Loading...
HomeMy WebLinkAbout2008-270IRC Work Order #7 County Road 512 Ph. 3 — RNV monumentation September 9", 2008 Page 1 of 3 Board of County Commissioners Administration - Building A (South) 180127th Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: 772-778-9391 Project: Old Dixie Highway (North), US1to 69th Street LAP Sidewalk Improvements project Right -of -Way Mapping Indian River County Project 0845 WORK ORDER NO. 3 (Engineering/Surveying) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Morgan Eklund, Inc. In accordance with Contract No. 0725 2007-2009 This Work Order No. 3 is in accordance with the existing AGREEMENT dated November 6th 2007 between Morgan Eklund, Inc. (SURVEYOR) and Indian River County (COUNTY). This Work Order No. 3 amends the agreement as follows: SECTION I — PROJECT LIMITS This Work Order No. 3 is for the SURVEYOR to perform all related field and office Surveying and Mapping services in connection with the Right of Way Mapping of Old Dixie Highway (North) from US1 traveling north to 69th Avenue. Limits include all properties associated with the project. SECTION II - SCOPE OF SERVICES As agreed upon between Morgan Eklund, Inc. and Indian River County, the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No. 3, attached proposal Exhibit A, and Right -of -Way check list Exhibit B. IRC Work Order #2 Morgan Eklund, Inc Old Dixie US1-69`h st RNV Mapping September 9'h, 2008 Page 2 of 3 SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT 1. Project shall be completed as follows: a. Time of 80% - 90% PRELIMINARY review submittal shall be 120 calendar Days from notice to proceed. b. Time of FINAL project completion shall within 30 calendar days of receipt of the County's review comments. 2. Deliverables -The SURVEYOR shall provide the COUNTY: a. PRELIMINARY REVIEW. 80% - 90% product for County review and comments. One (1) paper "hardcopy". County shall strive to provide review comments within 30 calendar days of preliminary submittal. b. FINAL one (2) paper "hardcopy" signed and sealed sets and one (1) signed and sealed MYLAR sets in adequate recording fashion (I. E. Borders). Sheeted and model space (as applicable) AutoCad drawing file and PDF formats on CD. c. Survey set/sheets shall include a cover sheet with location sketch, survey certifications, and related title and project No; a survey notes/legend/abbreviation sheet, survey horizontal control sheet(s), right-of-way plan view sheets and/or as indicated in the County supplied Right -of -Way map "checklist". d. Work Product and digital versions are to prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area, as defined. It shall contain all information necessary for third -party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large. a. The SURVEYOR'S work product shall meet or exceed the minimum standards as defined by Sections II, III and IV or the COUNTY will not approve the SURVEYOR'S request for payment. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described services rendered as identified in Sections I, II, and III of this Work Order No. 3, for a total lump sum fee of $57,320.00. All and/or any additional services not described hereon shall be pre -approved by the COUNTY. Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the SURVEYOR for the contract year(s) of November 6th, 2007 through November 5th, 2009. All invoicing shall include project number (0845), Work Order No. (WO 3), Contract Number (0725), itemize man-hours and materials expended to complete the scope of services. Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services Agreement, contract No: 0725 with the COUNTY and as stated in Section II, III and IV hereon. Remainder of page left blank intentionally IRC Work Order #2 Morgan Eklund, Inc Old Dixie US1-69" st RNV Mapping September 9", 2008 Page 3 of 3 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 9th day of Sept. 2008. OWNER Morgan Eklund, Inc. BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA Sandra L. Bowden;>irman , r Approved byBCC Seer 9, 2008 ATTEVe:.. Jeffrey�I r ertdn,`Ctrk of Circuit Court Deputy Clerk Approved as to Form and Legal Sufficiency: LL, Iliam , COUNTY Attorney (Printed name and • le) CeKH �G..L i✓ l^�(�Sf �� Witnessed by: (Printed name) MORGAN & EKLUND, INC. PROFESSIONAL SURVEY CONSULTANTS August 15, 2008 Indian River County Attn: Mr, Michael O'Brien, P.S.M. 1801 27th Street Vero Beach, Florida 32960 EYU%g%z A RE: Right -Of -Way Location Survey Along Old Dixie Highway from US 1 North to 69" Street (4 miles +± Project Limits: Entire Right -of --Way of Old Dixie Highway from US 1 thru and 100' beyond 69th Street. Includes all side streets, Rights -of --Way, alleys etc. to a minimum of 100' beyond (east and west) of Old Dixie Highway existing Right -of --Way. Dear Mr. O'Brien: Morgan & Eklund, Inc. is pleased to provide you with the following proposal to provide right-of-way mapping for the above -referenced