MODIFICATION TO
CONTRACT FOR CONSTRUCTION OF REQUIRED SIDEWALK
IMPROVEMENTS
NO . SD-03 -07 -18SIDE/PL5 (2001050202-46471 )
THIS MODIFICATION , made and entered into this 11th day of July , 2006 ,
by and between Indian River Associates II , LLLP , a Florida limited liability
limited partnership , hereinafter referred to as " Developer" , and INDIAN RIVER
COUNTY, a political subdivision of the State of Florida , by and through its Board
of County Commissioners , hereinafter referred to as "County" .
WITNESSETH :
WHEREAS , the final plat for Falcon Trace Plat Five was approved by the
Board of County Commissioners of Indian River County on July 12 , 2005 ; and
WHEREAS , Developer entered into a Contract for Construction of
Required Sidewalk Improvements No . SD-03-07- 18-SIDE/PL5 (2001050202-
46471 ) guaranteeing the completion of required sidewalk improvements by July
12 , 2007 ; and
WHEREAS , the plat has not yet been recorded because no security
guaranteeing completion of the improvement is in place ; and
WHEREAS , on June 20 , 2006 the Board of County Commissioners
approved a 6-month extension for completion of required improvements (other
than sidewalks ) conditioned on all bonding being in place by July 12 , 2006 ; and
WHEREAS , the amount required to complete the sidewalk improvements
has been increased (due to a rise in materials) as evidenced by an updated cost
estimate , attached as Exhibit "A" ,
NOW, THEREFORE , IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as
follows :
1 . The amount required to guarantee the completion of the sidewalk
improvements is increased to $ 53 , 868 . 75.
2 . The security (a Bank of America , N .A. Irrevocable Standby Letter of
Credit) in the amount of $53 , 868 . 75 has been in place since July 7 , 2006 and
has an expiration date of October 12 , 2007 .
3 . All other terms set out in the Contract for Construction of Required
Sidewalk Improvements No. SD-03-07- 18-SIDE/PL5 (2001050202-46471 )
remain in full force and effect.
4
IN WITNESS WHEREOF , the parties hereto have set their hands and
seals on the day and year first above written .
INDIAN RIVER ASSOCIATES II , LLLP ,
a Florida limited liability limited
partnership
By: INDIAN RIVER II CORPORATION ,
a Florida corporation
GENERALPARTNER
By: la i �C
N-.-Ka ria enen
Vice President
INDIAN RIVER COUNTY, FLORIDA
by and through its Board of County
Commissioners
B G?)L L'-u'
Arthur R . Neu erger, Chail
approved : July 11 , 2006
ATTEST: J . K . Barton , Clerk of Court
By:
Deputy ClerVe/ J . Glenn
APPROVED AS TO FORM AND
LEGAL SUFFICIENC ) 1 11
� . William G . Collins II
County Attorney
2
F:\Attorney\Nancy\DOCS\PLAN\MODIFICATON K falcon trace 5 side.doc
0
FALCON TRACE - PLAT 5
SIDEWALK COST ESTIMATE
I , Scott B . McGuire , a Florida Registered Engineer, License No . 39573 , do hereby certify to Indian River County that a cost
estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the total
cost estimated for said improvements is $38 , 817 . 19. This estimate has been prepared , in part, to induce approval by the
County of a final plat approval for Falcon Trace Plat 5, and for the purpose of establishing proper surety amounts associated
they itht�
< < 39573
Scott 9 . McGui , P. E. FL Reg . No .
UNIT
ITEM # : DESCRIPTION : UNIT : QTY: PRICE : TOTAL :
PLAT 5: ON-SITE SIDEWALK
1 5' Sidewalk (In front of houses) SF 8 ,450 $ 5 . 10 $ 432095.00
ON-SITE TOTAL: $ 43, 095.00
TOTAL CONSTRUCTION COST $43, 095. 00
PLAT 5 = BOND AMOUNT:
(125% of Tota► Const Cost) $53t868, 75
it l5 CI
Falcon Trace Plat Five
17
—�
SECOND
MODIFICATION TO
CONTRACT FOR CONSTRUCTION OF REQUIRED IMPROVEMENTS
NO . SD -03-07 -18CFC/PL5 (2001050202 -46471 )
THIS SECOND MODIFICATION , made and entered into this 11th day of
July , 2006 , by and between Indian River Associates II , LLLP , a Florida limited
liability limited partnership , hereinafter referred to as " Developer" , and INDIAN
RIVER COUNTY , a political subdivision of the State of Florida , by and through its
Board of County Commissioners , hereinafter referred to as "County" .
