Laserfiche WebLink
sT <br /> _=AIA Document G701TM — 2001 <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 006 OWNER: <br /> New County Administration Building DATE: March 13, 2007 ARCHITECT: <br /> Amended to Include a New County <br /> Emergency Operations Center by the to CONTRACTOR: <br /> be located on 43rd Avenue, Vero Beach <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 5054 FIELD: ❑ <br /> Turner Construction Company CONTRACT DATE: (Amendment #4) June 6, 2006 OTHER: ❑ <br /> 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando, Florida 32803 Construction at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> Reference Description Amount <br /> COR 024 Revise Keying Schedule $ 904.00 <br /> COR 025 Revise City Site Permanent Power Service $ 6,288.00 <br /> COR 026 Change Rooms 004 and 026 bare steel access floor panels to laminated static dissipative <br /> HPL covered panels with integral lip and bolted stringer understructure $ 4,542.00 <br /> Total $ 11,734.00 <br /> These four Owner Purchase Orders actions will not change the GMP, but will decrease the Owners Contingency by $11 ,734.00. <br /> The original Guaranteed Maximum Price was $ 4,974,710.00 <br /> The net change by previously authorized Change Orders $ (787,054.00) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 4, 187,656.00 <br /> The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ 0 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 4, 187,656.00 <br /> The Contract Time will be unchanged by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is lune 30, 2007 <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br /> Commissioners <br /> ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) <br /> 60917 t et, Vero Beach, Florida 800 N. Magnolia Avenue 1840 25th Street, Vero Beach,Florida <br /> 3296 Orlando, Florida 32803 32960 <br /> ADDRESS ADDRESS <br /> 10� C <br /> ignature) BY (Signature) BY (Sign ire) <br /> Anthony Donadio Louis Fiore Gary C. Wheeler, Chairman <br /> (Typed nam (Typed name) (Typed name) <br /> 21 V �7 5Z 16 z 31ai lip <br /> DATE DATE DAT—� ; <br /> AIA Document G7011" — 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIAa <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any <br /> portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 11 :56:40 on 03/07/2007 under Order No.1000250302_1 which expires on 7/2512007, and is not for resale. <br /> User Notes: Indian River C my Staff Review Approvals (2679482133) <br /> General Services j/5 Co. Administr for " t - Q 7 <br /> OMB j1 C 1 Legal t L. <br />