My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-019
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 2:00:01 PM
Creation date
9/30/2015 7:17:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/20/2004
Control Number
2004-019
Agenda Item Number
11.J.2
Entity Name
Legend Properties
Subject
Off-Site Utilities
Area
The Reserve at Grant Harbor
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3596
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "B-1 " <br /> ESTIMATED COST OF IMPROVEMENTS - PART 1 <br /> 53rd Street Wastewater Force Main Extensions for " The Reserve at Grand Harbor" Subdivision <br /> Item Description Estimated Unit of Unit Price Total Price <br /> Quantity Measure <br /> 1 Mobilization / Demobilization 1 LS $4 000. 00 $4 000 .00 <br /> 2 Maint. of Traffic 1 LS $ 11500 .00 $ 1 ,500 .00 <br /> 3 12" PVC F.M. 290 LF $30. 00 $ 82700 . 00 <br /> 4 Ductile Iron Fittings 0 .25 TON $59000 . 00 $ 1 ,250 .00 <br /> 5 12" Gate Valves 3 EA $ 1 , 150 . 00 $3 ,450. 00 <br /> 6 Connect to Existing Force Main 1 EA $ 1 ,500 , 00 $ 1 500 . 00 <br /> 7 Temporary Jumper 1 EA $350 .00 $350 . 00 <br /> 8 Right-of-Way Restoration din / sod 400 SY $2 . 00 $ 800 .00 <br /> 9 Testing 1 LS $ 1 ,000000 $ 1 000 . 00 <br /> 10 Construction Stakeout 1 LS $ 1 , 500. 00 $ 1 ,500. 00 <br /> Subtotal $242050.00 <br /> Contingency @ 10% $29405 .00 <br /> Route Survey & As-Builts $ 12000 . 00 <br /> Design @ 7% $ 103 . 50 <br /> Permitting @ I % + Fees $240. 50 <br /> Bidding & Award @ 1 % $240 . 50 <br /> Const. Services @ 2% $481 .00 <br /> Const. Administration @ 21/o $481 .00 <br /> Total Improvement Cost $30,581 . 50 <br /> Developer' s Cost $0 .00 <br /> County' s Cost $302581 . 50 <br /> Note: Any insurance and bonding required by this contract shall be considered to be included <br /> in the unit price of the installed materials. <br /> Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.