WITNESSETH :
WHEREAS , the final plat for Falcon Trace Plat Five was approved by the
Board of County Commissioners of Indian River County on July 12 , 2005 ; and
WHEREAS , Developer entered into a Contract for Construction of
Required Improvements No . SD-03-07- 18-CFC/PL5 (2001050202-46471 )
guaranteeing the completion of certain required improvements by July 12 , 2006 ;
and
WHEREAS , the Board of County Commissioners approved a Modification
to Contract for Construction of Required Improvements No . SD-03-07- 18-
CFC/PL5 (2001050202-46471 ) extending the date to complete the required
improvements to January 12 , 2007 so long as the required security guaranteeing
the required improvements was in place by July 12 , 2006 ; and
WHEREAS , some but not all required improvements are completed ; and
WHEREAS , the amount required to complete the required improvements
has been reduced to $421 , 344 . 76 as evidenced by an updated cost estimate ,
attached as Exhibit "A'; and
WHEREAS , on July 7 , 2006 Developer posted a Bank of America
irrevocable letter of credit in the amount of $421 , 344 . 76 to guarantee completion
of those remaining required improvements , with the irrevocable letter of credit
having an expiration date of April 12 , 2007 ,
NOW, THEREFORE , IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as
follows :
d
1 . The amount required to guarantee the completion of the remaining
required improvements is reduced to $421 , 344 . 76 .
2 . The security (a Bank of America , N .A. Irrevocable Standby Letter of
Credit) in the amount of $421 , 344 . 76 has been in place since July 7 , 2006 and
has an expiration date of April 12 , 2007 .
3 . All other terms set out in the Contract for ConstructionofRequired
Improvements No. SD-03-07- 18-CFC/PL5 (2001050202-46471 ) , as modified ,
remain in full force and effect.
IN WITNESS WHEREOF , the parties hereto have set their hands and
seals on the day and year first above written .
INDIAN RIVER ASSOCIATES II , LLLP ,
a Florida limited liability limited
partnership
By: INDIAN RIVER II CORPORATION ,
a Flor' corporation
GENERAL PARTNER
gy.
WfvWia Me fez
Vice President
INDIAN RIVER COUNTY, FLORIDA
by and through its Board of County
Commissioners
By
Arthur R . Neube e , Chairma
approved : July 11 , 2006
ATTEST: J . K. Barton , Clerk of Court
By:
Deputy Clerkft/ d, Glenn
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY .
BYVJ
William G . Collins II
\ . County Attorney
2
F:\Attorney\Nancy\DOCS\PLAN\MODIFICATON2 K falcon trace 5.doc
FALCON TRACE - PLAT 5
COST ESTIMATE
I, Scott B. McGuire, a Florida Registered Engineer, License No. 39573, do hereby certify to Indian River County that a cost
estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the total cost
esti te1tl for saitl improvements is $421 ,344.76. This estimate has been prepared, in part, to induce approval by the County of a
f plat pproval for Falcon hate Plat 5,
and for the purpose of establishing proper surety amounts associated therewith.
39573 7 , 3 . 0 (C
ScdICB. WOU4, P.E. FL Reg. No.
UNIT %,
ITEM #: _ - DESCRIPTION: UNIT: QTY: PRICE: TOTAL: Remain Total
PLAT 5 '
1 Earthwork
