HomeMy WebLinkAbout2008-332n
ACC
CHANGE IN CONTRACT TIMES
Description Time
Original Contract Time: (days or dates)
Substantial Completion: 270 days - 5/23/2008
Final Completion: 300 days - 6/22/2008
Net change from previous Change Orders
No. 000 to 008A: (days)
Substantial Completion: 67
Final Completion: 67
Contract Time prior to this Change Order: (days or dates)
Substantial Completion: 357 days — 8/18/2008
Final Completion: 387 days — 9/17/2008
Net increase this Change Order, (days or dates)
Substantial Completion: -49- days
Final Completion: -49- davs
Contract Time with all approved Change (days or dates)
Orders:
Substantial Completion: 393 days — 9/24/2008
Final Completion: 423 days —10/23/2008
By:
05NTRACTOR (Signature
410pE Cr. DIeo M-I,ti
ZZILC w v eOrfVe r77
( ame and Title)
Date: (O - g —o e -
By: /`
ENGTNEignature)
Keith McCully, P.E., Indian
River County Stormwater
Engineer
Date: /4 - e -2o O
vV€D:
OIL" rm"nii?VA
Go. "Sandrg L. Bbwden
(Sig ature
Indian Rives County Board of
County Coi mmissioner.s
Date: October 14, 2008
Change Order - Page 4 of 4 Change Order No. 009
F:`Public WorksXeithMStormwater Projects' Main Relief Canal\Change Orders`,Change Order No. 009'Change Order No 009 -
FINAL.docx Last revised 9/27/01
CHANGE IN CONTRACT PRICE:
Description
Amount
ontract Price
$3,3689799.60
se from previous Change Orders
008A:
$240,055.55
Contract Price prior to this Change Order:
$3,6089855.15
Net Increase of this Change Order:
$1209780.34
Contract Price with all approved Change
$397299635.49
Orders:
CHANGE IN CONTRACT TIMES
Description Time
Original Contract Time: (days or dates)
Substantial Completion: 270 days - 5/23/2008
Final Completion: 300 days - 6/22/2008
Net change from previous Change Orders
No. 000 to 008A: (days)
Substantial Completion: 67
Final Completion: 67
Contract Time prior to this Change Order: (days or dates)
Substantial Completion: 357 days — 8/18/2008
Final Completion: 387 days — 9/17/2008
Net increase this Change Order, (days or dates)
Substantial Completion: -49- days
Final Completion: -49- davs
Contract Time with all approved Change (days or dates)
Orders:
Substantial Completion: 393 days — 9/24/2008
Final Completion: 423 days —10/23/2008
By:
05NTRACTOR (Signature
410pE Cr. DIeo M-I,ti
ZZILC w v eOrfVe r77
( ame and Title)
Date: (O - g —o e -
By: /`
ENGTNEignature)
Keith McCully, P.E., Indian
River County Stormwater
Engineer
Date: /4 - e -2o O
vV€D:
OIL" rm"nii?VA
Go. "Sandrg L. Bbwden
(Sig ature
Indian Rives County Board of
County Coi mmissioner.s
Date: October 14, 2008
Change Order - Page 4 of 4 Change Order No. 009
F:`Public WorksXeithMStormwater Projects' Main Relief Canal\Change Orders`,Change Order No. 009'Change Order No 009 -
FINAL.docx Last revised 9/27/01
=TEWA No. *.
Lucas Marine Construction, LLC
July 16, 2008
Indian River County
Public Works Department /Stormwater Division
4375 43rd ave. unit 102
Vero Beach, F1.32967
r
Attn: Mr. Keith McCully P.E.
RE: Indian River County Main Relief Canal Pollution Control Project
PCO #07-1600-011-R2
Gentlemen:
As requestbd, we are submitting the following for your consideration. We will provide and
install and additional ladder, handrail and base plates per the County's request. The total lump
sum cost to complete this work is $14,923.99 and the itemized cost breakdown is attached for
your review.
