Laserfiche WebLink
Florida Department of Charlie or <br /> Governor <br /> Environmental Protection IefFKottlamp <br /> ~ Lt. Governor <br /> Central District <br /> 44 <br /> 3319 Maguire Boulevard . Suite 2324ichael W. Sole <br /> - - - - - - - - - - - - - - <br /> Orlando, Florida 32803 - 3767 Secretar♦ <br /> This permit is issued under the provisions of Chapter 403 , Florida Statutes, and Rule 62 -555 , <br /> Florida Administrative Code , (F . A . C . ) . The above named permittee is hereby authorized to <br /> perform the work shown on the application and approved drawing , plans, and other documents <br /> attached hereto or on file with the Department and made a part hereof and specifically described <br /> as follows : <br /> The project is located at the IRC South RO Plant (Oslo Road Facility), 1550 SW 9rt' Street in <br /> Vero Beach, Florida . The permitted capacity of this plant has been previously established at 8 . 57 <br /> MGD for a total system capacity of 12 . 1 MGD . The project consists of the following <br /> components or approved equivalents : <br /> • Replacement of three (3 ) existing HSPs with Model 3410M, 8x1Ox14 146 hp Goulds <br /> High Service Pumps with a design flow of 3250 gpm at 148 feet head . <br /> • Installation of profile valves, interstage butterfly valves, stage permeate control valves <br /> associated with the RO treatment trains . <br /> i • Install/replace new RO membrane elements . <br /> • Relocate the permeate acid injection and install new piping, acid injector, and static <br /> I mixer. <br /> • Relocate zinc orthophosphate chemical injection, chemical day tank, and metering pump . <br /> • Replace containment area roof. <br /> • Rehabilitation of five horizontal, single stage, centrifugal, end-suction pumping units . <br /> • Install PE bulk tanks for scale inhibitor. <br /> • Integrate improvements to SCADA system for HSPs, automation testing of the RO train, <br /> This plant is classified as Category II Class A. The certified operator requirements for this plant <br /> remain the same at staffing by Class C or higher operator: 24 hours/day for 7 days/week. The <br /> lead/chief operator must be Class A . <br /> This permit expires five years after the date of issuance . It does not pertain to any wastewater, <br /> stormwater or dredge and fill aspects of the project. <br /> l <br /> IPage 1 of 5 <br /> t <br /> 'Akre Protection, less Process " <br /> i mv. dep.state. Aus <br /> i <br />