Clear, grub, chip and haul onsite LS 1 S 73,500.00 $73,500.00 10% $ 7,350.00
Strip topsoil CY 20,300 $ 0.95 $19,285.00 10% $ 1 ,928.50
Excavate lakes CY 0 $ 0.50 $0.00 10% $
Haul, spread, and compact CY 60,240 $ 1 .53 $92, 167.20 10% $ 9,216.72
Import fill, haul, and compact CY 22,500 $ 6.45 $145,125.00 10% $ 14,512.50
Grade Site LS 1 $ 5,400.00 $5,400.00 10% $ 540.00
Sod lake banks / L.M.E. SF 0 $ 0.27 $0.00 10% $
Sod rear-yard swales SF 34,950 $ 0.27 $9,436.50 10% $ 943.65
Earthwork Subtotal: $344,913.70 $ 34491 .37
2 Water
6" PVC WATERMAIN LF 1 ,39000 $ 12.00 $ 16,680.00 20% $ 3336.00
6" DIP WATERMAIN LF 300.0) $ 17.50 $ 5,250.00 20% $ 1 ,050.00
GATE VALVEBOX 6" EA 3.00 $ 745.00 $ 2,235.00 20% $ 447.00
FIRE HYDRANT/GV/ASSY EA 3.00 $ 2,600.00 $ 7,800.00 20% $ 1 ,560.00
HYDRANT BOLLARDS EA 3.00 $ 270.00 $ 810.00 20% $ 162.00
SAMPLE POINTS EA 2.00 $ 115.00 $ 230,00 20% $ 46.00 ,^ V
WM MJ FITTINGS LS 0.16 $ 58,250.00 $ 9,320.00 200/6 $ 1 ,864.00v
BLOWOFF ASSEMBLY EA 1 .00 $ 465.00 $ 465.00 20% $ 93.00
SINGLE SERVICE EA 7.00 $ 540.00 $ 3,780.00 20% $ 756.00
DOUBLE SERVICE EA 24.00 $ 810.00 $ 19,440.00 20% $ 3,888.00
CONN TO EX WM STUB EA 1 .00 $ 4,700.00 $ 4,700.00 20% 1 $ 940.00 f
TEMPORARY JUMPER CONNECTION EA 1 .00 $ 655.00 $ 655.00 20% $ 131 .00
FLUSHING POINT EA 1 .00 $ 0900.00 $ 6,900,00 20% $ 1 ,380.00
WATERMAIN TESTING LF 1 ,690.00 $ 1 .80 $ 3,042.00 20% $ 608.40
Water Subtotal: $ 81 ,307.00 $ 16,261 .40
3 Sanitary Sower
B" PVC SDR35 0-6 CUT LF 398.00 $ 20.00 $ 7,960.00 20% $ 1 ,592.00
B" PVC SDR35 6-8 CUT LF 493.00 $ 21 .00 $ 10,353.00 20% $ 2,070.60
B" PVCSDR35 8-10 CUT LF 628.00 $ 23.00 S 14,444.00 20% $ 2,888.80
W PVC SDR3510-12CUT LF 53.00 $ 32.00 $ 1 ,696.00 200/6 $ 339.20
MANHOLE 0-6 CUT EA 1 1 .00 $ 1 ,970.00 1 $ 1 ,970.00 20% $ 394.00
MANHOLE 6-8 CUT EA 2.00 $ 2,250.00 $ 4,500.00 20% $ 900.00 (�
MANHOLE 8-10 CUT EA 2.00 $ 2,51000 $ 5,020.00 20% $ 1 ,004.00 1oY7
MANHOLE COATING VF 42.00 $ 29.00 $ 1 ,218.00 20% $ 243,60 1�
SINGLE PVC SERVICE EA .00 $ 445.00 $ 2,670.00 20% $ 534.00
DOUBLE PVC SERVICE EA 255.00 $ 495.00 $ 72,375.00 20% $ 2,475.00
SEWER LATERALM/M CONFLICT EA 4.00 $ 237.00 $ 948.00 20% $ 189.60
LATERAL MARKERS EA 31 .00 $ 20.00 S 620.00 20% $ 12400
SANITARY SEWER TESTING LF 1 ,572.00 $ 0.75 S 1 , 179.00 20% $ 235.80
TV TEST SEWER MAIN ONETIME LF 1 ,572.00 $ 1 .75 $ 2,751 .00 20% $ 550.20
PHASING MANHOLE CONNECTION EA 1 .00 $ 3,500.00 S 3,500.00 20% $ 700.00
Sanitary Sewer Subtotal: S 71204.00 $ 14,240.80
4 _ Paving
Stabilized Sub rade SY 5,657 $ 5.00 $ 28,285.00 5% $ 11414.25
8" Shellrock Base BY 4,458 $ 11 .50 $ 57 ,267.00 700% $ 51 ,267.00
10" Shellrock Base SY 0 $ 17.00 $ 100% $
Prime and Sand BY 4,458 $ 0.40 $ 1 ,783.20 100% It 1 ,783.20
1" Type S-III As halt 1st Lift) BY 4,458 $ 4.37 $ 19,481 .46 100% $ 19,481 .46
3/4" Type S-III Asphalt 2nd Lift BY 4,458 $ 3.28 $ 14,622.24 100% $ 14,622.24
Type "F" Curb and Gutter LF 0 $ 10.45 $ 100% $
Type "D" Curb LF 0 $ 13.15 $ 100% $
Header Curb LF 0 $ 22.00 $ 100% $
Miami Curb with Curb Pad LF 3,597 $ 10.70 $ 38,487.90 100% $ 38,487.90
Striping and Si nae LS 1 $ 500.00 1 $ 500.00 100% $ 50000
Final Grade R.O.W. BY 4,458 $ 0.40 $ 1 ,783.20 100% S 1 ,783.20
