Laserfiche WebLink
SECTION 09900 <br /> PAINTING <br /> PART 1 - GENERAL <br /> 1 .01 SCOPE <br /> A . Furnish all labor, surface preparation and coating material , tools, rigging, lighting, ventilation , <br /> and other related items of equipment and materials necessary to clean , prepare, coat, cure and <br /> cleanup a complete coating system on all interior and exterior exposed items and surfaces <br /> throughout the project, except as otherwise specified or shown on the drawings . <br /> 1 . Surface preparation, priming, and coats of paint specified are in addition to shop priming <br /> and surface treatment specified under other sections of the work. <br /> 2 . The scope of work shall include the coating of existing equipment and surfaces which are <br /> modified by this project. Color shall match existing unless otherwise noted and shall not <br /> look like patchwork - coating shall be extended to the nearest breakline, corner, etc. as <br /> may be necessary. <br /> B . The work includes field painting of exposed bare and covered pipes and ducts, hangers, exposed <br /> steel and iron work, tanks, vessels, and primed metal surfaces of equipment installed, except as <br /> otherwise indicated. <br /> C. Paint all exposed surfaces normally painted in the execution of a new building project. Where <br /> items or surfaces are not specifically mentioned, or are not specifically excluded from the <br /> painting work, paint these the same as adjacent similar materials or areas. <br /> D . Clean, prepare, coat, and cure all surfaces in strict accordance with the manufacturer's published <br /> Irecommendations and specifications . <br /> E. Perform all work by the use of skilled workpersons in a safe and productive manner using <br /> equipment and procedures consistent with good coating practices. <br /> F. Colors are indicated on the PaintingSchedule in this section or shown on the drawings.gs If color <br /> or finish is not designated, the Engineer will select these from standard colors available for the <br /> materials system specified. <br /> i <br /> 1 .02 PAINTING NOT INCLUDED <br /> A. The following categories of work are not included as part of the field epplied finish work, or are <br /> 1 included m other sections of these specifications. <br /> 1 . Shop Priming: Unless otherwise specified, shop priming of ferrous metal items is <br /> I included under the various sections for structural steel, miscellaneous metal, metal <br /> fabrications, hollow metal work, and similar items. Also, for fabricated components such <br /> as shop-fabricated or factorybuilt mechanical and electrical equipment or accessories. <br /> l <br /> 044572017 <br /> 09900_ 1 <br />