My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-006
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 1:39:14 PM
Creation date
9/30/2015 7:12:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
01/06/2004
Control Number
2004-006
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn
Subject
Work Authorization No.4 Clearwell Pipe Project
Area
South RO Plant
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3577
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 1 <br /> ® Kimley- Horn ORIGINALhi o � � �, � <br /> and Associates , Inc . <br /> r <br /> December 9 , 2003 <br /> Mr . Aaron Bowles , P . E . 4431 Embarcadero DriveWest Palm Beach , Florida <br /> Indian River County Dept . of Utilities 33407 <br /> 1840 25th Street <br /> Vero Beach , FL 32960 <br /> Re : Work Authorization Noq <br /> Engineering Services Proposal for Miscellaneous Items at South <br /> RO Plant . <br /> Dear Aaron : <br /> Kimley-Horn and Associates , Inc . ( "KHA " ) is pleased to submit this Work <br /> Authorization request for providing engineering services related to the <br /> HYDAC sand filter installation and minor site plan modification for the <br /> South R . O . WTP Clearwell Addition and Pipe Replacement project . Our <br /> project scope of services , schedule , and fee are below . <br /> Task I — HYDAC Sand Filter Installation <br /> Design and implementation of certain peripherals to the HYDAC unit was <br /> requested from staff including drain piping alignment to on -site pond , <br /> SCADA system implementation to allow monitoring and control of the <br /> HYDAC unit , layout of HYDAC unit with new raw water piping and <br /> electrical requirements for the unit . <br /> These services include preparing construction drawings for process piping <br /> to and from the HYDAC Unit that was selected by owners representative <br /> and is being purchased by Indian River County . This task will include <br /> coordination with the on - going FRP Piping Replacement Construction <br /> project . This coordination includes providing the design of the concrete <br /> pedestals . drain piping , shop drawings , and electrical details for <br /> installation of this unit . <br /> Task 2 — Minor Site Plan Modification <br /> Assist the utility staff in preparation of the application to the Community <br /> Development Department for the minor site plan modification necessary <br /> for the contractor to obtain a building permit for the construction of the <br /> Clean.vell and Post Treatment Facility at the South R . O . WTP . This task <br /> will include a meeting with the Technical Review Committee ( TRC <br /> 7G r , <br />
The URL can be used to link to this page
Your browser does not support the video tag.