HomeMy WebLinkAbout2005-270 T
s y
INDIAN RIVER COUNTY
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
SURVEYING and MAPPING SECTION
PROJECT # 0504
PROFESSIONAL SURVEYING SERVICES ( MASTER) AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
THIS AGREEMENT , entered into this 9th day of August , 2005 by and between
INDIAN RIVER COUNTY , a political subdivision of the State of Florida , hereinafter
referred to as the " COUNTY" , and NICK MILLER , INC . hereinafter referred to as the
" SURVEYOR" .
WITNESSETH
That the COUNTY and the SURVEYOR , in consideration of their mutual
covenants , herein agree the pursuit of this agreement and the foregoing request for
qualifications ( RFQ ) are a direct result of proper advertising and procedures as set forth
by the Consultants Competitive Negations Act ( C . C . N . A . ) as it relates to this ensuing
agreement and with respect to the performance of professional surveying and mapping
services by the SURVEYOR , and the payment for those services by the COUNTY , as
set forth below and in subsequent individual Work Orders .
This agreement shall be referred to as the " MASTER AGREEMENT" under which
future Work Orders will apply .
The SURVEYOR shall provide the COUNTY with professional surveying and
mapping services and such other related services as defined in specific Work Orders , in
all phases of each project . The SURVEYOR shall serve as the COUNTY' s professional
representative for the project as set forth in each Work Order , and shall give surveying
and mar � ; in5 advice to the COUNTY during the performance of the tc- be
rendered .
SECTION I — STANDARDS
All professional Surveying and Mapping services related to this agreement and
subsequent work orders shall adhere to Chapter 177 & Chapter 472 , Florida Statutes
and Chapter 61G17 Minimum Technical Standards ( MTS ) , Florida Administrative Code
as it applies and/or is applicable
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc. .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg2of11
SECTION II — PROJECT PHASES
The project shall be completed in phases encompassing specific Townships or
Sections within the COUNTY . Project phases and limits shall be identified in individual
Work Orders prepared by the COUNTY and approved by the SURVEYOR . Each Work
Order will be sequentially numbered and formally approved by the COUNTY prior to a
Notice-to- Proceed being issued .
Basic services required of the SURVE 'rOR for the project will be described in
other appropriate sections of this Agreement and /or in individual Work Orders .
SECTION III — COUNTY OBLIGATIONS
The COUNTY agrees to provide the following material , data , or services as
required in connection with the work to be performed under this Agreement .
A . Provide the SURVEYOR with a copy of any pertinent preliminary data or
reports available to the COUNTY .
B . Provide the SURVEYOR with all reasonably available drawings , surveys ,
right-of-way maps , and other documents in the possession of the
COUNTY that are pertinent to the project and not part of public record .
C . The COUNTY shall assist in making provisions for the SURVEYOR to
enter upon public or private property as reasonably required for the
SURVEYOR to perform his services .
D . The COUNTY shall supply the SURVEYOR with copies of all applicable
local codes and regulations .
E . All documents , plats , maps part of or included in public records shall be
obtained by the SURVEYOR and all costs included in services .
SECTION IV — SCOPE OF SERVICES
The SURVEYOR agrees to perform all necessary professional surveying and
mapping services and other pertinent services in connection with the assigned project
as required and as set forth in the following :
A . General
1 . The SURVEYOR will endeavor not to duplicate any previous work
done on any project . Before issuance of a Work Order and written
authorization to proceed , the SURVEYOR shall consult with the
COUNTY to clarify and define the COUNTY' s requirements for the
project and review all available data .
2 . The SURVEYOR shall attend conferences with the COUNTY and
its representatives , upon request .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg3of11
( Cont)
3 . In order to accomplish the work described under this Agreement
under the time frames and conditions set forth in this Agreement ,
the SURVEYOR shall :
a ) Complete work on the project within the time allowed by
maintaining an adequate staff of registered surveyors and
mappers , Cadd operators and other employees on the Work at
all times .
b ) Comply with all federal , state , and local laws applicable to this
project( s )and related safety procedures as per F . D . O . T . for
surveyors . The SURVEYOR ' S work product shall conform
with all applicable federal , state and local laws applicable to
this project( s ) .
c) The SURVEYOR shall cooperate fully with the COUNTY in
order that all phases of the work may be properly scheduled
and coordinated .
d ) The SURVEYOR shall contact all utility companies having
installations in the vicinity of proposed work as required if
excavations are necessary . The SURVEYOR shall be
deemed to have complied with this provision upon placing a
utility location request with Sunshine State One-Call .
e ) The SURVEYOR shall report the status of the project to the
County Surveyor or staff upon request and hold all drawings ,
calculations , and related work open to the inspection of the
COUNTY at any time , upon reasonable request .