This change will also require that three (3) calendar days be added to our current contract time.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely,
Bruce G. Smith
Project Manager
UDST V:O z a,�, W, Ju x& LkbbGk
AND i4ANDRAI . ONLY
6, 41 to G7 Z
3130 SE Slater Street, Stuart, FL 34997 • (772) 286-5094 • (772) 286.1139 (Fax)
1100 Shatter Ave. Ste. 101, Jacksonville Beach, FL 32250 a (904) 2464017 • (904) 246-6018 (Fax)
www.LMCLLC.net
CONSTRUCTION
Mounted Base Plates
Labor
Foreman
Skilled labor (2)
Equipment
Pick-up truck (i/c insurance & fuel)
Materials
Base plates (9 EA)
Misc. hardware
Other
Tools & consumables
II.) Additional Ladder & Handrail
Labor
Foreman
Skilled labor (2)
EE uipment
Pick-up truck (i/c insurance & fuel)
ITEMIZED COST BREAKDOWN
uanti Unit Rate
1 DY $330.00
3 DY 396.00
Subtotal
Payroll Taxes/Workman's Compensation Insurance @ 35%
Subtotal
3
1
Amount
$330.
1.18&
518.00
531.30
$2,049.30
Rate Amount
50.00 $150,00
Subtotal $150.00
$4,346.04
$540.00
Subtotal
$4,346.04
540.00
DY \ $50.00 $150.00
Subtotal $150.00
SUBTOTA]LNTEM L) $7,235.34
Project Manager w/Pick Up T k N/C
Liability Insurance N/C
Subtotal $7,235.34
Overhead & Profit 76.82
TOTAL ITEM I.) $89512x%
Quanti1y Unit Rate
1 DY $330.00
2 DY 396.00
Subtotal
Payroll Taxes/Workman's Compensation Insurance @ 35%
Subtotal
Rate
2 DY 50.00
Subtotal
Amount
$330.00
792.00
I ,122.00
392.70
$1,514.70
Amount
$100.00
$100.00
II.) Additional Ladder & Handrail (cont'd.)
Materials
Ladder & handrail 1 LS
Misc. hardware 1 LS
Other
'Tools & consumables 2 DY
SUMMARY & TOTAL
II.) Additional Ladder & Handrail
NOTE: All material prices include sales tax.
$3,315.35
$420.00
Subtotal
$50.00
Subtotal
SUBTOTAL ITEM He)
Project Manager w/Pick Up Truck
$3,315.35
420.00
$3,735.35
$100.00
$100.00
$5,450.05
N/C
Liability Insurance N/C
Subtotal $5,450.05
Overhead & Profit
961.77
TOTAL ITEM IL) 56941182
GRAND TOTAL
PROJECT NAME: Indian River County Main Relief Canal Pollution Control System
PROJECT NO.: 07-1600
REFERENCE NO.: PCO 07-1600-011-R2
'IMPORTANT - PLEASE READ***
6,411.82
Any terms, conditions, clarifications or exclusions contained in the referenced correspondence apply. This breakdown
does not stand alone; it must be accompanied by a signed proposal for the work described herein.
October 6, 2008
MTE.M Nb. 2
Lucas Marine Construction, LLC
Indian River County
Public Works Department /Stormwater Division
437543 d Ave. #102
Vero Beach, FL 32967
Attn: Mr. Keith McCully P.E.
RE: Indian River County Main Relief Canal Pollution Control Project
Proposal Request
Gentlemen:
Attached here -in is a proposal request to furnish and install two (2) fence petitions for the above
referenced project.
The total cost from Lawrence Fence Corp = $800.00 (see attached invoice)
General contractor mark-up =10%
Grand total this change order = $880.00
In closing if I can be of any further assistance to you, please do not hesitate to contact me.
Bruce G. Smith
Project Manager
3130 SE Slater Street, Stuart, FL 34997 • (772) 286-5094 • (772) 286-1139 (Fax)
1100 Shetter Ave. Ste, 101, Jacksonville Beach, FL 32250 • (904) 246-6017 • (904) 246-6018 (Fax)
www.LMCLMnet
Date:
LA WRENCE FENCE CORP.
211 COMMERCE WAY #4-8 JUPITER, FL, 33458
SAM KRUSKI COMMERCIAL SALES
561-747-4228 FAX 561-7474416
Project:
Attn:
WORK CHANGE ORDER
September 3, 2008
Indian River County
Bruce Smith
Additional:
Install 24' sea fans
Additional materials:
Posts, mesh, frames hardware
Shop time welding 6 hiss @ $45.00 hr.