Sod along curbs SF 7,194 $ 0.27 $ 1 ,942.38 100% $ 7 ,942.38
Sod along sidewalks SF 6,760 $ 0.27 $ 1 ,825.20 t00% $ 1 ,825.20
Paving Subtotal: $ 159,977.58 $ 133,106.83
5 Storm Drainage
PVC 12° LF 608.00 $ 26.50 $ 16, 112.00 30% $ 4,833.60
1 '
YA. p of 2 7/3/2006
FALCON TRACE - PLAT 5
COST ESTIMATE
RCP 18" LF 71 .00 $ 39.50 $ 2,804.50 30% $ 841 .35
RCP 24" LF 952.00 $ 51 .00 S 48,552.00 30% $ 14,565.60
CMP 24" LF 60.00 $ 46.00 $ 2,760.00 30% $ 828.00
RCP 30" LF 499.00 $ 65,00 3 32,435.00 30% $ 9,730.50
TYPE C INLET EA 4.00 $ 1 ,990.00 $ 7,960.00 30% $ 2,388.00
TYPE D INLET EA 1 .00 $ 2,780.00 $ 2,780.00 30% $ 834.00
MIAMI CURB INLET EA 9.00 $ 2,640.00 $ 23,760.00 30% $ 7, 128.00
TYPE E CONTROL STRUCTURE EA 1 .00 $ 5,200.00 $ 5,200.00 30% $ 1 ,560.00
CONC COLLAR 24" EA 3.00 $ 1 ,500.00 $ 4,500.00 30% $ 1 ,350.00
CLEAN DRAINAGE STRUCTURES EA 15.00 $ 300.00 $ 4,500.00 30% $ 1 ,350.00
Storm Drainatie Subtotal: $ 151 ,363.50 $ 45,409.05
6 Survey
PRMs LS 1 $ 2,200.00 S 2,200.00 100% $ 2,200.00
PCPs LS 1 $ 1 ,000.00 S 1 .000.00 100% $ 1 ,000.00
Lot and Tract comers LS 1 $ 4,060.00 S 4,060.00 100% $ 4,060.00
As-Built Survey LS 1 $ 5,000.00 S 5,000.00 100% $ 5,000.00
Survey Subtotal: $ 12,260.00 $ 12,260.00
7 Engineering and Testing LS 1 $ 10,000.00 $ 10000.00 30% $ 3,000.00
8 Landscaping 2,115 LF of Berm
Canoov Trees - 10 Ft. Hei ht
Quercus virgtniana / Live Oak EA 38 $ 200.00 S 7.600.00 100% $ 7,600.00
Platanus occidentalis I Sycamore EA 37 $ 200.00 S 7,400.00 100% $ 7,400.00
UndeWo Trees - 5 Ft. Height a^
La erstroemia indica I Craps MyTie EA 10 $ 120.00 S 1 ,200.00 100% S 1 ,200.00
Mynca centers / Wax Myrtle EA 10 $ 120.00 S 1 ,200.00 100% $ 1 ,200.00 CY
Li ustrum 'a onicum / Japanese Privet EA 10 $ 120.00 S 1 ,200.00 100% $ 1 ,200.00
ShNbs - 24- Height
Nephmlepis ezaltata Ximberly Queen'/
Smrd Fem EA 75 $ 8.00 $ 600.00 100% $ 600.00
Tn sacum flondana / Gama Grass EA 75 $ 8.00 S 600.00 100% $ 600.00
Jasminum volubile / Wax Jasmine EA 75 $ 8.00 $ 600.00 100% $ 600.00
Viburnum obovatum / Walters Viburnum EA 75 $ 8.00 S 600.00 100% $ 600.00
Mulch LF 2,115 $ 4.38 S 9,263.70 100% $ 9,263.70
Sod Installation LF 2,115 $ 7.00 S 14,805.00 100% $ 14,805.00
Landscaping Subtotal: $ 45,068.70 $ 45,068.70
9 Slreetli hts - FPL Standard No Charge) EA 8 $ 1 ,200.00 $ 9,600.00 100% $ 9,600.00
Electrical LS 1 $ 13,637.66 $ 13,637.66 100% $ 13,637.66
10 Mobilization / De-mobilization One Time) LS 1 $ 101000.00 $ 10,000.00 100% $ 10,000.00
TOTAL: $ 895 694.48 $ 337 075.81
PLAT 5 - BOND AMOUNT
(125% of Total Const. Cost) $1, 119, 618. 10 $ 421.344.76
/vIOL
/14J4
.__
2 of 2 7/3/2006
Falcon Trace Plat Six
07
MODIFICATION TO
CONTRACT FOR CONSTRUCTION OF REQUIRED SIDEWALK
IMPROVEMENTS
NO. SD-03 -07-18-SIDE/PL6 (2001050202 -46473 )
THIS MODIFICATION , made and entered into this 11th day of July , 2006 ,
by and between Indian River Associates Il , LLLP , a Florida limited liability
limited partnership , hereinafter referred to as "Developer" , and INDIAN RIVER
COUNTY, a political subdivision of the State of Florida , by and through its Board
of County Commissioners , hereinafter referred to as "County" .