4 . All original documents ( copy of) , survey notes , tracings , and the
like , including all items furnished to the SURVEYOR by the
COUNTY pursuant to this Agreement , are and shall remain the
property of the COUNTY , and shall be delivered to the COUNTY
upon completion of the work . All items prepared by the
SURVEYOR shall be created , maintained , updated , and provided in
the format as specified by the COUNTY .
5 . Compensation to the SURVEYOR for basic services shall be in
accordance with each Work Order, as mutually agreed upon by the
SURVEYOR and the COUNTY . Schedule of current hourly billing
rates are included in " Exhibit A" attached , and will be included as
part of each Work Order when approved .
SECTION V — TIME FOR COMPLETION
The time for completion of each project shall be defined in each individual Work
Order.
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc. .doc
1
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg4of11
SECTION VI — COMPENSATION
The COUNTY agrees to pay , and the SURVEYOR agrees to accept , for services
rendered pursuant to this Agreement , fees in accordance with the following :
A . Professional Services Fee - The basic compensation shall be mutually
agreed upon by the SURVEYOR and the COUNTY prior to issuance of
each Work Order, and the amount shall be included in the Work Order to
be formally approved by the Board of County Commissioners .
Be Direct Payment for Certain Services - The COUNTY agrees to pay on a
direct basis for services or goods provided by others working in
conjunction with the SURVEYOR , as follows :
1 . Printing and Reproduction : The COUNTY shall make direct
payment to the SURVEYOR for the cost of blueprints . The
maximum cost allowed per blueprint, shall be set forth in the Work
Order,
2 . Concrete Monuments as set forth in the Work Order .
3 . Professional consultation Re-search and document/records
acquisitions directly related to the specific work order shall be part
of and as set forth in the work order.
SECTION VII — ADDITIONAL SERVICE WORK
Additional service work occurs when the COUNTY requests changes after it has
formally approved this Agreement . Additional service work shall not commence until a
Work Order for the additional work has been formally issued by either the County
Surveyor, County Public Works Director or their designee , and formally approved by the
Board of County Commissioners , and the additional service work shall be performed in
accordance with the fee schedule set forth in that Work Order.
SECTION VIII — CHANGE IN THE PROJECT SCOPE AFTER A WORK ORDER HAS
BEEN EXECUTED
If the project scope is changed after a Work Order has been executed , such work
shall be the subject of a Supplemental Work Order formally approved by the Board of
County Commissioners ,
SECTION IX — PAYMENTS
The COUNTY shall make monthly partial payments Pursuant to Florida Prompt
Payment Act ( F . S . 218 . 70 ) to the SURVEYOR as provided for in the Work Order. A ten
percent ( 10 % ) retainage shall be withheld by the COUNTY until all of the SURVEYOR' s
work is completely accepted by the COUNTY . If work is held up on the project for six
months or greater due to no fault of the SURVEYOR , the SURVEYOR may request
release of the accumulated retainage .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg5of11
( Cont )
Unless otherwise stated in the Work Order, the SURVEYOR shall submit duly
certified invoices in triplicate to the County Surveyor, County Public Works Director or
their designee , prior to payment.
The Agreement shall be divided into units of deliverables , which shall include , but
not be limited to , reports , findings , drawings , and drafts , that must be received and
accepted in writing by the either the County Surveyor , County Public Works Director or
+ hgvir rJ oinnoo nrinr +n noximcn+
bi i is ueoiyo � :.�. , til wl Lv F✓ y I o w1 it ,
A standard invoice template is to be created by the SURVEYOR , approved by
the COUNTY and shall be utilized for all projects and/or work orders related to this
agreement .
