Laserfiche WebLink
I I1LO / 0 -1 <br /> I {. C . I . <br /> AIA Document G701 � - 2001 <br /> Change Order <br /> PROJECT (Name and address) : CHANGE ORDER NUMBER: 015 OWNER: <br /> Indian River County Jail Expansion DATE: February 04, 2008 ARCHITECT: <br /> 4055 41 st Avenue <br /> Vero Beach, FL 32960 CONTRACTOR: <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ <br /> Peter R. Brown Construction, Inc. CONTRACT DATE: June 07, 2005 <br /> 13830 58th Street North CONTRACT FOR: General Construction OTHER: ❑ <br /> Clearwater, FL 33760 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> Provide all labor, materials and equipment to provide and install acoustic panels in the four (4) Dormitory Buildings in <br /> every otherjoist bay per Options A & B in Proposal Request #7 dated September 25, 2007 from CRA. The quote is for two <br /> hundred fifty-eight (258) panels thirty-two (32") inches wide by ninety-six (96") inches long. Work includes installing hat <br /> channels across joist for purpose of attaching acoustic panels. Funding for this work is from the Project Budget and specifically <br /> the Contractor's Contingency. <br /> TOTAL: $75 ,323 .00 <br /> The original Guaranteed Maximum Price was $ 18,301 ,631 .00 <br /> The net change by previously authorized Change Orders $ (493 .779.35) <br /> The Guaranteed Maximum Price priorto this Change Order was $ 17,807 .851 .65 <br /> The Guaranteed Maximum Price will be unchanged by this Change Order in the amount of $ 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65 <br /> The Contract Time will be increased by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007. <br /> NOTE : This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, <br /> Clemons-Rutherford & oc ales, Inc. Peter R. Brown Construction , Inc. Indian River County BOC-C� <br /> ARCHITECT (Firmin rte) CONTRACTOR (Firm name) OWNER %Firm name) - <br /> 2027 Thomas Ale Rd.. T al ssee, F 13830 58th Street N r, Clearw er, FL : 8� 25th Street, Suite. N 118, V efo Beach, <br /> 32308 33760 PL 32960 <br /> ADDREADDRESS AGO FSS <br /> i <br /> u el BY (S _ ature) sie.wiure) <br /> William D. Rutherford Eduardo M. Vargas Sandra L. B��Yden <br /> (Typed name) (TSPed name) ( Typed nufne) <br /> DATE DATE DATE <br /> AIA Document G701m - 2001 . Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING : This AIAe <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA* Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent passible under the law. This document <br /> was produced by AIA software at 16'37:12 on 02/12/2008 under Order No. 1000337851 _1 which expires on 1 /10/2009, and is not for resale. <br /> User Notes: (2320249868) <br />