WITNESSETH :
WHEREAS , the final plat for Falcon Trace Plat Six was approved by the
Board of County Commissioners of Indian River County on July 12 , 2005 ; and
WHEREAS , Developer entered into a Contract for Construction of
Required Sidewalk Improvements No . SD-03-07- 18-SIDE/PL6 (2001050202-
46473) guaranteeing the completion of required sidewalk improvements by July
12 , 2007 ; and
WHEREAS , the plat has not yet been recorded because no security
guaranteeing completion of the improvement is in place ; and
WHEREAS, on June 20 , 2006 the Board of County Commissioners
approved a 6-month extension for completion of required improvements (other
than sidewalks) conditioned on all bonding being in place by July 12 , 2006 ; and
WHEREAS , the amount required to complete the sidewalk improvements
has been increased (due to a rise in materials) as evidenced by an updated cost
estimate , attached as Exhibit "A" ,
NOW, THEREFORE , IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as
follows :
1 . The amount required to guarantee the completion of the sidewalk
improvements is increased to $52 , 545 . 94 .
2 . The security (a Bank of America , N .A. Irrevocable Standby Letter of
Credit) in the amount of $52 , 545. 94 has been in place since July 7 , 2006 and
has an expiration date of October 12 , 2007 .
3 . All other terms set out in the Contract for Construction of Required
Sidewalk Improvements No. SD-03-07- 18-SIDE/PL6 (2001050202-46473 )
remain in full force and effect.
0
IN WITNESS WHEREOF , the parties hereto have set their hands and
seals on the day and year first above written .
INDIAN RIVER ASSOCIATES ll , LLLP ,
a Florida limited liability limited
partnership
By : INDIAN RIVER II CORPORATION ,
a Florida-corporation
GENERALPARTNER
NQ�aria'MmTzF6nde
Vice President
INDIAN RIVER COUNTY, FLORIDA
by and through its Board of County
Commissioners
By /
Arthur R . Neub r er, Chair0a
approved : July 11 , 2006
ATTEST : J . K. Barton , Clerk of Court
By:
Deputy CI • urrrr
APPROVED AS TO FORM AND
LEGAL $ UFFICIEN Y- 1 q
William G . Collins II
County Attorney
2
F:\Attorney\Nancy\DOCS\PLAN\MODIFICATON K falcon trace 6 side.doc
:Q
FALCON TRACE - PLAT 6
COST ESTIMATE
I , Scott B. McGuire , a Florida Registered Engineer, License No. 39573 , do hereby certify to Indian River County that a cost
estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the total
costt estimated for said improvements is $36, 060. 94. This estimate has been prepared , in part, to induce approval by the County
of a find plat approval for Falcon Trace Plat 6, and for the purpose of establishing proper surety amounts associated therewith .
L
73 7 . 3 . 06
Silo B . Mc re, P. E. FL Reg . No.
UNIT
ITEM. #: "DESCRIPTION : UNIT : QTY: PRICE : TOTAL :
PLAT 6 O&SITE
4 Paving
5' Sidewalk ( In front of houses) SF 71850 $ 5. 10 $ 40, 035. 00
ON-SITE TOTAL : $ 40, 035. 00
Contingency (5%) $ 2, 001. 75
TOTAL CONSTRUCTION COST $42, 036. 75
PLAT 6 - BOND AMOUNT:
(125% of Total Const. Cost) $52o545. 94
7/3/66
w y i A
f A
q Falcon Trace Plat Six
SECOND
MODIFICATION TO
CONTRACT FOR CONSTRUCTION OF REQUIRED IMPROVEMENTS
NO . SD-03 -07 -18CFC/PL6 (2001050202 -46473)
THIS SECOND MODIFICATION , made and entered into this 11th day of
July, 2006 , by and between Indian River Associates II , LLLP , a Florida limited
liability limited partnership, hereinafter referred to as " Developer" , and INDIAN
RIVER COUNTY , a political subdivision of the State of Florida , by and through its
Board of County Commissioners , hereinafter referred to as "County" .