Field labor 2 men @ 2 hours @ $40.00 per hour
Subtotal:
10% Overhead/Profit:
Total Change Order:
Bill to: Lucas Marine Construction
Thank You.
Approved by:
Print Name:
$ 297.00
$ 270.00
$ 160.00
$ 727.00
$ 73.00
October 3, 2008
Y TOMS
No. 3 4
Lucas Marine Construction, LLC
Indian River County
Public Works Department Stormwater Division
4375 43`d ave.
Vero Beach, Fl. 32967
Attn: Mr. Keith McCully P.E.
Reference: Indian River County Main Relief Canal Pollution Control Project
Proposal Request
Gentleman:
At your request, attached here -in is a proposal to furnish & install (2) fire extinguisher
cabinets with 20 # extinguishers and (3) Fiberglass life ring cabinets as supplied by
Cheyenne Mfg.Inc.
1. Furnish & Install (2) fire extinguishers By Cheyenne MFg.= $555.40
Purchase (2) fire extinguishers =$339.10
Labor to install = $150.00
General Contractor mark-up= 10%
Grand total this change order --$1148.95
2. Furnish & Install (3) Life ring cabinets by Cheyenne Mfg.= $1433.70
Labor to install = $150.00
General contractor mark-up =10%
Grand total this change order -41742.07
=TE►& X0.4
=TF,K No • 3
Further, please add (1) calendar days to our contract for delivery purposes.
In closing, if I can be of any further assistance to you, please do not hesitate to call me.
=� otitrs truly.
Bruce G. Smith
Project Manager
attachments
3130 SE Slater Street, Stuart, FL 34997 • (772) 2864094 • (772) 286.1139 (Fax)
1100 Sheffer Ave. Ste. 101, Jacksonville Beach, FL 32250 • (904) 246-6017 • (904) 246-6018 (Fax)
www.LMCLMnet
Cheyenne Mfg Inc
wwwwcheyennemfg.com
P.O. Box 25
Brush Prairie, WA, 98606
800-424-7575 / 360-574-7771
Fax 360-574-0490
Date: 9/10/2008
Quote #: 9281
SALESPERSON:
TUU1H1LWIV
Jesse
INDIAN RIVER COUNTY UTIL
8405 8TH STREET
VERO BEACH, FL 32966
Attn : KEITH MCCULLY
Phone: (772) 226-3478
Fax (772) 770-5478
Product Description:
"TOUGH GUY" Fiberglass Life Ring Cabinet -
W/ 30" Ring with 90' of Rope with Float
DESCRIPTION UNIT I AMOUNT
PRICE
3 "TOUGH GUY" Fiberglass Life ring cabinet with 30" $435.00 $1,
USCG Approved Ring with 90' of 5/16" Rope with Float
Model - LRH -C
• Entry Non -Locking T -Handle
• Mounting Hardware for Rail
• Standard Color — Yellow
• Upgrades (included in price) UV Inhibiting Gel -
Coat Finish and Stainless Steel Hardware
Estimated Shipping & Handling - UPS $128.70 $ 128.70
Total: $11433.70
QUOTE VALID FOR 30 DAYS — 15 DAY TERMS ON ALL ORDERS
MEMO: ALL PRICES ARE F.O.B. VANCOUVER, WA.
Cheyenne Mfg Inc
wwwacheyennemfg.com
P.O. Box 25
Brush Prairie, WA, 98606
800-424-7575 / 360-574-7771
Fax 360-574-0490
QUOTATION
Date: 9,111/2008
Quote #: 9343-1
SALESPERSON: Jesse
INDIAN RIVER COUNTY UTIL
8405 8TH STREET
VERO BEACH, FL 32966
Attn : KEITH MCCULLY
Phone: (772) 772-3478
Fax: (772) 770-5478
Product Description:
"TOUGH GUY" Fiberglass Fire Extinguisher Cabinet
Size - Large
DESPR E
CRIPTION
Extinguisher2 "TOUGH GUY" Fiberglass Fire
Model - FEH-L - For 20,
• Choice of Entry - Lockable "Break Glass" or
Non -Locking T -Handle
• Choice of Mounting Hardware for Wall, Deck or
Rail
• Standard Color - RED (other colors available at
no additional charge)
• Upgrade (included in price) UV Inhibiting Gel -Coat
Finish and Stainless Steel Hardware
1 Estimated Shipping & Handling= UPS $57.40 $ 57.40
Total: $ 555.40
QUOTE VALID FOR 30 DAYS - 15 DAY TERMS ON ALL ORDERS
MEMO: ALL PRICES ARE F.O.B. VANCOUVER, WA.
