HomeMy WebLinkAbout2008-09704-o$•08
CHANGE ORDER NO, 007
DATE OF ISSUANCE: March 27, 2008 EFFECTIVE DATE: March 27, 2008
OWNER: Indian River County
CONTRACTOR: Lucas Marine Construction, LLC
Contract: Main Relief canal Pollution control System
Project: No. 0113 COUNTY's BID No. 2007066
ENGINEER: Indian River County CONSULTING ENGINEER: N/A
Stormwater Division
You are directed to make the following changes in the Contract Documents:
Description: Install PZC-13 Steel Sheet Piling (furnished under Change Order No.
006) and other Work at the end of the box culvert as required by IRFWCD as shown
on Drawing C3A, titled "Perimeter Sheet Pile and Rip -Rap Locations per IRFWCD"
dated February 15, 2008; and as discussed on the attached letter from Bruce Smith
of Lucas Marine Construction, LLC, to Keith McCully, Indian River County, dated
March 26, 2008.
Reason: To comply with requirements from IRFWCD.
Change in Contract Price: Increase $41,002.59
Change in Contract Time: Twenty (20) calendar days.
Attachments: (List documents supporting change)
1. Letter from Lucas Marine Construction, LLC, dated March 26, 2008
2. Drawing C3A, titled "Perimeter Sheet Pile and Rip -Rap Locations per IRFWCD"
dated February 15, 2008 (reduced copy attached).
CHANGE IN CONTRACT PRICE:
Description
Amount
Original Contract Price
$373682799.60
Net Increase (Decrease) from previous
Change Orders No. 000 to 006:
$87,961.30
Contract Price prior to this Change Order:
$3,4561760.90
Net Increase (DeGrease) of this Change
Order:
$41,002.59
Contract Price with all approved Change
Orders:
$3,497,763.49
Change Order No. 007
Change Order - Page 1 of 2
FAPublic Works\KeithM\Stovnwater ProjectsWain Relief Canal\Change Orders\Change Order No 007.doc Last revised 9/27/01
ACCEPTED:
By: A"�
CONTRA 'OR (Signature)
Act it 1 14,C-4-�k4
(Nam and Title)
Date: `7 j -d$
REC
By:
ENGIHEER�Signature)
Keith McCully, P.E., Indian
River County Stormwater
Engineer
Date: 3 --27— ZOO go
C6 . Sandra L. Bowden
(S, nature)
Indian <1ver.County:96ard of
County Commissioners
Date: April 8. 2008
Change Order No. 007
Change Order - Page 2 of 2
F:Tublic WorksWelthMStormwater ProjectsWain Relief Canal%Change Ordem\Change Order No 007.doc Last revised 9/27/01
CHANGE IN CONTRACT
TIMES
Description
Time
Original Contract
Time:
(days or dates)
Substantial Completion:
270 days - 5/23/2008
Final Completion:
300 days - 6/22/2008
Net change from
previous Change Orders
No. 000 to 006:
(days)
Substantial Completion:
34
Final Completion:
34
Contract Time prior
to this Change Order:
(days or dates)
Substantial Completion:
304 days - 6/26/2008
Final Completion:
334 days - 7/25/2008
Net increase (decrease)
this Change Order:
(days or dates)
Substantial Completion:
-20- days
Final Completion:
-20- days
Contract Time with all approved Change
(days or dates)
Orders:
324 days - 7/16/2008
Substantial Completion:
354 days - 8/14/2008
Final Completion:
ACCEPTED:
By: A"�
CONTRA 'OR (Signature)
Act it 1 14,C-4-�k4
(Nam and Title)
Date: `7 j -d$
REC
By:
ENGIHEER�Signature)
Keith McCully, P.E., Indian
River County Stormwater
Engineer
Date: 3 --27— ZOO go
C6 . Sandra L. Bowden
(S, nature)
Indian <1ver.County:96ard of
County Commissioners
Date: April 8. 2008
Change Order No. 007
Change Order - Page 2 of 2
F:Tublic WorksWelthMStormwater ProjectsWain Relief Canal%Change Ordem\Change Order No 007.doc Last revised 9/27/01
03!26.2003 16:05 7722561139 LMC: PA3E 02105
L MCI LUCAS MARINE CONSTRUCTION, LLC
March 26, 2008
Indian River County Public Works
4375 43" Ave.
Vero Beach, FL 32467
Attn: Mr. Keith McCully, Clifford Suthard, Stormwater Division
RE: Main Relief Canal Pollution Control System
PCG 07-1600-006-R2
Gentlemen:
As requested, we
are submitting the following revised proposal for
your consideration. We will
provide all labor
and equipment necessary to construct the outfall
structure for
the referenced
project per the recent design that includes steel sheet pile. The
itemized cost
breakdown is
attached. Please
note that we have note included any concrete
work in ttus
proposal; any
necessary concrete wont will be billed per Item 3.01 of the Schedule
of Values.
