HomeMy WebLinkAbout2004-067 ADDENDUM #7 TO CONTRACT DATED JANUARY 21 , 1997 BETWEEN INDIAN
RIVER COUNTY AND MASTELLER & MOLER, INC. FOR CR 512 PAVING &
DRAINAGE IMPROVEMENTS
INDIAN RIVER COUNTY PROJECT #9611
COUNTY ROUTE 512 CORRIDOR IMPROVEMENTS
ROSELAND ROAD TO I-95
INDIAN RIVER COUNTY, FL
I. ADDITIONAL SERVICES IN CONNECTION WITH THE FOLLOWING
CONSTRUCTION PLAN PREPARATION SERVICES :
Task A
Construction Plans shall be amended to incorporate modifications to the design for all median
openings based on red- lined direction provided to Masteller & Moler, Inc . by the October 1 ,
2003 letter from Christopher J. Kafer, Jr. P .E . , Indian River County Engineer. In order to
complete the design amendments, we shall revise the Construction Plans including Plan Views,
Cross- sections and Summary of Quantities.
We propose to perform the Scope of Services outlined under Task A for the lump sum fee of
$ 18, 550. 00,
Task B
Construction plans shall be amended to incorporate improvements in the July 16, 2003 letter
from Christopher J. Kafer, Jr. P . E. Develop within the Stormwater Lake E site located to the
southeast of the CR512 Bridge over the Sebastian River, the design for a parking facility for
recreational access by the public. The parking facility shall be accessed from the proposed new
County Route 512 roadway improvements and will include a median opening . Within the Lake
E site, the location for a pedestrian path surrounding the site ' s planned stormwater lake and the
conservation easement shall also be depicted.
This design task shall also require approval of the Lake E site improvements by the City of
Sebastian Planning & Zoning Commission. In addition, the inclusion of the pedestrian pathway
through the conservation easement will require modification to the issued St . John's River Water
Management District Environmental Resource Permit. Our proposal is based on the parking lot
and related grading design being developed in a manner that will not require modification to the
conservation easement boundary.
We propose to perform the Scope of Services outlined under Task B for the lump sum fee of
$ 102010. 00 ,
Time of Comaletion
We will complete our services as described above for Task A and Task B in approximately three
(3 ) weeks after our receipt of written authorization to proceed from Indian River County.
Addendum #7
3 / 10/04
Page 2
IN WITNESS WHEREOF the parties hereto have executed these presents this 23rd day of
March , 2004 .
MASTELLER & MOLER, INC . INDIAN RIVER COUNTY COMMISSION
2205 14th Avenue Indian River County, Florida
By: By : Y_
lfTF
arl H. ast ler E. Caroline D . Ginn
President 31/Q Chairman
Attest : � Attest .
3�rb/ ) Jeffrey K. Barton
Clerk of Court
EHM/cab
File #9649LS
(adden#7_rev . 031004 .doc)
, tnjian � iver County Approved
' Date
JAMES E . CHNDLE Administration
COUNTY ADMINISTRA O +
R
�
Budget lb
Co . Attorney O
Risk Management
Department 3 � �
Division C • /I • _
LUMP SUM FEE TABULATION 3/10/2004
1
ADDENDUM 97 TO CONTRACT DATED JANUARY 21 , 1997 BETWEEN INDIAN RIVER COUNTY &
MASTELLER & MOLER, INC . FOR CR 512 PAVING & DRAINAGE IMPROVEMENTS
INDIAN RIVER COUNTY PROJECT #9611
COUNTY ROUTE 512 CORRIDOR IMPROVEMENTS
ROSELAND ROAD TO 1 =95
INDIAN RIVER COUNTY, FLORIDA
Principle of Firm Professional Engineer Project Manager Cad Designer Administration
$ 135 . 00 Is 100 . 00 $ 85 . 00 $ 70. 00 $ 40. 00 Total
Hours Amount Hours Amount Hours Amount Hours Amount Hours Amount Costs
TASK A
Additions to incorporate 12 $ 11620 . 00 12 $ 11200 . 00 46 $ 31910 . 00 166 $ 11 , 620 . 00 5 $ 200 . 00
$ 18 , 550 . 00
design modifications for all
median openings based on
October 1 , 2003 letter from
Christopher J . Kafer, P . E .
Revise construction plans
to include Plan Views,
Cross-sections & Summary
of Quantities
TASK B
Amend plans to incorporate 14 $ 1 , 890. 00 24 $ 29400 . 00 16 $ 11360 . 00 60 $ 4 , 200. 00 4 $ 160 . 00
$ 10 , 010 . 00
July 16 , 2003 letter from
Christopher J . Kafer, P . E .
Develop within Stormwater
Lake E Parking Facility for
Recreational Access; Design
Pedestrian Path around
Lake E .
Modify issued SJRWMD
Permit & Approval by City of
Sebastian Planning & Zoning
Commission
Totals 26 36 62 226 9 $ 28 , 560 . 00
File 9643-Addn.97
Sched_manhours.xls
(Design_Services) Rev. 3/03104