My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-369A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-369A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:46:52 PM
Creation date
10/1/2015 1:06:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/18/2008
Control Number
2008-369A
Agenda Item Number
8.M.
Entity Name
Ardaman & Associates Agreement
Subject
Services Agreement 2008-2009
Supplemental fields
SmeadsoftID
8103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY''r <br />PUBLIC WORKS DEPARTMENT <br />PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT <br />FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING <br />SERVICES <br />THIS AGREEMENT, entered into this 18th day of November , 2008 by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida, <br />hereinafter referred to as the "COUNTY", and ARDAMAN & ASSOCIATES, INC, <br />hereinafter referred to as the "GEOTECHNICAL PROFESSIONAL." <br />WITNESSETH <br />That the COUNTY and the GEOTECHNICAL PROFESSIONAL, in consideration <br />of their mutual covenants, herein agree with respect to the performance of professional <br />geotechnical and testing services by the GEOTECHNICAL PROFESSIONAL, and the <br />payment for those services by the COUNTY, as set forth below and in individual Work <br />Orders. This agreement shall be referred to as the "MASTER AGREEMENT" under <br />which future Work Orders will apply. <br />The GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with <br />professional geotechnical and testing services and such other related services as <br />defined in specific Work Orders, in all phases of each project. The GEOTECHNICAL <br />PROFESSIONAL shall serve as the COUNTY's professional representative for the <br />project as set forth in each Work Order, and shall give professional geotechnical advice <br />to the COUNTY during the performance of the services to be rendered. <br />SECTION I — PROJECT LIMITS <br />Project limits shall be identified in individual Work Orders prepared by the <br />COUNTY and approved by the GEOTECHNICAL PROFESSIONAL. Each Work Order <br />will be sequentially numbered and formally approved by the COUNTY prior to a Notice - <br />to -Proceed being issued. <br />Basic services required of the GEOTECHNICAL PROFESSIONAL for the project <br />will be described in other appropriate sections of this Agreement and in individual Work <br />Orders. <br />SECTION II — COUNTY OBLIGATIONS <br />The COUNTY agrees to provide the following material, data, or services as <br />required in connection with the work to be performed under this Agreement: <br />A. Provide the GEOTECHNICAL PROFESSIONAL with a copy of any <br />pertinent preliminary data or reports available to the COUNTY. <br />B. Provide the GEOTECHNICAL PROFESSIONAL with all reasonably <br />available drawings, surveys, right-of-way maps, and other documents in <br />the possession of the COUNTY that are pertinent to the project. <br />C. The COUNTY shall be responsible for obtaining only those permits <br />required to perform the work to complete the project, if such permit <br />1 <br />FAEngineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.