project. Based on the information provided, I understand the scope of work to include the following tasks: • Proect is to (at a minimum) adhere to County Supplied EXIIIBIT "B" Old Dixie Hwy —US Ito 69 Street Indian River County Right -of -Way Map Checklist. • Establish horizontal control network along R/W corridor • Tie baseline control to Florida State Plane Coordinate System, East Zone, NAD 83/99 • Locate block comers, lot comers, and FEC R/R R/W monumentation along right-of-way lines • Location of FEC R/R tracks and edge of pavement of Dixie Highway and 100' on side streets. • Locate buildings and/or major concrete slabs or features of concern within 25' of R/W • Establish centerline of R/W and set nail and disks (or sufficient monumentation) at all Qen'Lerline points of intersection PC's, PI's PT's and side street centerline intersections, interval not to exceed 1,000' • Certified Comer Reports (CCR) shall be created or updated on all found, used and or established Sectional Control throughout the project. • County is to supply any boundary surveys, recorded plats or relevant information helpful to the positioning of the project from County files within 10 days of notice to proceed. • County is to supply a current Title Search of approximately 116 parcels bordering and/or within established limits along the corridor within 30 days of notice to proceed. • The Right -of --Way mapping project shall be prepared in a fashion as to be easily used by the consultant or P parties as base map for any additional Topographic Surveys as determined by the County via separate work order. 8745 U.B. HIGHWAY 1, P.O. BOX 701420, WABASSO, FL 32970-1420 • PHONE: (772) 388-5364 • FAX: (772) 388-3165 • jmorgan®morganeklund.com 1500 B.E. 3rd COURT, SUITE 110, DEERFIELD BEACH, FL 33441 • PHONE: (954) 421-6882 • FAX: (954) 421-0451 • pvoute®morganeklund.com Mr. Michael O'Brien August 15, 2008 Page (2) Deliverables: +, • PRELIMINARY REVIEW. 80% - 90% product for County review and comments. One (1) paper "hardcopy". County shall strive to provide review comments within 30 days of preliminary submittal. • FINAL one (1) paper "hardcopy" signed and sealed sets and one (1) signed and sealed MYLAR sets in adequate recording fashion (I.E. Borders). Sheeted and model space (as applicable) AutoCad drawing file and PDF formats on CD. • Survey settsheets shall include a cover sheet with location sketch, survey certifications, and related title and project No; a survey notes/legend/abbreviation sheet, survey horizontal control sheet(s), right -of --way plan view sheets and/or as indicated in the County supplied Right -of --Way map "checklist'. • Submittals shall be in the form of cover sheet, survey notes and control sheet(s), followed by applicable key sheets and R/W map sheets. Project Schedule. • Time of 80% - 90'/o PRELIMINARY review submittal shall be 120 days from notice to proceed. • Time of FINAL project completion shall within 30 days of receipt of the County's review comments. Morgan & Eklund, Inc. will coordinate with the FEC Railroad for access to the FEC Railroad right-of- way. I. Recover horizontal control; Set traverse control monuments along 4 mile route tied to Florida State Plane Coordinate System (NAD 83/99) Chief Surveyor (P.S.M.) 4 hours @ $120.00/hr .............................. $ 480.00 Project Surveyor 16 hours @ $95.00/hr ............................. $ 19520.00 Three Man RTK Crew 24 hours @ $165.00/hr............................ $ 3,960.00 TotalI....................................................... $ 5,960.00 Mr. Michael O'Brien August 15, 2008 Page (3) He Locate property corners, rtw control, CL control, FEC R/R tracks, CL Mitersections, sidemostreet property control, edge of pavement, buildings within 25' of R/W; set nails and disks along centerline of R/W at a distance not to exceed 10001 Project Surveyor 80 hours @ $95.00/hr ............................. $ 79600.00 Three Man Survey Crew 160 hours @ $125.00/hr.......................... $ 20.000.00 Total II .................................................... $ 27, 600.00 MIS 1�'TiF y� i Mr, 1 4 1 r ui i.y i n 17 74fa 11 111) VI Chief Surveyor (P.S.M.) 24 hours @ $120.00/hr............................ $ 22880.00 Project Surveyor 80 hours @$95.00/hr .............................. $ 7,600.00 Computer Technician 120 hours @$65.00/hr............................ $ 7.800.00 Total IIl.................................................... $ 18,280.00 TOTAL I — Ill .................................................... $ 51,84MV IsaW sum fee Mr. Michael O'Brien August 15, 2008 Page (4) l i /�Iwi i i q ! 1 1 A I 1 1 1 Y�iti 11 II wl t: I :.rl I I 1 ,1 0; 1 1 I f f ,i - I 1: Chief Surveyor (P.S.M.) 24 hours @ $120.OOlhr ............................ $ 29880.00 Computer Technician 40 hours @$65.00/hr. 2 600.00 Total No mew or as evewpowee so* novae*@* 06096000*9 now& 0090040066 $ 5,480.00 TOTALI — IV ...................................................... $ 57,320.00 lwnp sun fee • • 1409, • 41 :• 11 1 a! :11 1 :I w ! i • • • I 11 • ! 