SECTION X — RIGHT OF DECISIONS
All services shall be performed by the SURVEYOR to the satisfaction of the
County Surveyor and /or Public Works Director who shall decide all questions ,
difficulties , and disputes of whatever nature that may arise under or by reason of this
Agreement , according to the prosecution and fulfillment of the service hereunder, and
the character, quality , amount and value thereof. The COUNTY' s decision upon all
claims , questions , and disputes shall be final , conclusive , and binding upon the parties
hereto , unless such determination is arbitrary or unreasonable .
The County Public Works Director shall review adjustments of compensation and
contract time because of any major changes in the work that might become necessary
or be deemed desirable as the work progresses . If the SURVEYOR does not concur in
the judgment of the County Public Works Director as to any decisions made by him or
her, it shall present its written objections to the County Administrator of Indian River
County , who shall make a decision , and the SURVEYOR shall abide by the County
Administrator' s decision , unless the decision is arbitrary or unreasonable .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
' PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg6of11
SECTION XI — OWNERSHIP AND REUSE OF DOCUMENTS
A . Ownership and Copyright : Ownership and copyright of all reports ,
tracings , plans , specifications , field books , survey information , maps ,
contract documents , and other data (excluding proprietary software
developed by SURVEYOR for SURVEYOR' s own use in the course of the
WORK ) , developed by the SURVEYOR pursuant to this Agreement , shall
be vested in the COUNTY . Said materials shall be made available to the
COUN I Y by the SUKVE Y OK at any time upon request of the COUNT Y ,
On or before the tenth day after all work contemplated under this
Agreement is complete , all of the above materials shall be delivered to the
County Surveyor
B , Reuse of Documents : All documents , including but not limited to reports ,
drawings and specifications , supplied by the COUNTY or any other
entities which have been obtained for the purpose of research and
planning is exclusively for the purpose of this contract and shall remain in
the custody of the SURVEYOR during the agreement period . The
SURVEYOR shall not under any circumstance use or reproduce the
information for their or any other entities benefit that is not directly related
to this contract and subsequent work orders .
C . All documents , including but not limited to reports , drawings and
specifications , prepared by the SURVEYOR pursuant to this Agreement ,
are related exclusively to the services described herein . They are intended
or represented to be suitable for reuse by the COUNTY or others on
extensions of this project or on any other project. The COUNTY' s reuse of
any document or drawing shall be at the COUNT Y' s own risk . The
COUNTY shall not hold the SURVEYOR liable for any modifications made
to the documents by others .
SECTION XII — NOTICES
Any notices , reports or other written communications from the SURVEYOR to the
COUNTY shall be considered delivered when posted by certified mail or delivered in
person to the County Surveyor or designee . Any notices , reports or other
communications from the COUNTY to the SURVEYOR , shall be considered delivered
when posted by certified mail to the SURVEYOR at the last address left on file with the
COUNTY or delivered in - person to said SURVEYOR or its authorized representative .
F:\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
' PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg7of11
SECTION XIII — TERMINATION
Either party may terminate this Agreement upon seven ( 7 ) days written notice to
the other party , except if the SURVEYOR terminates this Agreement , such termination
shall not be effective , absent the COUNTY ' s consent , until the SURVEYOR ' S
completion to the COUNTY' s satisfaction , of any pending Work Order.
cGrT11ON XIV _ Sl IRVEYOFUS PFRCONNEI ASSIC; NFn Tn THE PROJECT
ini i. Va G
5V G a XIV i aI rI G a s e V8 % ie a PER
SONNEI
COUNTY shall have the right of approval of all SURVEYOR ' s personnel
assigned to any COUNTY project . Therefore , any subsequent changing of assigned
personnel to any COUNTY project shall also be subject to COUNTY approval . Failure
to adhere to this policy shall be considered a cause for contract termination .
SECTION XV — AUDIT RIGHTS
The COUNTY reserves the right to audit the records of the SURVEYOR related
to this Agreement at any time during the prosecution of the work included herein and for
a period of three years after final payment is made .
SECTION XVI — SUBLETTING
The SURVEYOR shall not sublet , assign , or transfer any work under this
Agreement without the written consent of the COUNTY. When applicable and upon
receipt of such consent in writing , the SURVEYOR shall cause the names of the
engineering and surveying firms responsible for the major portions of each separate
specialty of the work to be inserted on the reports or other data .