WITNESSETH :
WHEREAS , the final plat for Falcon Trace Plat Six was approved by the
Board of County Commissioners of Indian River County on July 12 , 2005 ; and
WHEREAS , Developer entered into a Contract for Construction of
Required Improvements No . SD-03-07- 18-CFC/PL6 (2001050202-46473 )
guaranteeing the completion of certain required improvements by July 12 , 2006 ;
and
WHEREAS , the Board of County Commissioners approved a Modification
to Contract for Construction of Required Improvements No . SD-03-07- 18-
CFC/PL6 (2001050202-46473 ) extending the date to complete the required
improvements to January 12 , 2007 so long as the required security guaranteeing
the required improvements was in place by July 12 , 2006 ; and
WHEREAS , some but not all required improvements are completed ; and
WHEREAS , the amount required to complete the required improvements
has been reduced to $439 , 652 . 35 as evidenced by an updated cost estimate ,
attached as Exhibit "A"; and
WHEREAS , on July 7 , 2006 Developer posted a Bank of America
irrevocable letter of credit in the amount of $439 ,652 . 35 to guarantee completion
of those remaining required improvements , with the irrevocable letter of credit
having an expiration date of April 12 , 2007 ,
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as
follows :
1 . The amount required to guarantee the completion of the remaining
required improvements is reduced to $439 , 652 . 35 .
2 . The security (a Bank of America , N . A . Irrevocable Standby Letter of
Credit) in the amount of $439 , 652 . 35 has been in place since July 7 , 2006 and
has an expiration date of April 12 , 2007 .
3 . All other terms set out in the Contract for Construction of Required
Improvements No. SD-03-07- 18-CFC/PL6 (2001050202-46473 ) , as modified ,
remain in full force and effect.
IN WITNESS WHEREOF , the parties hereto have set their hands and
seals on the day and year first above written .
INDIAN RIVER ASSOCIATES II , LLLP ,
a Florida limited liability limited
partnership
By: INDIAN RIVER II CORPORATION ,
a Florida corporation
By.7ENERALPARTNER
/ 1 L2kyj C
N . 'a �
Vice President
INDIAN RIVER COUNTY, FLORIDA
by and through its Board of County
Commissioners
ByO, cop_
Arthur R. Neu rger, Chair a
approved : July 11 , 2006
ATTEST : J . K . Barton , Clerk of Court
By:
Deput CIEM/ J . tale
APPROVED AS TO FORM AND ,-
LEGAL SdUFFICI�fyC fYl
By I r l �9 f !t
William G . Collins II
County Attorney
2
F:\Attorney\Nancy\DOCS\PLAN\MODIFICATON2 K falcon trace 6.doc
r
Q
FALCON TRACE - PLAT 6
COST ESTIMATE
I, Scott S. McGuire, a Florida Registered Engineer, License No. 39573, do hereby certify to Indian River County that a cost
estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the
total cost estimated for said improvements is $439,652.35. This estimate has been prepared, in part, to induce approval by
the Cou ,of a final plat appri for Falcon Trace Plat 6, and for the purpose of establishing proper surety amounts
ass ated therewdh.
