Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br />No. 2007-018 <br />24" FORCE MAIN REPLACEMENT ON 15TH AVE. OSLO RD. TO PS #89 <br />DATE OF ISSUANCE: Oct 2008 <br />OWNER: Indian Rive <br />CONTRACTOR: DE <br />CONTRACT: <br />622007 <br />PROJECT: 24"_Force Main Replacement on 15tH <br />COUNTY UTILITY PROJECT NO.: UCP #3096 <br />COUNTY W.LP. No, 471 <br />EFFECTIVE DATE: Oct 2008 <br />CONTRACTOR'S PROJECTNO.: N/A <br />You are directed to proceed promptly with the following work: <br />Description: <br />Replace about 700 feet of 24" force main on 15t'' Avenue from Oslo Rd. to PS #89 and 24" piping on In - <br />Line PS intake side <br />Method of determining Contract Price: <br />El Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br />County Commissioners on February 6, 2007 to Derrico Construction Corp. <br />❑ Lump Sum <br />❑ Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost = <br />Total Estimated Labor Costs = <br />ACCEPTED: <br />By, <br />Derrico Construction Corp. <br />Date: 7/11�_. /C f.? <br />$127,869.28 Estimated Contract Time: 60 days <br />$127,869.28 <br />e. 1 <br />RECOMMENDED: <br />1 <br />Date: n /� �j <br />APPROVED: <br />;�*airman,^ BCC <br />Date: /40 <br />Attachment 2 <br />C:\Documents and SettingsVohn.DERRICOCONSTRUC\Local Settings\TemporaryInternet Files\OLK6\AA - Work Authorization No 2007- <br />018 Attachment 2.doc9 <br />