SECTION XVII — WARRANTY
The SURVEYOR warrants that it has not employed or retained any company or
person other than a bona fide employee working solely for the SURVEYOR , to solicit or
secure this Agreement, and that it has not paid or agreed to pay any company or person
other than a bona fide employee working solely for the SURVEYOR any fee ,
commission , percentage fee , gifts or any other considerations , contingent upon or
resulting from the award or making of this Agreement . For the SURVEYOR' S breach of
violation of this warranty , the COUNTY shall have the right to annul this Agreement
without liability .
SECTION XVIII — DURATION OF AGREEMENT
This Agreement shall remain in full force and effect for a period of two years after
the date of execution thereof, or until completion of all project phases as defined by the
County Surveyor and /or Public Works Director, whichever occurs first , or unless
otherwise terminated by mutual consent of the parties hereto , or terminated pursuant to
Section XII — "Termination . " This Agreement may be extended at the discretion of the
COUNTY .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg8of11
SECTION XIX — INSURANCE
During the performance of the work covered by this Agreement , the SURVEYOR
shall provide the COUNTY with evidence that the SURVEYOR has obtained and
maintains the insurance listed in the Agreement .
1 . SURVEYOR shall procure and maintain for the duration of the Agreement ,
insurance against claims for injuries to persons or damages 10 property
which may arise from or in connection with the performance of the work
hereunder by the SURVEYOR , its agents , representatives , employees or
subcontractors . The cost of such insurance shall be included in the
SURVEYOR' s fees .
2 . Minimum Scope of Insurance (for fees less than $ 500 , 000 ) :
A . Worker' s Compensation as required by the State of
Florida . Employers Liability of $ 100 , 000 each accident ,
$ 500 , 000 disease policy limit , and $ 100 , 000 disease each
employee .
B . General Liability $ 1 , 000 , 000 combined single limit per
accident for bodily injury and property damage . Coverage
shall include premises/operations , products/completed
operations , contractual liability , and independent
contractors . COUNTY shall be named an "Additional
Insured " on the certificate of insurance .
C . Auto Liability $ 500 , 000 combined single limit per accident
for bodily injury and property damage . Coverage shall
include owned vehicles , hired vehicles , and non -owned
vehicles . COUNTY shall be named an "Additional Insured "
on the certificate of insurance .
D . Professional Liability Insurance providing coverage for
negligent acts , errors , or omissions committed by
SURVEYOR with a $ 500 , 000 per claim/annual aggregate .
This insurance shall extend coverage to loss of interest ,
earning , profit , use and business interruption , cost of
replacement power, and other special , indirect , and
consequential damages .
3 . SURVEYOR ' s insurance coverage shall be primary .
4 . All above insurance policies shall be placed with insurers with a Best' s
rating of no less that A-VII . The insurer chosen shall also be licensed to
do business in Florida .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg9of11
( Cont)
5 . The insurance policies procured , other than professional liability , shall be
occurrence forms , not claims made policies . Professional liability shall be
on a claims-made basis .
6 . The insurance companies chosen shall provide certificates of insurance
.f i r . i r • r1 • /% _ i. . r1 : _ I . \ A _ .- _ ,.t i
prior to signing or contracts , to the Indian rciver uUmILy M15h ivianaguemenl
Department .
7 . Each insurance company shall provide the Indian River County Risk
Management Department with a certificate of insurance that states that
the insurance company will provide 30 days notice to the Risk
Management Department , of its intent to modify or cancel said policies of
insurance . Such notice shall be in writing by registered mail , return receipt
requested , and addressed to the Risk Manager of the Risk Management
Department .
8 , The SURVEYOR shall include all sub-contractors as insured under its
policies or shall furnish separate certificates and endorsements for each
subcontractor. All coverages for subcontractors shall be subject to all of
the requirements stated herein .
9 . Any deductibles or self- insured retentions greater than $ 5 , 000 must be
approved by the Risk Manager for Indian River County with the ultimate
responsibility for same going to the SURVEYOR .