Page 1 of 1
Bruce
From: Stephanie (Stephanie@fireequipmentservices.com]
Sent: Friday, October 03, 2008 3:54 PM
To: bruce@Imcllc,net
Bruce,
The price for the 201b abc fire ext. is 159.20 each this includes installation and 1year certification.
Thank you
Stacy Osuch
10,'? 12008
October 3, 2008
Lucas Marine Construction, LLC
Indian River County
Public Works Department/Stormwater Division
4375 43`d ave.
Vero Beach, F1. 32967
Attn: Mr. Keith McCully P.E.
Reference: Indian River County Main Relief Canal Pollution Control Project
Proposal Request
Gentleman:
Attached here -in is a proposal request to furnish & deliver (3) 15 yard dumpster
containers for the above referenced project.
The total cost from waste industrial = $9575.05(see attached invoice)
General contractor mark-up= 10%
Grand Total this change order =$ 10,532.50
Further, please add 2 calendar days to our contract for fabrication and delivery purposes.
In closing if I can be of any further assistance to you, please do not hesitate to call me.
ours trul
Bruce G.Smith
Project Manager
attachments
3130 SE Slater Street, Stuart, FL 34997 • (772) 286.5094 • (772) 286-1139 (Fax)
1100 Shatter Ave. Ste. 101, Jacksonville Beach, FL 32250 • (904) 246-6017 • (904) 246-6018 (Fax)
www.LMCLLC.net
`A WASTEQUIP
wa..,rry known for pnssiul srMn
INDUSTRIAL
RO. BOX 2678
EATON PARK, FL 33840.2678
(263) 6654507
(863) 667.0432 (FAX)
3i , -I- TI,,
Lucas Marine Constructions, LLC
3130 SE Slater St
Stuart, FL 34997
us
***INVOICE***
INVOICE NO. N`>OICE DATE p V)t
-Zh3/ I9/os -_..
Net 30
Lucas Marine Constructions, LLC
c/o Indian River County
1701 Aviation Blvd
Vero Beach, FL 32960
US
ORCEF, NO ORDER CATS I CU5''nMr_R NUMBER LOC. SAI_ESFER3 N
---
50 5 FOB: SHIPPING
I I
CUSTOMER P.O. NUMBER — -- ------ -
__ JGB NUMBER
KSHIP VIA
�1� .__—._..._— ---- — — --- — -- - qul prucK --
YwckS
(QUANTITY ORDERED
3.00
Serial No. 05
I
I
ITEM NUMBER; DESCRIPTION
EA IRS-15OT-F —
15 YD STD BATHTUB ROC
0108655 05 0108657 05
16'x44"
0108658
UNIT PRICE
,yob Mame
Job10- co Coat Code ? ' r►2 t q
Sud ('.do Date Recd
AN',;:.. ' f
For Acc-curitng Uafede
PPD i i�OL �
DISC EXTF.NCEC
jr�------ --- --
8,715.00
COMMENTS: BO1 # 25494 SALE AMOUNT: 8,715.00
MISC/HANDLING: .00
SHIPPING/FREIGHT: 250.00
SALES TAX: 610.05
TOTAL: 91575.05
AMOUNT RECEIVED: .00
BALANCE DUE: 9,575.05
AL1.IV�"�)1(.'ES f1Li: 01)PkYAB1 F. 1T: P,0, BOX 712376.CCNI'ItiVATI,OH 15_' 1-2:176
r... ,. rI.i 4 r,
October 1. 2008
=TENS 6, 71 S
Lucas Marine Construction, LLC
Mr. Keith McCully P.E.
Indian River County
Public Works Department /Stormwater Division
437543 d ave.
Vero Beach, 171.32967
Reference: Indian River County Main Relief Canal Pollution Control Project
Change Order Request
Gentleman:
Attached here -in is a change order proposal request for the following items.
