Loading...
HomeMy WebLinkAbout2009-087 IRC Work Order #2U 3w Lilt Station # 143 � March 5 , 2009 Page 1 of2 park \ C�DOG ,�OQ 7 Board of County Commissioners Administration - Building A ( South) 1801 27th Street Vero Beach , Florida 32960 Telephone : ( 772 ) 5674000 FAX : 772478 -9391 Project . Sewer Lift Station # 143 Transite Force Main Replacement Topographic Survey WORK ORDER NO . 2 ( Utilities 2009 ) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING /GIS SERVICES WITH Masteller , Moler, Reed & Taylor , Inc . In accordance with Contract No , 0725 2007 -2009 This Work Order No . 2 ( Utilities 2009 ) is in accordance with the existing AGREEMENT dated November 6th , 2007 between Masteller, Moler , Reed & Taylor, Inc . (SURVEYOR) and Indian River County ( COUNTY) . This Work Order No . 2 ( Utilities 2009 ) amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . 2 ( Utilities 2009 ) is for the SURVEYOR to perform surveying services in connection with the design and replacement of an existing transite force main . The survey limits are from Lift Station # 143 located at Young ' s Market at 2601 South U . S . Highway No . 1 west to Old Dixie Highway , lying in Indian River County , Florida . SECTION II = SCOPE OF SERVICES As agreed upon between Masteller , Moler , Reed & Taylor, Inc . and Indian River County , the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 2 ( Utilities 2009 ) described as follows : • Recover horizontal and vertical control and establish survey baseline as directed by the engineer. • Locate all existing monurnentation for establishment of existing rights of way , easements and platted lines . • Research property appraiser records and recorded plats to identify existing easements etc along the route . • Locate and identify all visible topographic features along the route , including but not limited to buildings , utilities , pavement , culverts , • Perform cross sections and obtain elevations along the route at 100 foot intervals sufficient for engineering utility design purposes . Elevations will be based on NGVD 1929 unless otherwise directed . • Prepare topographic survey , including depiction of elevations , improvements , and right of way , easement and land lines . r IRC Work Order # 2U Lift Station # 143 March 5 , 2009 Page 2 of 2 SECTION III — TIME FOR COMPLETION , DE LIVERABLES/WORK PRODUCT • Project shall be completed within thirty ( 30) business days from Notice to Proceed . • Prepare and provide five paper copies and one digital file of Topographic survey upon completion of the project . SECTION IV — COMPENSATION The COUNTY agrees to pay , and the SURVEYOR agrees to accept , for services rendered as identified in Sections I , II and III of this Work Order No . 2 ( Utilities 2009 ) a lump sum fee of $5 , 900400 , The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 24th day Of Vhrch 2009 , OWNER Surveyor BOARD OF COUNTY COMMISSIONERS Masteller, Moler, Reed &Taylor Inc . INDIAN RIVER COUNTY, FLORIDA (Signature) (Signature) / Wesley S . Davis r Chairman M T l �— re t idenl� (Printed name and title) tented name and title) Approved by BCC Varch 249 2009 ATTEST . Jeffrey K.'Sarton , Clerk�pf Circuit Court Witnessed by : �/ Deputy Clerk (Printed name) Approved as to Form and Legal Sufficiency : � f Marian E . Fell , Sr. Assistant County Attorney proved :, oseph gird , CO TY Ad inistrator