My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .06 QUALITY ASSURANCE <br /> A . Furnish all coating materials by a single manufacturer. Solvent, thinners, and other <br /> miscellaneous materials can be supplied by the same manufacturer or by a supplier approved by <br /> the manufacturer . <br /> B . Fumish a statement to the Engineer from the coatings manufacturer that materials to be used by <br /> the Contractor comply with the manufacturer' s recommendations . <br /> C . The Engineer reserves the right to require qualification of the product manufacturer and <br /> applicator, including satisfactory completion of at least two (2) projects of this nature . <br /> D . Manufacturer's Inspection Meeting: After set-up for painting but before commencing work, <br /> conduct a meeting at the site among representatives of the paint manufacturer, contractor, <br /> painting contractor, and Engineer to inspect the facility and review procedures recommended by <br /> the manufacturer for the prevailing conditions. <br /> 1 .07 REGULATORY REQUIREMENTS <br /> A. Comply with all federal, state, and local health and fire regulations when handling and applying <br /> paint and coating products. <br /> 1 .08 SUBMITTALS <br /> A. Manufacturer's Data: Submit manufacturer's technical information including paint label <br /> analysis, surface preparation and application instructions for each material proposed for use. <br /> Indicate the surfaces to which each material is to be applied . <br /> B . Samples; Painting: Submit samples for Engineer's review of color and texture only. Provide a <br /> ilisting of material and application for each coat of each finish sample. <br /> C . Manufacturer's Certificate: Submit a written certification from the paint manufacturer that <br /> materials furnished for the work meet or exceed specified requirements. <br /> D . Prepare a detailed painting schedule. List each Painting System to be used by Painting System <br /> Number, define extent and limits of each system and colors (by name and number) where <br /> appropriate. <br /> 1 .09 PRODUCT DELIVERY AND STORAGE <br /> A. Deliver all materials to the jobsite in original, new and unopened packages and containers <br /> bearing manufacturer's name and label, and the following information; <br /> 1 . Name or title of material. <br /> 2. Fed Spec. number, if applicable. <br /> +� 3 . Manufacturer's stock number and date of manufacture. <br /> 1 4 . Manufacturers name. <br /> 5 . Contents by volume, for major pigment and vehicle constituents. <br /> I 6 . Thinning instructions. <br /> l 044572017 <br /> 09900-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.