Laserfiche WebLink
Brine to North Relief Canal Project Budget Summary <br /> 16" Brine Line-21 , 120 L .F . $ 11500 ,000 . 00 <br /> Control Structure W/O Lateral G Canal $ 300 , 000 . 00 <br /> Pumping Station at 8 MG Lake Headworks $ 500 ,000 .00 <br /> Pumping Station at 8 MG Lake Tailworks $ 500 ,000 .00 <br /> Pumping Station at 10 MG Basin Tailworks $ 500 ,000 .00 <br /> CONSTRUCTION SUBTOTAL $ 313000000 .00 <br /> 15% Contingency $ 495 ,000 .00 <br /> CONSTRUCTION TOTAL $ 31795 ,000 . 00 <br /> Engineering , Permitting and Inspection (14 .6% Construction Total) $ 554 , 070 .00 <br /> PROJECT GRAND TOTAL $ 493499070 .00 <br />