SECTION XX = INDEMNIFICATION
SURVEYOR hereby agrees to indemnify , and hold harmless , the COUNTY , and
the COUNTY' s officers , employees and agents , from and against any and all claims
from liabilities , damages , losses , costs , third party claims , judgments , and expense to
persons or property , including reasonable attorneys ' fees , to the extent caused by the
negligence , recklessness , or intentionally wrongful conduct of SURVEYOR , or of
SURVEYOR' s officers , employees , or agents , and SURVEYOR shall indemnify the
COUNTY against any such claims and any judgments that may be entered in
connection therewith , including reasonable attorneys ' fees .
SECTION XXI — SAFETY
The Surveyor is solely responsible for any job site and M . O .T . ( Maintenance Of
Traffic ) safety procedures as set forth for Surveyors by the Department of
Transportation . All field survey personnel and supervisors shall be M . O . T . certified in
their applicable positions throughout the agreement period . It is understood the
COUNTY is held harmless for any safety violations and/or injuries while performing task
related to this agreement .
The SURVEYOR may report any observed job site safety violations by others to the
COUNTY .
F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, hic . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY
TOWNSHIP P and SECTIONAL SURVEYING AND MAPPING SERVICES
Pg OJUL2 9 2005
INDIAN RIVER COUNTY
SECTION XXII — CHOICE OF LAW AND VENUE ENGINES lroi !N ley , IOI
The laws of the State of Florida shall govern this Agreement . Venue for any lawsuit
brought by either party against the other party or otherwise arising out of this Contract
shall be in Indian River County, Florida , or in the event of a federal jurisdiction , in the
United States District Court for the Southern District of Florida .
SECTION XXIII — ENTIRETY OF AGREEMENT
This writing embodies the entire Agreement and understanding between the
parties hereto , and there are no other Agreements and understandings , oral or written ,
with reference to the subject matter hereof that are not merged herein and superseded
hereby . No alteration , change , or modification of the terms of this Agreement shall be
valid unless made in writing and signed by both parties hereto .
SECTION XXIV — SEVERABILITY
If any provision , section , or paragraph of this agreement is determined by a court
of competent jurisdiction to be void , illegal , or unenforceable , the remaining portions not
found to be void , illegal , or unenforceable , shall remain in full force and effect .
IN WITNESS WHEREOF the parties hereto have executed these presents this
9th day of August , 2005 .
BOARD OF COUNTY COMMISSIONERS NI ILLER, INC .
("INDIAN RIVER COUNTY, FLORIDA
V E') i (Sin ure)
Thomas S . Lowther, C`�ialrt>< _ r' ( c - 1� � �.. L t'� rt�bb :r r
(Printed name and title) � . ; " (Printed name and title)
Approved by BCC ?august 9 , 2005
ATTEST : \
J7 K . Barth+` Cler QRctht' Court Witnessed by :
F
� C ,^ °
y Deputy Clerk (Printed name Nk
C k.,N, I C-�
App a as to Form and Legal Sufficiency :
m . Co i o ney
Approved *
fION � A 11
Jo h A. acrd , County Administrator
T:\1000\1088 IRC Survey\Contract Documents\0504 Twp-Sectional project MASTER CONTRACT -Nick Miller, Inc . .doc
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR THE EASTERN INDIAN RIVER COUNTY „ �, mom
TOWNSHIP and SECTIONAL SURVEYING AND MAPPING SERVICES %� �'
Pg 11 of 11 / F� 4
EXHIBIT ""A” NICK MILLER , INC.
FEE SCHEDULE
Eastern Indian River County Township/Sectional Control Survey project 0504
OFFICE :
Director / P . S .M. : $ 130 .00
Project Manager / P . S .M. : $ 115 .00
Graduate Surveyor/Assistant Project Manager: $95 .00
Survey Technician (Cadd/Processing) : $70. 00
Geodetic Processing : $90 . 00
Administrative assistant (Re-Search - Clerical) : $45 . 00
FIELD :
Supervisor: $ 100 .00
3 -man survey crew (includes GPS) : $ 120 .00
2-man survey crew (includes GPS) : $ 100 .00
Crew Chief. $ 50.00
ANTICIPATED REIMBURSABLE EXPENSES :
3 - 1 /2 " Imprinted Aluminum Disk for use in concrete monuments $ 12 . 00
Pre-Cast Concrete Monument (24-inch) $ 9 .00
Pre-Cast Concrete Monument (36-inch) $ 13 . 00
Pour-in-place Concrete Monument $ 50.00
Blueprints/Large Format Copies (per page) $ 1 . 00
Research/Consultation with Other Surveyors * $75 . 00 - $ 100 . 00
*This is the fee charged by the other surveyor for researching his/her survey records . This is only an estimate, as
Nick Miller, Inc . cannot quote fees for other businesses .