1. Furnish & Install steel sheet pile cofferdam as requested by Indian River County.
T„t„ C�A This item is being billed out @ the contract unit price of $38.00/Sq.ft = 92' wall
feet x 13.75 long= 1265 sq.ft @ $38.00/sq.ft=$48,070.00 Total Duration =20 days
2. Excavate yasu sedimentation cell = $4425.00 (See attached break down sheet)
Total Duration 4 days
2
i'TE.W#*- --- 3. Excavate sedimentation pond ,install catch basin, and piping.-- $15400.00 (See
Nei $ attached breakdown sheet) Total duration = 7 days
=TEM 4. Furnish & Install Rock Rip Rap as requested by Indian River County =$12,775.00
N0.'7 See attached breakdown sheet).Total Duration 4 days
ITEM -... 5. Dredge canal including around new Dupereron screens. $ 20,500.006Nelvde-S eY-L5 %)4
N0661 (See attached breakdown sheet). Total duration= IOdays sea 1AkQWVzL+' a A
ae < •)
In closing, please add a total of 44 days to this change order request and if 1 can
be of any further assistance, please don not hesitate to call me.
< ' urs tr ly,
e--
Bruce'G. Smith
Project Manager
attachments
3130 SE Slater Street, Stuart, FL 34997 • (772) 286-5094 • (772) 286-1139 (Fax)
1100 Shetter Ave. Ste, 101, Jacksonville Beach, FL 32250 a (904) 246-6017 • (904) 246-6018 (Fax)
www.LMCLLC.net
MARINE CONSTRUCTION, LLC
Contract Number
W.O. Number
of Work
07=1600
Excavate
Description
Cell
CHANGE ORDER PROPOSAL
IRC Pollution Control Structure
Date:
10/1
or
Regular Hours
Overtime
Rate Rate
Amount
kForeman
erator
Labor
2 Das 22.00
2 Das 22.00
2 Das 22.00
Hours
(Overtime)
$30.00
$22.00
$18.00
$660.00
$484.00led
$396.00
$0.00
$0.00
$0.00
$0.00
Subtotal
$1,540.00
Workmens
Comp. / Insurance 35%
$539.00
Subtotal
$2,079.00
Equipment
merican 7250 Crane
Front End Loader
Pick U Truck
11
Unit Das Rate
Da 2.00 $500.00
Da 2.00 $200.00
Da 2.00 $100.00
Amount
$1,000,001
$400.00
$200.00
$0.00
LUCAS MARINE CONSTRUCTION, LLC CHANGE ORDER PROPOSAL
LMC Contract Number
E,W.O. Number
Description of Work
07-1600 Description: IRC Pollution Control Structure
Excavation =Includes Sod, Catch Basin & PI
10/1/2008
Labor
Regular Hours
Overtime
Hours
Rate
Rate
(Overtime)
Amount
Foreman 7 Das
77.00
$30.00
$2,310.00
Operator 7 Das
77.00
$22.00
$1,694.00
Skilled Labor 7 Das
77.00
$18.00
$1,386.00
$0.00
$0.00
$0.00
$0.00
Subtotal
Workmens Comp. / Insurance @ 35%
Subtotal
$5,390.00
$1,886.50
$7,276.50
MARINE CONSTRUCTION LLC CHANGE ORDER PROPOSAL
LMC Contract Number 074600 Description: IRC Pollution Control Structure
E.W.O. Number Date:_
Description of Work Dredge Canal, Existing Sedimentation Cell and Screen Area
10/1/2008
1
Equipment
Unit
Das
Unit Price Amount
Rate
Amount
Labor
Regular Hours
Overtime
Hours
Rate
Rate
(Overtime)
Amount
Foreman 10 Das
110.00
10.00
$30.00
$200.00
$3$00.00
Operator 10 Das
110.00
10.00
$22.00
$100.00
$2,420.00
Skilled Labor 10 Das
110.00
$18.00
$1,980.00
$0.00
Subtotal
11
$0.00
$0.00
$0.00
Subtotal
Workmens Comp. / Insurance 35%
Subtotal
$7,700.00
$2,695.00
$10,395.00
1
Equipment
Unit
Das
Unit Price Amount
Rate
Amount
0 Crane
Da
10.00
$50.00 $500.00
$500.00
$5,000.00
der
Da
10.00
$0.00
$200.00
$2,000.00
$0.00
Day
10.00
$100.00
$1,000.00
$0.00
Subtotal
11
$8.000.00
Subcontractor
Units Quantitv
Unit Price Amount
Fuel
Das 10,00
$160.00 $1,600.00
Small tools & Supplies
Das 10.00
$50.00 $500.00
$0.00
$0.00
$0.00
ITI
Materials
Units Quantitv
Unit Price Amount
Fuel
Das 10,00
$160.00 $1,600.00
Small tools & Supplies
Das 10.00
$50.00 $500.00
$0.00
$0.00
$0.00
Subtotal
1 $2.100.00
Subtotal Markup % Markup Subtotal
La
Equipment
$10,395.00 15.00% $1,834.41 $12,229.41
ui ment $8, 000.00 15.00% $1,411.76 $9,411.76
Subcontractor $0.00 15.00% $0.00 $0.00
Materials $2,100.00 15.00% $370.59 $2.470.59
redit 1 -$3,611.
