HomeMy WebLinkAbout2008-316 AMENDMENT NUMBER 2 TO WORK ORDER NUMBER 4
This Amendment Number 2 to Work Order Number 4 is entered into as of this 23rd day
of SePterber 200 8 , pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of April 6 , 2004 and amended effective April 7 , 2007
(as so amended , the "Agreement") , by and between Indian River County, a political
subdivision of the State of Florida ("County") and MASTELLER & MOLER , INC .
("CONSULTANT") .
1 . The County has selected the Consultant to perform the professional services set
forth in existing Work Order Number 4, Effective Date July 11 , 2006 .
2 . The County and the Consultant desire to amend this Work Order as set forth on
Exhibit 1 attached to this Amendment and made a part hereof by this reference . The
professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit 2 and within the timeframe more particularly set forth in Exhibit 3 , all in accordance
with the terms and provisions set forth in the Agreement.
3 . From and after the Effective Date of this Amendment , the above-referenced Work
Order is amended as set forth in this Amendment. Pursuant to paragraph 1 .4 of the
Agreement, nothing contained in any Work Order shall conflict with the terms of the
Agreement and the terms of the Agreement shall be deemed to be incorporated in each
individual Work Order as if fully set forth herein .
IN WITNESS WHEREOF , the parties hereto have executed this Amendment to Work
Order as of the date first written above .
CONSULTANT: BOARD OF COUNTY COMMISSIONERS
;MASTELLER & MOLER, INC . INDIAN RIVER COUNTY
n �
By : y r
ar H . st Iler, . Ey - _ : _v_�,
Wesle S-.- Davis, Vimirrn �l13 = r ' "
Title : President . BCC Approved Date : Septenber 23 , 2008
Date : Auqust 26 , 2008 Attest: J . K. Barton , Clerk of Court
By e l I� b,
Deputy Clerk
Approved :
� `
b "
seph A. Naird , County Adm istrator
Ap"rirovedoasform and legalsufficiency :
::2;
M ssistant C unty Attorney
Our File #0627
August 26, 2008
NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
AMENDMENT #2
TO
" EXHIBIT 2"
Method and Amount of Compensation
Masteller & Moler, Inc. proposes to provide the above Scope of Services based on the following
lump sum fees:
Task A — Surveying , Construction Plans and Permitting
Original Amendment Amendment Total
Fee #1 #2 Fee
Fee Increase Fee Increase
Surveying services and base
plans ; Engineering design ,
preparation of Construction
Plans ; preparation of $15, 320. 00 $68 , 230 . 00 $27 ,430 . 00 $ 110 , 980 . 00
Specifications and Bid
Documents utilizing Standard
IRC Bid Documents . Forms ,
Documents and Drawings will be
in electronic Format MS M04
Task B — Construction Services
Assistance during Bidding , Bid
Evaluation , Contract Award and
Construction Administration and $ 11 , 310 . 00 $ 9 . 305. 00 $0 , 00 $20 , 615 . 00
Periodic Administration and
Periodic Construction Field
Observation
TOTALS $26,630.00 $779535.00 $279430.00 $1319595.00
Y:1mm\Projects\2006\0627WDMIN\Gontracts\AMENDMENT #210627\Exhibit 2 Amend#2 082608.doc
AMENDMENT #2
TO
"EXHIBIT #2"
8/26/2008
LUMP SUM FEE TABULATION
INDIAN RIVER COUNTY
ADDITIONAL SURVEY & DESIGN SERVICES
FOR LATERAL G 16" REUSE MAIN ,
Professional Engineer Project Engineer Desi ner CAD Administration
$ 155 . 00 $ 125. 00 $ 80 . 00 $ 45 . 00 Total Costs Comments
Hours Amount Hours Amount Hours Amount Hours Amount
Engineering Design 20 $ 31100 . 00 20 $ 21500 . 00 70 $ 51600 . 00 1 $ 45 . 00 $ 11 , 245 . 00
Preparation of 8 $ 19240 . 00 20 $ 21500 . 00 80 $ 61400 . 00 1 $ 45 . 00 $ 10 , 185 . 00
Construction Plans
Prepare Specifications
and Bid Documents 6 $ 930 . 00 0 $ - 0 $ - 6 $ 270 :00 $ 11200 . 00
Total (hrs/cost) 34 $ 51270 . 00 40 $ 51000 . 00 150 $ 12 , 000 . 00 8 $ 360 . 00 $ 22 , 630 . 00
Surveying $4q8OO , OO
TOTAL $ 27 , 430 . 00
F11e#0627LA
Y:Mm\Projects\2006\0627WDMIN\Contracts\AMENDMENT #2\0627_Sched manhours.xls
Addendum 2
Our File #0627
August 26 , 2008
NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
AMENDMENT #2
TO
" EXHIBIT #3 "
• Time of Performance
The estimated time frame for completion of services from the approval of this Amendment # 1 to Work
Authorization #4 is as follows :
MILESTONE COMPLETION DATE
Surveying Services and Base
Plans ; Engineering Design &
Preparation of Construction Plans October 31 , 2008
Project Construction Services Completed April 30 , 2009
Dates are based on assumption that County Commission will approve during September, 2008 .
