My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-043
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 1:26:53 PM
Creation date
9/30/2015 7:21:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/09/2004
Control Number
2004-043
Agenda Item Number
11.I.1
Entity Name
Kimley-Horn & Associates
Subject
Work Order No. 5 services agreement
Area
8th Ct. SW and Oslo Road
Project Number
0403
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3653
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,N <br /> 1 , 9 . 0 <br /> Board of County Commissioners 0 04 <br /> 1840 25th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567-8000 <br /> FAX: 772- 778-9391 <br /> WORK ORDER NO . 5 (Engineering) <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES , CONTRACT 0390 <br /> WITH <br /> KIMLEY-HORN & ASSOCIATES , INC . <br /> Stn Court SW / Oslo Road Topographic Design Survey <br /> Indian River County Project No . 0403 <br /> This Work Order No . 5 is in accordance with the existing AGREEMENT dated September 23 , 2003 <br /> between Kimley-Horn & Associates , Inc . ( SURVEYOR) and Indian River County (COUNTY) . <br /> This Work Order No . 5 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 5 is for providing a Topographic Survey of 8th Court SW lying south of Oslo <br /> Road . <br /> SECTION II — SCOPE OF SERVICES <br /> Phase 1 will consist of the preparation of a Topographic survey over that portion of 8 h Court SW lying <br /> east of and adjacent to the Church parcel . <br /> Phase 11 will consist of the preparation of a Topographic survey for the southerly remainder of 8'h Court <br /> SW . <br /> Phase 1 and Phase II will be tied to the Florida State Plane Coordinate System and includes the locations <br /> of the maintained roadbed (as determined by the COUNTY) , power poles and above ground utilities , <br /> driveways , mailboxes , trees 6 "dbh and greater adjacent to the existing roadbed and a distance from the <br /> baseline to the front of the residences . Cross section elevations along the roadbed will be obtained at <br /> approximate 100 foot stations . Existing lot corner monumentation will be located and shown in an effort <br /> to determine the lot lines along the roadbed . The COUNTY will provide the SURVEYOR the most <br /> recent recorded conveyance for each of the parcels along Phase 1 and Phase 1I . <br /> SECTION III - TIME FOR COMPLETION <br /> Phase 1 shall be completed within 45 calendar days from Notice to Proceed . <br /> Phase II shall be completed within 90 calendar days from Notice to Proceed . <br /> SECTION IV - COMPENSATION <br /> The COUNTY agrees to pay , and the SURVEYOR agrees to accept , a fee for services rendered <br /> according to the " Scope of Services " identified in Section II & III of this Work Order No . 5 , a Lump <br /> Sum of $ 16 , 000 . 00 . <br /> The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the <br /> AGREEMENT shall remain in full force and effect, and are incorporated herein . <br /> F :\Engineering\Capital Projects\0403 -8th Court and Oslo Road\0403 -1313C attachment-8th Ct. SW-Oslo- Kimley Horn IRC WO #5 Eng. . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.