39573 •0 �p
Scff B. McGuire, PrE FL Reg. No.
UNIT 010
ITEM #: DESCRIPTION: UNIT: QTY: PRICE: TOTAL: Remain Total
PLAT 6
1 Earthwork
Clear, grub, chi antl haul offsite LS 1 $ 73,500.00 $73,500.00 10% $ 7,350.00
Strip topsoil CY 21 ,400 $ 0.95 $20,330.00 10% $ 2,033.00
Excavate lakes CY 0 $ 0.50 $0.00 10% $
Haul, spread, and compact CV 70,280 $ 1 .53 $107,528.40 10% $ 10,752.84
Import fill, haul, and compact CY 26,300 $ 6.45 $169,635.00 10% $ 16,963.50
Grade Site LS 1 $ 5,400.00 $5.400.00 10% $ 540.00
Sod lake banks / L.M.E. SF 0 $ 0.27 $0.00 10% $
Sod rear-yard swales SF 33,600 $ 0.27 $9,072.00 10% $ 907.20
Earthwork Subtotal: $385,465.40 $ 38,548.54
2 Water
6" PVC WATERMAIN LF 1 ,630.00 $ 1200. $ 19,560.00 20% $ 3,912.00
6" DIP WATERMAIN LF 380.00 -$-17 50 $ 6,650.00 20% $ 1 ,330.00
8" PVC WATERMAIN LF 230.00 $ 16.00 $ 3,680.00 20% $ 736.00
GATE VALVE/BOX 6" EA 2.00 $ 745.00 $ 1490.00 20% $ 298.00
GATE VALVE/BOX 8" EA 1 .00 $ 1 ,080.00 $ 1 ,080.00 20% $ 216.00
FIRE HYDRANT/GV/ASSY EA 3.00 $ 2,600.00 $ 7,800.00 20% $ 1 ,560.00
HYDRANT BOLLARDS EA 3.00 $ 270.00 $ 810.00 1 20% $ 162.00
SAMPLE POINTS EA 3.00 $ 115.00 $ 345.00 1 207/6--- $ 69.00
BL MJ FITTINGS LS 0.16 $ 58,250.00 $ 9,320.00 20% $ 1 ,864.00 I �W
BLOWOFF ASSEMBLY EA 1 .00 $ 465.00 $ 465.00 20% -$-93 00
SINGLE SERVICE EA 5.00 $ 540.00 $Wil2,700.00 20% $ 540.00 /J
DOUBLE SERVICE EA 28.00 $ 810.00 $ 22,680.00 2016 4,536.00 G/
CONN TO EX Wily STUB EA 1 .00 $ 4,700.00 $ 4,700.00 20% $ 940.00
TEMPORARY JUMPER CONNECTION EA 1 .00 $ 655.00 $ 655.00 20% $ 131 .00
FLUSHING POINT EA 1 .00 1 $ 6,900.00 $ 6,900.00 20% $ 1 ,380.00
WATERMAIN TESTING LF 2,240.00 $ 1 .80 $ 4,032.00 20% 1 $ 80640
Water Subtotal: $ 92867.00 $ 18,573.40
3 Sanitary Sewer
8" PVC SDR35 0-6 CUT LF 528.00 $ 20.00 $ 10,560.00 20% $ 2, 112.00
8" PVC SDR35 6-8 CUT LF 498.00 $ 21 .00 $ 10,458.00 200% $ 2,091 .60
8" PVC SDR35 B-10 CUT LF -3-5-5 0-0 T---23 00 $ 8,165.00 26% $ 1 ,633.00
8" PVC SDR35 10-12 CUT LF -7-91 0-0 $ 32.00 $ 12,512.00 20% $ 2,502.40
8" PVC SDR35 12-14 CUT LF 21 .00 $ 40.00 It 840.00 20% $ 168.00
MANHOLE -6 CUT EA 2.00 $ 1 ,970.00 $ 3,940.00 20% $ 788.00
6 I I
MANHOLE s-8 CUT EA 4.00 $ 2,250.00 $ 9,000.00 20% $ 1 ,800.00
MANHOLE 1-10 CUT EA 1 ,00 1 $ 2,510.00 $ 2,510.00 20% $ 502.00
MANHOLE 10-12 CUT EA 1 .00 $ 2,850.00 $ 2,850.00 20% $ 570.00
MANHOLE COATING VF 66.00 $ 2900 $ 1 ,914.00 20% $ 382.80
SINGLE PVC SERVICE EA 10.00 $ 445.00 $ 4,450.00 20% $ 890.00
DOUBLE PVC SERVICE EA 24.00 $ 495.00 $ 11 ,880.00 2094 $ 2,376.00
SEWER LATERAL/WM CONFLICT EA 3.00 $ 237.00 $ 711 .00 20% $ 142.20
LATERAL MARKERS EA 34.00 $ 20.00 $ 680.00 200% $ 136.00
SANITARY SEWER TESTING LF 1 ,795.00 $ 0.75 $ 1 ,346.25 20% ' -$ -26915 269.25
TV TEST SEWER MAIN ONETIME LF 1 ,795.00 $ 1 .75 $ 3,141 .25 20% $ 628.25
PHASING MANHOLE CONNECTION EA 1 .00 $ 3,500.00 $ 3,500.00 20% $ 700.00
Sanity Sewer Subtotal: $ 88,457.50 $ 17,691 .50
4 Paving
Stabilized Sub rade BY 5,651 $ 5.00 $ 28,255.00 50/0 $ 1 ,412.75
