My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-292
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:45:03 PM
Creation date
12/19/2025 1:44:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/09/2025
Control Number
2025-292
Agenda Item Number
16.B.4.
Entity Name
Stearns Conrad and Schmidt dba SCS Field Services
Subject
Amendment No. 1 to Agreement for Landfill Gas System Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO. 1 TO AGREEMENT FOR <br />LANDFILL GAS WELLFIELD EXPANSION <br />THIS FIRST AMENDMENT TO AGREEMENT FOR LANDFILL GAS WELLFIELD <br />EXPANSION is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of <br />Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Stearns, Conrad and Schmidt, Consulting Engineers, Inc. a Virginia corporation dba SCS Field <br />Services (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the <br />mutual covenants hereinafter set forth, agree as follows: <br />RECITALS <br />WHERAS, the Indian River County Solid Waste Disposal District (SWDD) and Nopetro <br />Eco District, LLC (NED) have a separate landfill gas agreement wherein landfill gas generated at <br />the Indian River County Landfill is routed to the NED Renewable Natural Gas Plant which requires <br />both parties to work together for the expansion of the landfill gas collection system; <br />WHEREAS, on November 14, 2025, a notice to proceed was issued to SCS Field Services <br />for Phase i Landfill Gas Wellfield Expansion project to install nine (9) vertical wells in Segment 3 <br />Cell i and Cell 2 at the Indian River County Landfill under the authority of the County Administrator <br />as the total project cost was $198,930.20; <br />WHEREAS, the NED also issued a purchase order to the Contractor for $T7,319.8o to <br />cover mobilization costs for the well driller and the cost for one (1) additional vertical well; <br />WHEREAS, both parties wish to proceed with Phase 2 and Phase 3 work by the Contractor <br />to equip all 10 wells and connect them to the existing system to maximize the quantity of landfill <br />gas; <br />NOW THEREFORE, in consideration of these premises, and other good and valuable <br />consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto, <br />intending to be legally bound, covenant and agree to as follows: <br />ARTICLE 1— WORK AND PROJECT <br />CONTRACTOR shall complete all Work as specified or indicated in the original Contract Documents <br />as well as the additional work identified in this Amendment No. 1 to Agreement. The Work is <br />generally described as follows and per attached SCS Field Services proposal dated November lo, <br />2025 and includes the $5,000 cost of the construction bond: <br />Phase 2: Labor, Equipment, Materials and to install new vertical wellheads and dewatering <br />pumps at a cost of $91,5oo based on the following scope of work description: <br />• Each new vertical well will be equipped with a dual extraction flanged 8 -inch well cap, an <br />orifice plate style QED 2 -inch wellhead, flex hose and hose clamps. <br />• A QED AP -plus bottom loading pneumatic pump, triple sleeved tubing, air/filter regulator, <br />cycle counter, 1 -inch discharge hose and all necessary stainless-steel hardware to connect to <br />the air and forcemain riser pipes. The pump will be initially installed approx. 20 feet above <br />the bottom of the well. <br />Phase 3: Labor, Equipment, Materials and to install new HDPE vacuum lateral (SDR -17), <br />air (SDR -9) and forcemain (SDR -ii) piping at a cost of $325,000. <br />Ratification. Except as specifically provided in this First Amendment, all other provisions of the <br />Agreement shall remain in full force and effect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.