Laserfiche WebLink
T <br />Document G701TM <br />I - 2001 <br />Change Order <br />PROJECT (Name and address): <br />New County Administration Building <br />Lying Between the Main Relief Canal to <br />the North. the Lateral D Canal on the <br />Sounth and East and 20th Avenue to the <br />West <br />TO CONTRACTOR (Name and address): <br />Turner Construction Company <br />800 N. Magnolia Avenue <br />Orlando, Florida 32803 <br />CHANGE ORDER NUMBER: 035 <br />DATE: January 15. 2008 <br />ARCHITECT'S PROJECT NUMBER: 2102 <br />CONTRACT DATE: (Amendment # 2) August 23, 2005 <br />CONTRACT FOR: Guaranteed Maximum Price - <br />Constmction Manager at Risk <br />OWNER:® <br />ARCHITECT: <br />CONTRACTOR: <br />FIELD: <br />❑ <br />OTHER: <br />❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable m previously executed Construction Change Directives) <br />COR 116 Description Amount <br />PCO No. 032 <br />Item 001 Release Hold Allowance for Brick Pavers and Sidewalks $23,778 <br />002 Remove Temporary Sidewalks, add fill and sod replacement ($4,553) <br />003 Remove Existing Pedestian Ramp/Curb cut & repalce with new curb ($ 477) <br />004 Furnish and install Detectable Warning Stripsat Bldgs I & 2 <br />Total area of approximately 280 sq. ft. ($7,000) <br />005 Provide decorative stone flumes at base of open downspouts ($2,500) <br />010 Increase Owners Contingency - Paver Allowance Adjustment $9,248 <br />The above actions will not change the GMP, but will increase the Owner's Contingency by $9,248. <br />The original Guaranteed Maximum Price was $ 33,086,442.00 <br />The net change by previously authorized Change Orders $ (5,263,677.00) <br />The Guaranteed Maximum Price prior to this Change Order was $ 27,822,765.00 <br />The Guaranteed Maximum Price will be changed by this Change Order in the amount of $ 0 <br />The new Guaranteed Maximum Price including this Change Order will be $ 27,822,765.00 <br />The Contract Time will be increased by zero 10 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is August 3, 2007. <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br />Commissioners <br />ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) <br />609 17th Street, Vero Beach, Florida <br />32960 <br />S <br />11/! <br />BY (Signature) (q ydn U l.3 <br />Anthony Donadio <br />(Typed name) <br />GATE <br />/fs <br />DATE <br />800 N. Magnolia Avenue, Orlando, FL <br />32803 <br />ADDRE/�) <br />BY (Sign � <br />Louis Fiore <br />(Toped name) <br />J/0" A <br />DATE <br />1801 27th Street. Vero. Beach,Florida <br />32960... - .:... <br />AD SS <br />BY (ilmature)' 1 <br />Sandra.L..Bowden, Chairman. <br />(Typed dameti-y� <br />DATE <br />AIA Document G701 TO — 2001. Copyright ©1979, 1987. 2000 and 2001 by The American Institute of Architects. All rights reserved. WA1#1T4a,1D&A <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa Document, or any <br />portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the laly_AT�1js d�cu7ieq <br />was produced b AIA software at 13:13:44 on 01110/2008 under Order No.1000313134 1 which expires on 7/24/2008, and is not for resaleJlAIY j 11 <br />User Notes: 11 fi59.443r <br />