All fees are per hour unless otherwise noted.
F:\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp-Sectional project MASTER
CONTRACT -Nick Miller, Inc . .doc
Board of County Commissioners
1810 25th Street
Vero Beach , Florida 32960
Telephone : (772) 567=8000 FAX : 772 =778=9391
WORK ORDER NO . 1 ( Engineering )
FOR
PROFESSIONAL SURVEYING AND MAPPING SERVICES
SPECIFICALLY RELATED TO THE
EASTERN INDIAN RIVER COUNTY
TOWNSHIP and SECTIONAL HORIZONTAL CONTROL
SURVEYING and MAPPING SERVICES
2005 -2006 CONTRACT/PROJECT NO , 0504
WITH
Nick Miller Inc .
Project .
Phase two
( Phase one — Township study by Carter)
Services for :
Surveying and Mapping the Township ( s ) and interior sections of
Township 33East , Range 39South
AND
Township 32East , Range 39South .
Eastern Indian River County
( Reference project location map page 2 )
This Work Order No . 1 is in accordance with the existing MASTER
AGREEMENT dated August 9th , 2005 between Nick Miller, Inc . ( SURVEYOR )
and Indian River County ( COUNTY) . This Work Order No . 1 amends the
agreement as follows :
Provide professional Surveying and Mapping services for the purpose of
professional consultation , planning , research , reconnaissance , field surveying ,
mapping and other related services as needed to complete anticipated tasks of
the Townships and Sections as outlined in sections I , II , III and IV hereon .
I . E .
Phase two : Township 33E , Range 39S AND Township 32E , Range 39S .
( Reference project location map page 2 )
>F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp. 33 -39 32 -39 Nick Miller-IRC
W0# 1 8-09-05 -mob.doc
Page 2 of 6
Surveying and Mapping the Township ( s) and interior sections of
Township 33E , Range 39S AND Township 32E , Range 39S .
Work Order # 1
Location Map :
Phase two : Township 33E , Range 39S AND Township 32E , Range 39S .
Leg
d
Ferre Townchl,^, Survey Ures
v,
' Water & Drainage
/ y r
. sec. s & Tracks
a FulLfs Sur sys
-owr.snip Sidvvey Liles
YTWP 31S , RGEP38E
FUTURE P 32S - RGE: 38E TWP 32S - RGE43SE
SURVEYS ,
SURVEYS;
ti
y.TWP 33S -
E: 38 TWP 335 - RGE*3JE
/
SECTION I — PROJECT LIMITS
Phase Two
Entire Township ( s ) and interior sections of
Township 33E , Range 39S AND Township 32E , Range 39S .
Area approximately bounded by :
To the south by the County line .
To the north by 77th street .
To the east by eastern limits of said Townships through the Indian River and Barrier Island .
To the west by 74th ave .
( Reference location map)
>F:\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp . 33 -39 32-39 Nick Miller- IRC
W0# 1 8-09-05 -mob.doc
Page 3 of 6
Surveying and Mapping the Township(s ) and interior sections of
Township 33E , Range 39S AND Township 32E , Range 39S .
Work Order # 1
SECTION II — SCOPE OF SERVICES
This Work Order No . 1 is for providing professional Surveying and Mapping
services for the purpose of professional consultation , planning , research ,
reconnaissance , field surveying , mapping and other related services as
needed to complete anticipated tasks of the mentioned Townships and
Sections .
Services shall include all related research , consultation , meetings , field and
office professional Surveying and Mapping procedures to accomplish all tasks
as outlined in the attached ( Exhibit "A" ) hereon .
SECTION III — DELIVERABLES
Note : All times are based on calendar days from receipt of written notice to proceed .