The total change order amount requested is $41,002.59 (which excludes materials) and will
require that twenty (20) calendar days be added to our current contract time. We have also
excluded bonds and insurance expense, which will be recalculated upon completion of the
project based on the final contract amount. If you have any questions or need additional
information, please do not hesitate to contact us.
Sin`ce�I
relpy
_`
Bruce G. Smith
Project Manager
3130 SE Slater St. a Stuart, FL 34997 a (772) 266-50194 a Fax (772) 2.116-1139
03126/2OOB 16:05 7722861139 LMC PAGE 0 3/ 05
Z'Z' mizED COST DREA"owN
I.) AlobilizatiowDemobilization
Labor
Quantity
Race
Amouat
Foreman
1
DY
$330.00
$330.00
Operator
1
DY
242.00
242.00
Skilled labor
1
DY
198.00
198.00
Laborer (2 FA)
I
DY
308.00
308.00
Subtotal
1.078.00
Payroll Taxes/Workman's
Compensation Insurance C 35%
377.30
Subtotal
$1,455.30
Other
Tools & consurnables
1
DY
50,00
50.00
Fuel, grease, mise.
1
DY
160.00
160.00
Vibratory hammer freight
2
LD
$800.00
$1.600.00
Subtotal
51,970.00
SUBTOTAL ITEM I.)
63,425.30
Project Manager wiPick Up Truck
202.00
Bonds & insurance
0.00
Subtotal
$3,62730
Overhead & Profit
640.11
TOTAL ITEM L)
544267.41
IL) Furnish 8c install steel sheet pile
Laboe
Quantity
Unit
Rate
Arnount
Foreman
2
DY
$330.00
$660.00
Operator
2
DY
242.00
484.00
Skilled labor
2
DY
198.00
3%.00
Laborer (2 EA)
2
DY
308.00
616.00
Subtotal
2_.156.00
Payroll Taxes/Wcrkman's
Compensation Insurance r 35%
754.60
Subtotal
$29910.60
Equipment
Rate
Amount
Pick-up truck (i/c: insurance & iael)
2
DY
100.00
$200.00
Crane
1
LS
5,100.00
5,100.00
Vibratory hammer
I
WK
21000.00
21000.6C
Welder/gererator
2
DY
25.00
50.00
Loader
2
DY
200.00
400.00
Subtotal
$79750.00
Page _L of _ 3 Pages
03/15/2009 16;05 7722661139 LMC FAGE 04/0
Mates
Steel sheet pile PZC-13 (i/c sales tax) 1 LS $34,856.00 $34,856.00
Subtotal 5349816.00
Other
Tools & consumables 2 DY $50.00 $100.00
Fuel, grease, mise. 2 DY 160,00 320.00
Template 1 LS 1.00n.00 1,000.00
Subtotal 51.420.00
SUBTOTAL ITEM II.) 5464936.60
Project Managcr w/Pick Up Truck 404.00
Overbead & Profit
TOTAL ITEM II.) $557694.82
M.) Excavation & Additional Riiprap
Labor
OUarrta
Unit
Rate
Amount
Foreman
3
DY
$330.00
$990.00
Operator
3
DY
242.00
726.00
Skilled Taber
3
DY
198.00
594.00
Laborer
3
DY
308.00
924.00
Subtotal
3,234.00
Payroll Taxes/Workman's
Compensation
Insurance a 35%
1031.90
Subtotal
54,365.90
Eauinmettt
Rate
Amount
Pick-up truck (i/c insurance & fuel)
3
DY
100.00
$300.00
Excavator
3
DY
350.00
11050.00
Loader
3
DY
200.00
600.00
Subtotal
$1.1950.00
Materials
Riprap (approx. 176 Ti)
1
LS
$81$00.00
$8,800.00
Filter fabric
1
LS
$400.00
400.00
Grout
7
CY
120.OD
840,00
Subtotal
510,040.00
Other
Tools & consumables
?
DY
$50.00
$150.00
Fuel, gr ase, mise.
?
160.00
480.00
Subtotal
$630.00
Page 2 of __ 3 Pages
03/25/2009 16:05 7722861139 LMC PAGE 05/85
FOR
eoNeTwl.ICrrane
SUBTOTAL ITEM 111.) 5161985.90
Project Manager w/Pick Up Truck 606.00
Overhead & Profit 31104.45
TOTAL ITEM IIL) 520,696.35
SUMMAWY.4 TOTAL
I.) Mobiliwdon/Demobilixatioil $4,267.41.
II.) Furnish & install steel sheet pile 55,694,82
111.) Excavation & Additional Riprap 2006.35
TOTAL 580,658.59
Deduct direct cost for steel sheet pile and coaxing (to be included in a separate proposal) -39,656.00
GRANA TOTAL $41,002.59
PROJECT NAME: Main Relief Canal Pollution Control Project
PROJECT NO.: 07-1500
':'IMPORTANT - PLEASE READ"'
Any
terms, conditions, clarifications or exclusions
contained in the
referenced correspondence apply. This breakdown
does
not stand alone, it must be accompanied by a
signed proposal
for the work described herein.
Page 3 of 3 Pam: