My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Department of Charlie or <br /> Governor <br /> Environmental Protection IefFKottlamp <br /> ~ Lt. Governor <br /> Central District <br /> 44 <br /> 3319 Maguire Boulevard . Suite 2324ichael W. Sole <br /> - - - - - - - - - - - - - - <br /> Orlando, Florida 32803 - 3767 Secretar♦ <br /> This permit is issued under the provisions of Chapter 403 , Florida Statutes, and Rule 62 -555 , <br /> Florida Administrative Code , (F . A . C . ) . The above named permittee is hereby authorized to <br /> perform the work shown on the application and approved drawing , plans, and other documents <br /> attached hereto or on file with the Department and made a part hereof and specifically described <br /> as follows : <br /> The project is located at the IRC South RO Plant (Oslo Road Facility), 1550 SW 9rt' Street in <br /> Vero Beach, Florida . The permitted capacity of this plant has been previously established at 8 . 57 <br /> MGD for a total system capacity of 12 . 1 MGD . The project consists of the following <br /> components or approved equivalents : <br /> • Replacement of three (3 ) existing HSPs with Model 3410M, 8x1Ox14 146 hp Goulds <br /> High Service Pumps with a design flow of 3250 gpm at 148 feet head . <br /> • Installation of profile valves, interstage butterfly valves, stage permeate control valves <br /> associated with the RO treatment trains . <br /> i • Install/replace new RO membrane elements . <br /> • Relocate the permeate acid injection and install new piping, acid injector, and static <br /> I mixer. <br /> • Relocate zinc orthophosphate chemical injection, chemical day tank, and metering pump . <br /> • Replace containment area roof. <br /> • Rehabilitation of five horizontal, single stage, centrifugal, end-suction pumping units . <br /> • Install PE bulk tanks for scale inhibitor. <br /> • Integrate improvements to SCADA system for HSPs, automation testing of the RO train, <br /> This plant is classified as Category II Class A. The certified operator requirements for this plant <br /> remain the same at staffing by Class C or higher operator: 24 hours/day for 7 days/week. The <br /> lead/chief operator must be Class A . <br /> This permit expires five years after the date of issuance . It does not pertain to any wastewater, <br /> stormwater or dredge and fill aspects of the project. <br /> l <br /> IPage 1 of 5 <br /> t <br /> 'Akre Protection, less Process " <br /> i mv. dep.state. Aus <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.