Laserfiche WebLink
CAPACITY CHARGE <br /> • Water - Per ERU <br /> ' Water Treatment S 320.00 <br /> Water Transmission9S 80. 00 <br /> Total S1 j300eOO <br /> Sewer - Per ERU <br /> Wastewater Treatment S29087. 00 <br /> Wastewater Transmission S 709. 00 <br /> Total 52,796. 00 <br /> Line Extension Charees <br /> Maio Extension - Water <br /> Per foot measured along front of property served. 511 . 25 <br /> Main Extension Sewer and Sewer Laterals <br /> Per foot measured along front of property served. 515. 77 <br /> (Note : Charge doubles if service available on one side only, <br /> minimum of 50 feet per ERU, maximum of 100 feet per ERU) <br /> OTHER CHARGES <br /> Deposits - Required Upon Ormnine, Transferrine or Reconnectine Service <br /> Residential and Commercial - Per ERU S50400 <br /> Hydrant Meter 5345. 00 <br /> Interest Rate paid on Deposits .00208 % per month <br /> 2. 5 % per year <br /> Charge for Returned Check S20, 00 <br /> Issuance of Duplicate Bill S 1 . 50 <br /> Sewer Tap Cost plus overhead <br /> Meter Replacement <br /> 5/8 Inch S100400 <br /> 1 Inch S125. 00 <br /> 1412 Inch S300. 00 <br /> 2 Inch or larger Cost plus overhead <br /> Meter Removal <br /> 5/8 Inch $ 30, 00 <br /> I Inch <br /> S 30. 00 <br /> 11 /2 Inch and larger S 40. 00 <br /> Water Service Connection <br /> 5/8 Inch Meter S400. 00 <br /> 1 Inch Meter 5460000 <br /> 14/2 Inch Meter $810. 00 <br /> Larger than 1412 Inch Meter Cost plus overhead <br /> 3 <br />