Loading...
HomeMy WebLinkAbout2008-055AMENDMENT NUMBER 1 TO WORK ORDER NUMBER 4 This mendment Number 1 to Work Order Number 4 is entered into as of this 12th day of t 200 pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of April 6, 2004 and amended effective April 7, 2007 (as so amended, the "Agreement"), by and berveen Indian River County, a political subdivision of the State of Florida ("County') and MASTELLER & MOILER, INC. ("CONSULTANT"). 1. The County has selected the Consultant to perform the professional services set forth in existing Work Order Number 4, Effective Date July 11. 2006. 2. The County and the Consultant desire to amend this Work Order as set forth on Exhibit 1 attached to this Amendment and made a part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 2 and within the timeframe more particularly set forth in Exhibit 3, all in accordance with the terms and provisions set forth in the Agreement. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Amendment to Work Order as of the date first written ahnvP CON TANT: MA MOLER, INC. By: Stephen E. Moler, PE Title: Vice President Date: January 24, 2008 BOARD OF OF R UNW' SIONI �OIVER COtiIgTY _ T BCC Approved Date` Attest: J.K. _Barton, Clerk of Court By Deputy Clerk , Cou as to form and legal sufficiency: E. Fell 3Assistant County Attorney Our File #0627LA January 24, 2008 NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES AMENDMENT #1 TO "EXHIBIT 1" The Indian River County Utilities Department has decided to amend Work Authorization #4 which was approved by the Board of County Commissioners on July 11, 2006. The original project involved Engineering Services in connection with conversion of an existing 8" force main to an 8" reuse pipeline. The recently completed Reuse Master Plan does not include the 8" pipeline and shows that a 16" pipeline is needed to meet hydraulic conditions. Therefore, the Amendment provides for Engineering Services to remove the 8" force main and replace it with a 16" force main. The 8" force main to be removed and proposed replacement 16" reuse pipeline extends along Lateral G Canal from 57"' Street to Hobart Road, east of Hobart Road 500± LF and north across Hobart Road to the future Reuse Storage Tank site. The additional services covered by this Amendment #1 to the project will generally consist of the following piping modifications and additions to the original project: • Removal of approximately 16,000 LF of existing force main and replacing it with approximately 16,000 LF of 16" reuse main with all necessary fittings, valves and accessories. • Design a directional bore from the south side to the north side of Hobart Road to extend the proposed 16" reuse pipeline to the future Reuse Storage Tank site. • Disconnect and cap the existing 8" force main extending east along the south side of Hobart Road and also extending to the south from 57"' Street. Modify the existing piping at two (2) separate locations providing reuse water to the Sandridge Golf Course with appropriate valves and fittings in order that the existing reuse main and the proposed 16" reuse main can feed the Sandridge Golf Course with both pipelines or with each pipeline independently. • Reconstruct the existing 12" pipeline from the Bend Pine rapid infiltration basin area north under the existing ditch in order to increase the cover over the pipeline as it passes under the ditch. The estimated construction cost of the project as described in this Addendum #1 is $2,0005000.00 A brief description of the scope of services and deliverables for Work Authorization #4, Addendum #1 is provided below: (Y:1mm\Proj"\200610627\ADMMContmetslAMENDMENT # 1\0627_Exhibit 1_AmenM l_012408.dm) AMENDMENT #1 TO EXHIBIT #1 01/24/2008 Page 2 • Scope of Services Task A — Contract Plans/Specifications Masteller & Moler, Inc. will provide for the necessary surveying information and prepare construction plans, specifications and contract documents to be incorporated in the original project plans, specifications and contract documents covering the following project Modifications and Additions: • Removal of approximately 16,000 LF of existing force main and replacing it with approximately 16,000 LF of 16" reuse main with all necessary fittings, valves and accessories. • Design a