Laserfiche WebLink
CHANGE ORDER NO. 6 - FINAL <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />OWNER: INDIAN RIVER COUNTY <br />CONTRACTOR: CLOSE CONSTRUCTION, LLC <br />PROJECT: PC South Algal Nutrient Removal Facility <br />OWNER'S PROJECT NUMBER: 949 <br />ENGINEER: INDIAN RIVER COUNTY <br />You are directed to make the following changes in the Contract Documents: <br />Item <br />Description <br />Increase/Decrease <br />in Contract Price <br />Increase/Decrease <br />in Contract Time <br />(Calendar Days) <br />6.1 <br />Reconcile Pay Item 3.12 - Millings road and <br />millings turnout area. Add 20 square yards to <br />original contract pay item quantity = 20 SY * <br />$20.70/SY <br />$414.00 <br />0.0 <br />0.0 <br />6.2 <br />Deduction for millings road surface <br />rehabilitation by County selected contractor. <br />($3,082.00) <br />0.0 <br />6.3 <br />Reconcile Pay Item 3.49 - 6" thick concrete <br />floway. Add 27.30 square yards to original <br />contract pay item quantity due to discrepency <br />between civil/mechanical drawing dimensions <br />and structural drawing dimensions = 27.30 SY * <br />$38.00/SY <br />$1,037.40 <br />6.4 <br />Reconcile Pay Item 3.63 - Type B coated chain <br />Zink fence. Deduct 83.5 LF that was not <br />constructed from original contract quantity = <br />83.5 LF * $13.11/LF <br />($1,094.69) <br />0.0 <br />6.5 <br />Reconcile Pay Item 3.64 - 3 -Strand barb wire on <br />existing water treatment plant fence. Add 115.4 <br />LF to original contract pay item quantity = 115.4 <br />LF * $2.00/LF <br />$230.80 <br />0.0 <br />6.6 <br />Delete Pay Item 3.65 in its entirety (32' wide <br />coated chain-link fence double gates) <br />($2,360.00) <br />0.0 <br />6.7 <br />Delete Pay Item 3.66 in its entirety (24' wide <br />coated chain-link fence double gates) <br />($2,115.00) <br />0.0 <br />6.8 <br />Delete Pay Item 3.68 in its entirety (18' wide <br />coated chain-link fence cantilevered gates) <br />($3,050.00) <br />0.0 <br />0.0 <br />6.9 <br />Replacement of Duperon harvest rake cabinet <br />($5,570.00) <br />6.10 <br />Add change order driveway improvements to <br />South Relief Canal pump station site Record <br />Drawing Survey <br />$450.00 <br />0.0 <br />($15,139.49) <br />TOTALS <br />0.0 <br />