Loading...
HomeMy WebLinkAbout2004-067 ADDENDUM #7 TO CONTRACT DATED JANUARY 21 , 1997 BETWEEN INDIAN RIVER COUNTY AND MASTELLER & MOLER, INC. FOR CR 512 PAVING & DRAINAGE IMPROVEMENTS INDIAN RIVER COUNTY PROJECT #9611 COUNTY ROUTE 512 CORRIDOR IMPROVEMENTS ROSELAND ROAD TO I-95 INDIAN RIVER COUNTY, FL I. ADDITIONAL SERVICES IN CONNECTION WITH THE FOLLOWING CONSTRUCTION PLAN PREPARATION SERVICES : Task A Construction Plans shall be amended to incorporate modifications to the design for all median openings based on red- lined direction provided to Masteller & Moler, Inc . by the October 1 , 2003 letter from Christopher J. Kafer, Jr. P .E . , Indian River County Engineer. In order to complete the design amendments, we shall revise the Construction Plans including Plan Views, Cross- sections and Summary of Quantities. We propose to perform the Scope of Services outlined under Task A for the lump sum fee of $ 18, 550. 00, Task B Construction plans shall be amended to incorporate improvements in the July 16, 2003 letter from Christopher J. Kafer, Jr. P . E. Develop within the Stormwater Lake E site located to the southeast of the CR512 Bridge over the Sebastian River, the design for a parking facility for recreational access by the public. The parking facility shall be accessed from the proposed new County Route 512 roadway improvements and will include a median opening . Within the Lake E site, the location for a pedestrian path surrounding the site ' s planned stormwater lake and the conservation easement shall also be depicted. This design task shall also require approval of the Lake E site improvements by the City of Sebastian Planning & Zoning Commission. In addition, the inclusion of the pedestrian pathway through the conservation easement will require modification to the issued St . John's River Water Management District Environmental Resource Permit. Our proposal is based on the parking lot and related grading design being developed in a manner that will not require modification to the conservation easement boundary. We propose to perform the Scope of Services outlined under Task B for the lump sum fee of $ 102010. 00 , Time of Comaletion We will complete our services as described above for Task A and Task B in approximately three (3 ) weeks after our receipt of written authorization to proceed from Indian River County. Addendum #7 3 / 10/04 Page 2 IN WITNESS WHEREOF the parties hereto have executed these presents this 23rd day of March , 2004 . MASTELLER & MOLER, INC . INDIAN RIVER COUNTY COMMISSION 2205 14th Avenue Indian River County, Florida By: By : Y_ lfTF arl H. ast ler E. Caroline D . Ginn President 31/Q Chairman Attest : � Attest . 3�rb/ ) Jeffrey K. Barton Clerk of Court EHM/cab File #9649LS (adden#7_rev . 031004 .doc) , tnjian � iver County Approved ' Date JAMES E . CHNDLE Administration COUNTY ADMINISTRA O + R � Budget lb Co . Attorney O Risk Management Department 3 � � Division C • /I • _ LUMP SUM FEE TABULATION 3/10/2004 1 ADDENDUM 97 TO CONTRACT DATED JANUARY 21 , 1997 BETWEEN INDIAN RIVER COUNTY & MASTELLER & MOLER, INC . FOR CR 512 PAVING & DRAINAGE IMPROVEMENTS INDIAN RIVER COUNTY PROJECT #9611 COUNTY ROUTE 512 CORRIDOR IMPROVEMENTS ROSELAND ROAD TO 1 =95 INDIAN RIVER COUNTY, FLORIDA Principle of Firm Professional Engineer Project Manager Cad Designer Administration $ 135 . 00 Is 100 . 00 $ 85 . 00 $ 70. 00 $ 40. 00 Total Hours Amount Hours Amount Hours Amount Hours Amount Hours Amount Costs TASK A Additions to incorporate 12 $ 11620 . 00 12 $ 11200 . 00 46 $ 31910 . 00 166 $ 11 , 620 . 00 5 $ 200 . 00 $ 18 , 550 . 00 design modifications for all median openings based on October 1 , 2003 letter from Christopher J . Kafer, P . E . Revise construction plans to include Plan Views, Cross-sections & Summary of Quantities TASK B Amend plans to incorporate 14 $ 1 , 890. 00 24 $ 29400 . 00 16 $ 11360 . 00 60 $ 4 , 200. 00 4 $ 160 . 00 $ 10 , 010 . 00 July 16 , 2003 letter from Christopher J . Kafer, P . E . Develop within Stormwater Lake E Parking Facility for Recreational Access; Design Pedestrian Path around Lake E . Modify issued SJRWMD Permit & Approval by City of Sebastian Planning & Zoning Commission Totals 26 36 62 226 9 $ 28 , 560 . 00 File 9643-Addn.97 Sched_manhours.xls (Design_Services) Rev. 3/03104