Loading...
HomeMy WebLinkAbout2008-336L IRC Work Order #4 53`0 St Lake Hydro Survey October 7h, 2008 Page 1 of 3 Board of County Commissioners Administration - Building A (South) 1801 27th Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: 772-778-9391 Project: 53`d Street Roadway Improvements Project Lake Hydrographic Surveying and Mapping Indian River County Project 0107 WORK ORDER NO, 4 (Engineering/Surveying) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Morgan Eklund, Inc. In accordance with Contract No, 0725 2007-2009 This Work Order No. 4 is in accordance with the existing AGREEMENT dated November 6', 2007 between Morgan Eklund, Inc. (SURVEYOR) and Indian River County (COUNTY). This Work Order No. 4 amends the agreement as follows: SECTION I — PROJECT LIMITS This Work Order No. 4 is for the SURVEYOR to perform all related field and office surveying and mapping services in connection with the 53`d Street Roadway Improvements Planning and Engineering Design applications. Limits include the two existing lakes north and south of the proposed corridor in the vicinity of 39"' Avenue. SECTION II - SCOPE OF SERVICES As agreed upon between Morgan Eklund, Inc. and Indian River County, the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No. 4, attached proposal Exhibit A. (Cont) .} IRC Work Order #4 53'0 St Lake Hydro Survey October 7th, 2008 Page 2 of 3 SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT I. Project shall be completed as follows: a. 100% submittal shall be 30 calendar Days from notice to proceed. 2. Deliverables -The SURVEYOR shall provide the COUNTY: a. Three (3) 24" X 36" paper signed and sealed "hardcopy". b. Sheeted and model space (as applicable) AutoCad drawing file and PDF formats on CD. c. Work Product and digital versions are to prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area, as defined. It shall contain all information necessary for third -party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large. a. The SURVEYOR'S work product shall meet or exceed the minimum standards as defined by Sections II, III and IV or the COUNTY will not approve the SURVEYOR'S request for payment. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described services rendered as identified in Sections I, II, and III of this Work Order No. 4, for a total lump sum fee of $5,490.00. All and/or any additional services not described hereon shall be pre -approved by the COUNTY. Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the SURVEYOR for the contract year(s) of November 6th, 2007 through November 5th, 2009. All invoicing shall include project number (0107), Work Order No. (WO 4), Contract Number (0725), itemize man-hours and materials expended to complete the scope of services. Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services Agreement, contract No: 0725 with the COUNTY and as stated in Section II, III and IV hereon. Remainder of page left blank intentionally A IRC Work Order #4 53'" St Lake Hydro Survey October 74", 2008 Page 3 of 3 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 14th day of October 2008, OWNER BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA Sandra L. Bowden, Chairman Approved by BCP,, Oct0t r 14, 2008 ATTEST: Jeffrey K. Barton, Clerk of Circuit Court Approved as to Form and Legal Sufficiency: William G. Collins tel COUNTY Attorney Baird, COUNTY Administrator Morgan Eklund, Inc. (Printed name and i ) Witnessed by: (Printed name) ) al C 1 f 1' September 18, 2008 MORGAN & EKLUND, INC PROFESSIONAL SURVEY CONISULTAN"TS ENAu.\i3rr A Indian Diver County Attn: Mr. Michael O'Brien, P.S.M. 1801 27th Street Vera Reach, Florida 32960 RC: 'I'opc>'grrrPhiclBafhymetrir Survey fur Praprrsctl S?r`t Stree! Project Dear Michael: Morgan & Eklund, Inc. is pleased to provide you witti the Iollowing proposal to furnish professional hydrographic survey services for the above -referenced prnject. In accordance with the scope of work, as provided, I estimate our emas to be eas follow: L Field Survey A. Upland Profiles Chief Surveyor (P.S.me) I hour @ S1?0,00Ihr ............................... S 120.00 Three _elan RTIC Crew 8 hours (a) 165.00/lir 1320,00 1.A A00 B. Bathymetric: Survey C'hier Surveyor (11'..R.M.) I hour tom%}$120.0011hr............................... $ 120,00 Project Sunleyor 8 hours @ $9.55,00/hr .. $ 700.00 'T'hrec Man Survey Crew 8 hours @� $127,00/hr .......................>..... $ 1,000.00 8745 U.S. HIGHWAY 1, P,O. BOX 7014202 WA1 A81401 1r1. 32970-1420.PHQME: (772( 388-5364 •IMAX: (7'l tl :3fi1i-31fia+ jEnnr��n(r�mar�neklund.cam 1500 SA,4., 3rd GClliM'. Si ATN' 110, DRERFICLD BEACK Fl. 33441 • P11C1Mi!7: 1!1,5$1) 4)1 I HE11 . 1 AXt (9154% 421-0451 a pvoutci�ilmorganehlundxom Mr. Michael O'Brien September 18, 2008 Page (2) 16' Skiff 1 day, (a; $175.001day .......................... . .. Trimble DEPS System I day C $250.00/day.................. ,.. % 175.00 250.40 Digital Ti`atbonteter 1 day (a), $85,00/day................... .......'fi 85.04 /7390000 7otal]AK L1►4416al00,644\►i►•lr4Pa•►64400►66a11Ii►M\1• S l'voro 11. Data ro.Auctionfdrafting of plan and cros"cctional views, compile digital terrain model, contour map Chief Surveyor (P.SA4.) 2 hours @u $120.001hr ....:...,:_.. ...............Y S 240.40 Project Surveyor 4 hours PrP $95.00/hr . ........$ 380.00 j .......Rf1. Computer Technician 16 hours n $65.001/hr 1..144 ....................... .'� 1,040600 Total ll `` 11660 00 rrpa•ruaauuu uaaa•rrrauuss uai uraa •rasa••.auaaa►ea y7 TOTAL I— Ila .....a........,........................ .S .5,490.00 lump sant,fipe . aaIr , Morgan & Eklund, hie. appreciates this opportunity to work with you and Indian River County on this project. Sincere Jon K. Morgan, 11, Presidenl IRMAini