8" Shellrock Base BY 4,541 $ 11 .50 $ 52,221 .50 100% $ 52,221 .50
Prime and Sand BY 4,541 1 $ 0.40 $ 1 ,816.40 100% It 1 ,816.40
1" Type S-III Asphalt 1st Lift) BY 4,541 1 $ 4.37 $ 19,844.17 100% $ 19,844. 17
3/4" Type S-III Asphalt 2nd Lift BY 4,541 $ 3.28 $ 14,894.48 -100% $ 14,894.48
Miami Curb with Curb Pad LF 3,326 $ 10.70 $ 35,588.20 100% $ 35,588.20
Striping and Si nae LS 1 -f-500 00 $ 500.00 100% $ 500.00
Final Grade R.O.W. SV 4,541 $ 0.40 $ 1 ,816.40 100% $ 1 ,816.40
Sod along curbs SF 6,652 $ 0.27 $ 1 ,796.04 100% $ 1 ,796.04
Sod along sidewalks SF 6,280 $ 0.27 $ 1 ,695.60 100% $ 1 ,695.60
Paving Subtotal: $158,427.79 $ 131 ,585.54
5 Storm Drainage
V1 i IB 01
t..., 1 of Ira/zoos
r,
FALCON TRACE - PLAT 6
COST ESTIMATE
PVC 12" LF 526.00 $ 26.50 $ 13,939.00 30% $ 4, 181 .70
RCP 18" LF 7000 $ 39.50 $ 2,765.00 30% $ 629.50
RCP 24" LF 979.00 $ 51 .DO $ 49,929.00 30% IS 14,978.70
CMP 24" LF 80.00 $ 46.D0 $ 3,680.00 30% $ 1 , 104.00
TYPE C INLET EA 4.00 $ 1 ,990.DO $ 7,960.00 30% $ 2,388.00
MIAMI CURB INLET EA 9.00 $ 2,64000 $ 23,760.00 30% $ 7,128.00
CONC COLLAR 24" EA 4.00 $ 1 ,500.00 $ 6,000.00 30% $ 1 ,800.00
CLEAN DRAINAGE STRUCTURES EA 13.00 $ 300.00 $ 3,900.00 30% $ 1 , 170.00
Storm Drainage Subtotal: $ 111 ,913.00 $ 33,579.90
6 Surve
PRMs LS 1 $ 800.00 $ 800.00 100% $ 800.00
PCPs LS 1 $ 1 ,000.00 $ 1 ,000.00 100% $ 1 ,000.00
Lot and Tract corners LS 1 $ 5,000.00 $ 5,000.00 100% $ 5,000.00
As-Built Survey LS 1 $ 5,000.00 $ 5,000.00 100% $ 5.000.00
Survey Subtotal: $ 11 ,800.00 1 $ 11 ,800.00
7 Engineering and Testing LS 1 $ 10,000.00 $ 10,000.00 30% $ 3,000.00
8 Landscaping 2185 LF of Berm
Canoov Trees - 10 Ft. Height
Quercus vir iniana / Live Oak EA 39 $ 200.00 $ 7,800.00 100% $ 7,800.00
Platanus occidentalis / Sycamore EA 38 $ 200.00 $ 7,600.00 100% $ 7,600.00
Understow Trees - 5 Fl. Height
La erslmemia indica / Craps Myrtle EA 11 $ 120.00 $ 1 ,320,00 100% $ 1 ,320.00
Myrica centers / Wax Myrtle EA 11 $ 120.00 $ 1 ,320.00 100% $ 1 ,320.00
Li uslrumjaponicum / Japanese Privet EA 10 It 120.00 $ 1 ,200.00 100% $ 1 ,200.00 �
Shrubs - 24" Hei hf (� I!
Nephrolepis exaftata 'Kimberly Queen'/
Sword Fern EA 75 $ 8.00 $ 600.00 100% $ 600.00 /
Tri sacum flondana / Gama Grass EA 75 $ 8.00 $ 600.00 100% $ 600.00
Jasminum volubile / Wax Jasmine EA 75 It 8.00 $ 600.00 100% $ 600.00
Viburnum obovatum / Wafters Viburnum EA 85 $ 800 $ 680.00 100% $ 680.00
Mulch LF 2,185 $ 4.38 $ 9,570.30 100% $ 9,570.30
Sod Installation LF 2,185 $ 7.00 $ 15,295.00 100% $ 15,295.00
Landscaping Subtotal: $ 46,585.30 $ 46 585.30
9 SVeetli hts - FPL Standard No Charge) EA 6 $ 1 ,200.00 IS 7,200.00 100016 $ 7,200.00
Electrical LS 1 $ 13,159.70 $ 13,159.70 100% $ 13159.70
10 Mobilization / De-mobilization One Time LS 1 $ 10,000.00 $ 10,000.00 100% $ 10 000.00
11 Removal of construction enttrance and set-up . LS 1 $ 20,000.00 $ 20,013O.D0 100% 1 $ 20,000.00
TOTAL: $ 942 735.99 $ 351, 721.88
PLAT 6 - BOND AMOUNT
(125% of Total Const. Cost) $1, 178,419.99 $439, 652.35
2 of 2 7/3/2006