Y:\mm\Projects\2006\0627\ADMIN\Contracts\AMENDMENT #2\0627_Exhibit 3 Amen#2_082508.doc
F
a
Our File #0627LA
August 26 , 2008
NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
AMENDMENT #2 TO
" EXHIBIT 1 "
Work Authorization #4 , which was approved by the Board of County Commissioners on July 11 ,
2006 , included Engineering Services in connection with conversion of an existing 8" force main
to an 8" reuse pipeline. Addendum #1 was approved to authorize Engineering Services for the
removal of the existing 8" force main and its replacement with a 16" reuse main in accordance
with the Reuse Master Plan .
Since the route of the proposed 16" reuse main was to follow the route of the existing 8" force
main , logic would dictate that the route would be acceptable to the Indian River Farms Water
Control District (IRFWCD) . Surveying and construction plans were prepared and completed on
that basis . A permit application was prepared and submitted to IRFWCD which resulted in a
meeting on August 7 , 2008 . During that meeting , the IRFWCD indicated that in some areas
following the route of the existing 8" force main with the proposed 16" reuse main would not be
acceptable and required an altemate route involving 6200 LF of pipeline .
This Amendment #2 is presented to revise the plans and satisfy this requirement of IRFWCD in
order to secure their permit .
Since Amendment #1 Engineering Services including surveying and design have been
completed , additional services will be necessary to re-route portions of the proposed 16" reuse
main as required by the IRFWCD . Amendment #2 will therefore provide additional Engineering
and Surveying Services to design the reuse main route as required by IRFWCD .
The additional services covered by this Amendment #2 to the project will generally consist of the
following :
• Survey and Engineering services to design the abandonment in place of approximately
61200 LF of existing 8" force main and the construction of approximately 6 , 200 LF of 16"
reuse main along the route as required by IRFWCD .
There is no increase in the estimated construction cost of the project as described previously in
Addendum #1 which is $2 , 000 , 000. 00 .
Y:4nmlProjectsV006\0627\ADMimcontractsWMENDMENT #210627_Exhibit 2 Amend#2-082608.doc
�# wnpuappy ui pegijosep se pewjo}jad eq llegs saoiMes uoipnilsuoo — aBuey0 ON
saouuag uoipnilsuoo — 8 Nsel
• aOMdUl Aq pailnbaj se a;noi ay} Buole ulew asnaj .% }o =I-I ppZ 'g Alajewixoidde
jo uoipnilsuoo aLli pue uiew eoioj �g Bugsixe 10 dl ooZ ' 9 Ala}ewixoidde jo eoeld ui
luewuopuege aql jol s}uawnoop peiluoo pue suolleogloads ' sueld pefoid wnpuappy
aql ui palejodjooui aq of s}uawnoop peiluoo pue suoileogpeds ' sueld uoilorulsuoo
aiedaid pue uoilewjolui BuiAanjns tiesseoeu ayj SOI apino.id Ipm -oul 'jalow 3g jallalseVy •
suoileoWoa g/sueld 10eJIuOO — y �sel
S931AJOS 10 9CIO0S •
:moleq papinoid si Z# wnpuappy
' y# uoi}ezijoglny 5poM jo} salgejamlop pue seowas jo adoos ayl 10 uoilduosep jaijq y
Z abed
owztgZ/8
W IISIHX3 01 Z# 1N3WaN3WHf