Laserfiche WebLink
$ <br />Board of County Commissioners <br />Administration - Building A <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />Project: <br />69th Street Left Turn Lane at U.S Highway No. 1 <br />Topographic Design Survey <br />IRC Project No. 1360 <br />os zo/Sā€¢ <br />ei <br />WORK ORDER NO. 2 (Engineering/Surveying) <br />FOR <br />PROFESSIONAL SERVICES AGREEMENT <br />ANNUAL SURVEYING and MAPPING SERVICES <br />WITH <br />Masteller, Moler & Taylor, Inc. (formerly Masteller, Moler, Reed & Taylor, Inc.) <br />In accordance with Contract No. 1333 2014-2015 <br />This Work Order No. 2 is in accordance with the existing AGREEMENT dated October 1, 2013, <br />and renewed on October 17, 2014 between Masteller, Moler & Taylor, Inc. (formerly Masteller, <br />Moler, Reed & Taylor, Inc.), (SURVEYOR) and Indian River County (COUNTY): <br />SECTION I ā€” PROJECT LIMITS <br />This Work Order No. 2 is for the SURVEYOR to perform all related field and office surveying <br />and mapping services in connection with the preparation of a topographic design survey for <br />roadway improvements for a portion of 69th Street. The survey limits shall be from the <br />centerline of right-of-way of U.S. Highway No. 1 to 1,100 feet west of Old Dixie Highway <br />including 100 feet each way on side streets and the FEC railroad. The survey limits shall also <br />extend 1,200 feet north and south of 69th Street along Old Dixie Highway The approximate <br />length of the right of way limits is 4,300 linear feet (0.81 miles). <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br />Professional services to complete all tasks as outlined in this Work Order No. 2; specifically <br />detailed in the attached proposal Exhibit A. <br />SECTION III ā€” TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a. 100% "Paper" review submittal (final review prior to request for final deliverables) <br />shall be made within 45 calendar days of receipt of Notice to Proceed for review by <br />County Staff prior to preparing the final submittal package. <br />S:\DOCUMENTS\WORK ORDERS\IRC #1333 - Work Orders\IRC MMT WO No. 2 04-09-15.doc <br />