipment and procedures consistent with good coating practices. <br /> F. Colors are indicated on the PaintingSchedule in this section or shown on the drawings.gs If color <br /> or finish is not designated, the Engineer will select these from standard colors available for the <br /> materials system specified. <br /> i <br /> 1 .02 PAINTING NOT INCLUDED <br /> A. The following categories of work are not included as part of the field epplied finish work, or are <br /> 1 included m other sections of these specifications. <br /> 1 . Shop Priming: Unless otherwise specified, shop priming of ferrous metal items is <br /> I included under the various sections for structural steel, miscellaneous metal, metal <br /> fabrications, hollow metal work, and similar items. Also, for fabricated components such <br /> as shop-fabricated or factorybuilt mechanical and electrical equipment or accessories. <br /> l <br /> 044572017 <br /> 09900_ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.