HomeMy WebLinkAbout2008-241AMENDMENT NO, 1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT FOR 17TH LANE S.W. (FROM 27TH AVENUE TO APPROXIMATELY 900 LF EAST OF 27TH AVENUE) - IRC PROJECT NO. 0803 This is an amendment to the existing AGREEMENT dated September 18, 2007, between Masteller & Moler, Inc. (ENGINEER) and INDIAN RIVER COUNTY (COUNTY). The proposed scope of work includes modifications of design to connect to 27th Avenue. All provisions of the original Professional Engineering Services Agreement shall remain in full force and effect unless otherwise specifically modified. This amendment addresses changes in "TIME OF COMPLETION" of this AGREEMENT. SCOPE OF SERVICES See attached Addendum #1 from Masteller & Moler, Inc. dated August 6, 2008, which specifies changes in "SCOPE OF SERVICES" and "COMPENSATION." COMPENSATION This section of the AGREEMENT entitles SECTION V — COMPENSATION shall be revised in response to the Scope of Modifications set out herein. The changes associated with this AMENDMENT NO. 1 are as follows: Fees for Engineering Services — Lump Sum Amount $2,720.00 TOTAL AMENDMENT NO. 1 $2J20,00 The changes associated with the AGREEMENT shall be increased from $11,080.00 to $135800.00. The AGREEMENT is hereby amended as specifically set forth herein. All sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This AMENDMENT NO. 1 to the AGREEMENT, regardless of where executed, shall be governed by and construed by the Laws of the State of Florida. TIME OF COMPLETION Masteller & Moler, Inc. shall complete the design services within 30 calendar days of the Notice to Proceed. F:\Engineering\Capital Projects\9611-CR 512 Widening\9611 CR 512 PHASE IV\AGENDAS\BCC Agenda -Change Order # 108-05-08 A.doc In WITNESS whereof the parties have executed the AMENDMENT NO, 1 this 12th day of August, 2008, OWNER BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY ILORIDA 10 plyrt Sand a L. Bowd$n (Printed name and title) Approved by BCC "` 't .12, 2008 ATTEST: 1, 701 &Jeffrey K, t oni- erk of Circuit P1 A 10 Approved as to Form and Legal Sufficiency: I Masteller & Moler, Inc. (Si natur (Printed name and title) Witnessed by: rj�)Wc,J name) ju Gil Hoag A. Baird, COUNTY Administrator F:\Engineering\Capital Projects\9611-CR 512 Widening\9611 CR 512 PHASE IV\AGENDAS\BCC Agenda -Change Order 4108-05-08 A.doc July 31, 2007 Revised: August 30, 2007 Addendum 1 — August 6, 2008 Mr. Christopher J. Kafer, Jr., P.E. Indian River County Engineering Department 1801 27th Street Vero Beach, Florida 32960 RE: 17th Lane SW Roadway Improvements Addendum #1 Indian River County Public Works Department Indian River County, Florida MM Project #0742 Dear Chris: The following is our proposed scope of services to amend our design for the 17th Lane SW Roadway improvements. Our July 8, 2008 plans illustrate the 17th Lane SW roadway improvements designed to meet Kimley-Horn's design of 27th Avenue improvements (4 -lane roadway). It is understood that the 4 -lane improvements to 27th Avenue will not be constructed in the immediate future; however, the County has designed and will construct a southbound left - turn lane on 27th Avenue in the interim. We therefore propose to amend our 17th Lane SW design to match the County's design of 27th Avenue. It is also understood that the County wishes to expedite the construction of the roadway improvements described above. As such, we are prepared to give the scope of services described below priority over other projects currently in our production schedule. Our August 4, 2008 meeting will serve as a "kick-off' meeting and we will commence work as soon as this proposal is forwarded to the Board of County Commissioners (BCC) for approval. Scope of Services Task 1— Construction Plans & Cost Estimate Update We will revise the "begin project" in our Construction Plans to the station and elevation we discussed during our August 4, 2008 meeting. In general, a low point will be added just east of the intersection, and a stormwater inlet and related piping will be incorporated into the design. We anticipate making revisions to the plan, profile, Station 1+00 cross section, and construction cost estimate. Permitting is not included. Project Schedule and Deliverables Upon receipt of the County's Notice to Proceed the project will be performed to the following schedule: 0 100% Plans Submittal: Within 30 days of Notice to Proceed. Mr. Christopher J. Kafer, Jr., PE Addendum 1 — Rev. 08/06/2008 Page 2 of 2 The following deliverables will be provided: • 100% Plans Submittal o One (1) Set of Construction Plans (Hardcopy, signed and sealed) o Electronic Copy of the Construction Plans (pdf format) o Engineer's Cost Estimate We propose to perform the Scope of Services for the following fees: Task 1 Construction Plans and Cost Estimate Update: $ 2,720.00 Billing will be as follows: Project will be billed upon submittal of deliverables. Any and all items not specifically set forth in this proposal are excluded. Specifically excluded items include but are not limited to soil borings, traffic studies, wetlands/endangered species studies/mitigation design, environmental permitting, landscape/irrigation designs, off-site water/sewer extensions; shared parking studies, structural/electrical engineering, architecture, construction stakeout and inspection services. All terms and conditions of the original contract shall apply. SEM/JMB/vk File #0742 (0742_Addendum 1_Rev._080608.doe) 17th Lane SW Roadway Improvements - Amendment 1 Breakdown of Fees 6 -Aug -08 Masteller Moler, Inc. August 4, 2008 1 Construction Plans & Cost Estimate Update Description Hours Rate Total Principal: 2 @ $ 135.00 = $ 270.00 P.E.: 8 @ $ 120.00 = $ 960.00 Drafter: 20 @ $ 70.00 = $ 17400.00 Admin: 2 @ $ 45.00 = $ 90.00 Total: $ 2,720.00 1 of 1 0742.xls