1 . Prepared presentation outlining benefits of project to local surveying and
engineering community — completed within 30 days .
2 . Preliminary overviews of the two townships to be delivered as an ArcGIS
geodatabase and AutoCAD drawing files . The overviews will contain all
information derived from the research phase of the project — completed within 60
days .
3 . Scanned Murphy Act deeds ( linked to existing Indian River County GIS ) —
completed within 90 days .
4 . Reference sketches for all section and quarter section corners where monuments
have been recovered — completed within 150 days .
5 . Horizontal control survey results delivered in ArcGIS geodatabase and as
AutoCAD drawing files — completed within 150 days .
6 . Updated township overviews showing corners found and relation to the horizontal
control survey . Overviews to be delivered as an ArcGIS geodatabase and in
AutoCAD drawing files — completed within 180 days .
7 . A report summarizing the status of section and quarter section corners within the
two townships . The status information will include the results of corner searches ,
physical characteristics of monuments , lineage and recommendations regarding
acceptance and/or further investigation — completed within 180 days .
SECTION IV = TIME FOR COMPLETION
Scheduling is based on months from receipt of notice to proceed .
Scope of Services Items 1 through 5 — Completed within 2 months .
Scope of Services Items 6 and 7 — Completed within 3 months .
Scope of Services Items 8 through 11 — Completed within 6 months .
SECTION V — COMPENSATION
The COUNTY agrees to pay , and the SURVEYOR agrees to accept , a fee
for services rendered according to the all items as defined in Sections II , III
and IV of this Work Order No . 1 , NOT TO EXCEED THE AMOUNT of
$ 164 , 000 . 00
>F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp. 33 -39 32 -39 Nick Miller- IRC
W0# 1 8 -09-05 -mob.doc
iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillilillillillI MEN
Page 4 of 6
Surveying and Mapping the Township(s ) and interior sections of
Township 33E , Range 39S AND Township 32E , Range 39S .
Work Order # 1
( Cont)
The AGREEMENT is hereby amended as specifically set forth herein . All
remaining sections of the AGREEMENT shall remain in full force and effect ,
and are incorporated herein .
IN WITNESS WHEREOF the parties hereto have executed these
presents this 9th day of August 2005 ,
OWNER NICK MILLER , INC .
BOARD OF COUNTY
COMMISSIONERS
INDIAN RIVER COUNTY,
FLORIDA
Je
s �.---
(Signature) (1Si,�nature)
, .a + Tf> omas S . Lowther, Chairman N tC,,�- &A It.._t_Ee • U ICE - M�S, DE\�T
"(,Pfmtb name and title) (Printed name and title)
• Ai •
Approved fr-.
BCC At� crr�t 99 2005
•
ATTEST, � : Witnessed by:
q • • . . . ,leffr . , Barton , Clerk of Circuit
tco
Deputy Clerk Printed na e)
� � �Q.IC L
Approved as to Form and Legal
Suffic' ency . t
G . Com , oun
Attorney
pproved :
seph X Baird , County Administrator
ont with Scope of services AND Fee schedule Exhibit A)
>T:\1000\1088 IRC SurveyWontract Documents\0504 Twp . 33 -39 32-39 Nick Miller-IRC W0# 1 8-09-05-mob.doc
Page 5 of 6 .
Surveying and Mapping the Township (s) and interior sections of *jA
Township 33E , Range 39S AND Township 32E , Range 39S .
Work Order # 1 , rVen
NICK MILLER , INC.
EXHIBIT A
Eastern Indian River County Township / Sectional Control
Phase 2 (Townships 32 & 33 South , Range 39 East)
Scope of Services , Fee Schedule
man hour estimate
Scope of Services :
1 . Obtain all pertinent Certified Corner Records , Government Land Office plats , field notes
and Instructions to the Surveyor for the project area .
2 . Print available imagery to include DOQQ 's and Indian River County Property Appraiser
digital orthophotos .
3 . Prepare overviews of the two townships within the project area to include preparation of
an ArcGIS geodatabase , map exhibits and reports . The overviews will contain known
information about individual section and quarter section corners . Mapping exhibits will
also be delivered in AutoCAD format .