Owner Representative
Contractor
Representative
Total Change Order Amount
F
3'
M (,J,
p�'(,BEl2
r� (AJ
E7L * 17.5
30l
ATZ TA N?Acwt' 2 , p470- l
"I CYE (AS Tts&J
a`
MC>Dt(=(ED FbOr TYPE
UL k** t,uLEr
$AS cN BC) rrC>M
SIDS SZ aOPES AeJA
AA" W O E S?R! P M=ArG
814f4 [A Sob
$A5 l/*tmj
t%,) m4V%A
l3_ 5
311
A
V
gizagwLsom
/t
0
7 +�
U
Z
o
w
U �
> °O a
wJ
(nLLO
W
Ix
U H
O�o.ti
' Z M
Z
a ti
J V O r
Z Q Z x
C1�0"-
H
O z _Q
4 � n
aM
Ufa)
r
z CLI)
TOM
q LO
c
r� a
x
M
N p
In N V C
O
M M Ln m
N U
O z O ti Z O
U o >
D a a U ! Q
co
0
fA
(D
O
V
C3
Lf)
CD
O
O
M
Of
N
r
i
Q1
oD
M
`-
Lo
it
ti
N
o
m
O
U
N
X
LL
❑
U
Z
o
w
U �
> °O a
wJ
(nLLO
W
Ix
U H
O�o.ti
' Z M
Z
a ti
J V O r
Z Q Z x
C1�0"-
H
O z _Q
4 � n
aM
Ufa)
r
z CLI)
TOM
q LO
c
r� a
x
M
N p
In N V C
O
M M Ln m
N U
O z O ti Z O
U o >
D a a U ! Q
C
O o
VCD
rn
L M
�OL)
U)L
L u
i ti N
N m
0 O
� r
is
co
C
fA
fA
O
V
0
:L
LO
N
O
coAt
N
C
A
�
M
`-
Q
O
ti
N
M
ti
O
U
N
X
64
o
LL
r
O
d
U
C
O o
VCD
rn
L M
�OL)
U)L
L u
i ti N
N m
0 O
� r
is
co
C
fA
fA
N
V
0
:L
LO
N
O
O
:ir
C
A
�
M
`-
Q
O
0 0 0 0 0 0 0
CD Ln La Lo a 0 in
cM^o oNN c a
N EA �/► m
60
� >4 q" s
IT\
U.
LL
J
3
fV
mo
M
� X
� r
pio
a
ciE
7j x
X10
o 3
U a
N
n -i M
COI
N
3
C
YC
p E O
�aQ
O `
E c o
Qaa
'coca
C�J�J.
N
co
fA
fA
N
0
0
:L
LO
N
1
O
000
co 0
M
`-
M,
O
N
N
M
ti
O
O
r
64
N}
N
r
0 0 0 0 0 0 0
CD Ln La Lo a 0 in
cM^o oNN c a
N EA �/► m
60
� >4 q" s
IT\
U.
LL
J
3
fV
mo
M
� X
� r
pio
a
ciE
7j x
X10
o 3
U a
N
n -i M
COI
N
3
C
YC
p E O
�aQ
O `
E c o
Qaa
'coca
C�J�J.
N
co
J
+y.
U
do
o
:L
LO
N
1
O
o
co 0
M
`-
M,
ti
�ti
m
O
O
W
v
J
Z
=TEM No, I a
J
+y.
U
:L
} >
- =
O
W
v
J
Z
=TEM No, I a