1 • 1 1 i l 1 � • 11 • ! 11 !: � � V Pagel of 2 EXHIBIT "B" Old Dixie Hwy - USI to 691h Street INDIAN RIVER COUNTY RIGHT OF WAY MAP CHECKLIST All Right-of-way projects shall adhere to Chapter 177 & 472, F.S. and Chapter 61G17, F.A.C. as minimum and be certified as such. R/W Maps shall be prepared/submitted in the form of a certified R/W Map will all applicable certifications and criteria met. 1. Cover sheet/Key sheet. (To be supplied by IRC in DWG.) 2. Survey notes and report sheet. 3. Key sheet(s) 4. Survey Control sheet. 5. Subsequent R/W map sheets. 6. Supply a Box or area for county acceptance and/or certification. 7. Title Box of each sheet must contain: a. County b. State Road and/or County Road Number C. Designed, drawn and checked by (use names or initials) & date d. Scale e. Field Book References f. Sheet Numbers to be in numerical order (1, 2, 3, 4, etc.) NOT (1, 1A, 1B, 2, etc.) 8. Any notes necessary to set out the type and/or purpose of the map shall be shown. 9. Provide in survey notes - all relevant resources to prepare the Right -of -Way map. 10. Show pertinent dimensions and bearings in the following fashion as the case may be: a. Plat — (P) b. Computed — (C) C. Field — (F) d. Deed (D) 11. Table of Ownerships shall show: a. Parcel Number b. Recording Data 12. Show stations and offsets to all Right of Way Breaks, bends, PC's, PT's, block corners (per plat). 13. Show stations, deflection (or bearing) of all intersecting section, %. section lines to baseline (either field or calculated as applicable). 14. Show monumented baselines and all references thereto. 15. Verify that computed distances and bearings are supported by field measurements. 16. Verify and/or monument significant elements of Baseline alignment shown,(i.e. curves, bearings and P.I. Stations) 17. Ensure that significant elements of all curves are shown and are correct. Also show curve data on all sheets where they appear. 18. Provide stations on the controlling baseline at the beginning, ending of RNV Project, 500' intervals, all w bends, PC's, PT's, PI's. 19. Stationing in field minimum 500' beyond beginning and ending of project. 20. Baseline (equate to intersecting State or County Jobs by Station and job number when available) as available. 21. Projects shall be in NAD83/90 State plane coordinate system and bearings reference shall be shown and must be clearly stated. Values shall be place on key baseline monumentation. 22. County/State lines 23. Section 24, Township 25. Range 26. Government Lots, Grants, etc. F:\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contract\2007-2008 ProjectsWlorgan Eklund\Old Dixie US1-69th St\Old Dixie ROW Survey check list 8-4-08.doc Page 2 of 2 27. Sections and % Sections (lines & corners). 28. Certified Corner reports of all Section and % corners used in the course of survey shall be R completed and/or updated. 29. City Limits by Name & Symbol; Name of City, if job entirely within city limits but does not cross -city limits. 30. Land and Subdivision Ties (angles and/or, bearings & distances) 31. Subdivision name and limits 32. Plat Book and page 33. Lots and Blocks 34. Lot and Street dimensions (plat or document of record). 35. Show all original plat and RMI lines of record, if different from present time, with dashed lines 36. Show/plot all Murphy Reservations and/or release lines (including document of record) via graphic or dimension which ever is obtainable. 37. Show names of subdivision streets, plat book and page recording — also, show Lot and Block number and Dimensions, Exceptions, Easements, and Vacated portions. 38. When property lines break the Right of Way on curve, show tangent bearings or chord bearings. 39. Show any replat of a subdivision — show old subdivision when necessary to clear up former acquisition or old title references — use system of dashed lines, dotted figures, etc., with ties shown and name and plat book reference indicated 40. Stations and Angle Ties to ALL Existing Major and Minor Side Streets (Public Road RAN) as surveyed and/or calculated. 41. Show field located P. R. M. /major property corner or parcel ties by station/offset to baseline/control line. 42. Current Street Names 43. Any buildings within 25 feet of proposed R/W line shall be dimensioned to R/W line. If proposed R/W line is unknown, obtain buildings within +/- 25' of existing R/W. Locations of buildings and large structures can be obtained from field and/or photographic / planimetric methods, note shall be placed on plan as to origin. 44. Show and identify all easements on Detail Maps by width, use and ownership (where applicable). 45. Any other items as to meet the goals and objectives established by the County. (End) F:\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contract\2007-2008 ProjectsNorgan Eklund\Old Dixie US1-69th St\Old Dixie ROW Survey check list 8-4-08.doc