directional bore from the south side to the north side of Hobart Road to extend the proposed 16" reuse pipeline to the future Reuse Storage Tank site. • Disconnect and cap the existing 8" force main extending east along the south side of Hobart Road and also extending to the south from 57 h Street. • Modify the existing piping at two (2) separate locations providing reuse water to the Sandridge Golf Course with appropriate valves and fittings in order that the existing reuse main and the proposed 16" reuse main can feed the Sandridge Golf Course with both pipelines or with each pipeline independently. • Reconstruct the existing 12" pipeline from the Bend Pine rapid infiltration basin area north under the existing ditch in order to increase the cover over the pipeline as it passes under the ditch. It is assumed that because the proposed reuse system is consistent with the County's Master Plan, FDEP permitting will not be required. Task B — Construction Services Masteller & Moler, Inc. will provide construction services including periodic observation of the pipeline modifications and additions covered in this Addendum #1 on an as needed basis to observe that construction is in reasonable compliance with the contract plans. We will attend meetings, review shop drawings and monthly pay estimates from the contractor. Our File #0627 January 24, 2008 NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES AMENDMENT#1 TO "EXHIBIT 2" Method and Amount of Compensation Masteller & Molar, Inc. proposes to provide the above Scope of Services based on the following lump sum fees: Task A — Surveying, Construction Plans and Permitting Original Amendment #1 Total Fee Fee Increase Fee Surveying services and base plans; Engineering design, preparation of Construction Plans; preparation of Specifications and Bid Documents $ 15,320.00 $687230.00 $83,550.00 utilizing Standard IRC Bid Documents. Forms, Documents and Drawings will be in electronic Format MS Work Task B — Construction Services Assistance during Bidding, Bid Evaluation, Contract Award and Construction Administration and $11,310.00 $ 9.305.00 $20,615.00 Periodic Administration and Periodic Construction Field Observation TOTALS $26,630.00 $775535.00 $1049165.00 Y:\mm\Projects\200610627\ADMIN\Contracts\AMENDMENT#1\0627 Ezhibil2 Amen#1 012408. doc B § j � E k §§k $$k dam§ §$S ■§§ k§§ �k� DLL ooLU a_ �uj)( §2§Z 2■2S q \ � LO /ciITLOci00 ( b f °IQ to w yj LU k « CO) CL \ \ ) n B § j � E k §§k $$k dam§ §$S ■§§ k§§ �k� DLL ooLU a_ �uj)( §2§Z 2■2S \ , 9 � \ LO /ciITLOci00 0 to 00 to \ \ ) n 3 co § E }"! � � ~ (D] _«# \ § E a. / ! ] » q e L6 0 aE ^ 46 _ / 0 o V _ § \CD » ® ® ■ q a = 2 ) 0 \ \} 6} �2 t f , A& _ 7 Z/ ] £CL \ , 9 � LO /ciITLOci00 rl. to 00 \ , 9 � / /ciITLOci00 \ , 9 � z O F J 7 m W W LL y a y z z O O r r Q � z m a O aoz ZIxO a3� zam N aO W LU F O :)z U Lu U K U D iop0 Q Q W x 01a rzz 0 Q LL m F m LL OD 0 0 U ZLu LLI 0 0 >=.c>F rx W Q U U agNZ ?LU W0 z G O $ z K W W O Q z O F J 7 m W W LL y a y z z O O r r Q � z m a O aoz ZIxO a3� zam N aO W LU F O :)z U Lu U K U D iop0 Q Q W x 01a rzz 0 Q LL m F m LL OD 0 0 U ZLu LLI 0 0 >=.c>F rx W Q U U agNZ ?LU W0 O M O 0 N va O O O W co is N 0 0 O O M C6 ui 0 rn 0 N CNv L6 M N v L w F- U C y O O E C 3 O N N U gyp` o a L) oL U C co O O O U) O O U) N N h O M U �i ri ori m `- O f" M fH 64 0 O 0 LO ui CO 7cm co O Q .` T5 C tH [F} d9 E Qy O O N x 0 0 0 0 0 O O N O n y Q r c UUi 6% hH EA d o �+ d o m co (D x 0 0 0)0 0 ui LO0 0 LO r N O n V C W E M M@ Q CO N to 60J to y y N 3N O O N Q. x C O C �p O CW O .0 y •C ` w p co U c �ca Q Ur c U m N C '6 f0 +` O N ¢m¢ 0 a0 O M O 0 N va O O O W co is N 0 0 O O M C6 ui 0 rn 0 N CNv L6 M N v L w F- U NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES AMENDMENT#1 TO "EXHIBIT #3" • Time of Performance Our File #0627 January 24, 2008 The estimated time frame for completion of services from the approval of this Amendment #1 to Work Authorization #4 is as follows: MILESTONE COMPLETION DATE Surveying Services and Base Plans; Engineering Design & Preparation of Construction Plans April 30, 2008 Project Construction Services Completed October 31, 2008 Dates are based on assumption that County Commission will approve during February, 2008. Y:4nmlProjeds\2006\0627V1DMIN1ContradsWMENDMENT#1W627_Exhibk 3_Amen#1_012408.doe