4 . Review each of the townships with the Indian River County Surveyor and update the
township overviews based on comments and information received .
5 . Prepare a presentation outlining the benefits of the project to the local surveying
community . Draft announcements and advertisements as needed . Arrange and conduct
a forum with all willing local surveyors to discuss the project and their knowledge of
section and quarter section corners within or pertinent to the project area .
6 . Perform field reconnaissance in the townships to determine the extent of existing
monuments near the section and quarter section corner positions — approximately 235
locations . The extent of reconnaissance will be balanced based on the consultant's
understanding of the relative importance of the corners involved . Thus , some searches
may be very thorough while others are more or less cursory .
7 . References will be established for all found monuments and sketches will be prepared .
Monuments will be positioned with a mapping grade ( 1 to 3 meter relative positioning ,
more or less ) GPS receiver for quick recovery and planning purposes . GPS survey
observation diagrams will also be prepared at this time .
8 . Plan and execute a horizontal control survey using static GPS survey techniques to
locate all monuments recovered during the field reconnaissance mission . The control
survey will achieve a relative positional accuracy of 1 . 5 centimeters .
9 . Scan and link previously mapped Murphy Act deeds to existing GIS database .
10 . Update the geodatabase and township overview maps and reports based on the
research , discussions , meetings , reconnaissance and observations outlined herein .
11 . Prepare a report summarizing the status of the section and quarter section corners .
Status information to include , "found " , " missing " , physical characteristics of monuments ,
lineage and recommendations regarding acceptance and/or further investigation .
>F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp. 33-39 32-39 Nick Miller- IRC
W0# 1 8-09-05 -mob.doc
•Page 6 of 6 OEM ARM44449.
Surveying and Mapping the Township (s) and interior sections of F
Township 33E , Range 39S AND Township 32E , Range 39S . ��
MI
Work Order # 1 IOWA ,„ .
EXHIBIT A (�Cont� NICK MILLER , I N C .
FEE SCHEDULE
Eastern Indian River County Township/Sectional Control Survey Contract/project 0504
OFFICE:
Director / P . S .M. : $ 130 .00
Project Manager / P . S . M . : $ 115 .00
Graduate Surveyor/Assistant Project Manager: $95 . 00
Survey Technician (Cadd/Processing) : $70 . 00
Geodetic Processing : $ 90.00
Administrative assistant (Re-Search - Clerical) : $45 . 00
FIELD:
Supervisor: $ 100 .00
3 -man survey crew (includes GPS) : $ 120.00
2-man survey crew (includes GPS) : $ 100.00
Crew Chief: $ 50 . 00
ANTICIPATED REIMBURSABLE EXPENSES:
3 - 1 /2” Imprinted Aluminum Disk for use in concrete monuments $ 12 . 00
Pre-Cast Concrete Monument (24-inch) $9 . 00
Pre-Cast Concrete Monument (36-inch) $ 13 . 00
Pour-in-place Concrete Monument $ 50 . 00
Blueprints/Large Format Copies (per page) $ 1 . 00
Research/Consultation with Other Surveyors * $ 75 . 00 - $ 100 . 00
*This is the fee charged by the other surveyor for researching his/her survey records . This is only an estimate as
Nick Miller, Inc . cannot quote fees for other businesses .
All fees are per hour unless otherwise noted.
eact: TownshkY12
9actiorW CaMrd Phase 1
t t• • Ma 2006 SG
WWI! bill"
eek PSM PM lotoillilor Tech hoc" Gar Swer Crew Crew Chlst RWM! TotaM
w
P"O"WWRSL"NVW now 44
AAM Info " vommm
womaan4NG*Mfo
Jul WA Wit I
umuoftrdellum am
lul Zia 4U
ar51 15
nwwwwww 1EM ========M
Thai 11100111101 wwwwwwwwwT wwwwwww7 .. -<,.
RaM 130 11570 50 45 100 120 100 50
wwwwwwwwwonamw
POW" 0 26680 3T 15480 10800 0 0 0 70000 0 t
Nolaw 1 . Reimtsrsabla urKbr 'Moatingswith Local Sumyonw is for Ma local surveyor's tees.
>F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp. 33 -39 32-39 Nick Miller-IRC
W0# 1 8-09-05-mob.doc