Loading...
HomeMy WebLinkAbout2008-017T Document G701TM I - 2001 Change Order PROJECT (Name and address): New County Administration Building Lying Between the Main Relief Canal to the North. the Lateral D Canal on the Sounth and East and 20th Avenue to the West TO CONTRACTOR (Name and address): Turner Construction Company 800 N. Magnolia Avenue Orlando, Florida 32803 CHANGE ORDER NUMBER: 035 DATE: January 15. 2008 ARCHITECT'S PROJECT NUMBER: 2102 CONTRACT DATE: (Amendment # 2) August 23, 2005 CONTRACT FOR: Guaranteed Maximum Price - Constmction Manager at Risk OWNER:® ARCHITECT: CONTRACTOR: FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable m previously executed Construction Change Directives) COR 116 Description Amount PCO No. 032 Item 001 Release Hold Allowance for Brick Pavers and Sidewalks $23,778 002 Remove Temporary Sidewalks, add fill and sod replacement ($4,553) 003 Remove Existing Pedestian Ramp/Curb cut & repalce with new curb ($ 477) 004 Furnish and install Detectable Warning Stripsat Bldgs I & 2 Total area of approximately 280 sq. ft. ($7,000) 005 Provide decorative stone flumes at base of open downspouts ($2,500) 010 Increase Owners Contingency - Paver Allowance Adjustment $9,248 The above actions will not change the GMP, but will increase the Owner's Contingency by $9,248. The original Guaranteed Maximum Price was $ 33,086,442.00 The net change by previously authorized Change Orders $ (5,263,677.00) The Guaranteed Maximum Price prior to this Change Order was $ 27,822,765.00 The Guaranteed Maximum Price will be changed by this Change Order in the amount of $ 0 The new Guaranteed Maximum Price including this Change Order will be $ 27,822,765.00 The Contract Time will be increased by zero 10 ) days. The date of Substantial Completion as of the date of this Change Order therefore is August 3, 2007. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County Commissioners ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 609 17th Street, Vero Beach, Florida 32960 S 11/! BY (Signature) (q ydn U l.3 Anthony Donadio (Typed name) GATE /fs DATE 800 N. Magnolia Avenue, Orlando, FL 32803 ADDRE/�) BY (Sign � Louis Fiore (Toped name) J/0" A DATE 1801 27th Street. Vero. Beach,Florida 32960... - .:... AD SS BY (ilmature)' 1 Sandra.L..Bowden, Chairman. (Typed dameti-y� DATE AIA Document G701 TO — 2001. Copyright ©1979, 1987. 2000 and 2001 by The American Institute of Architects. All rights reserved. WA1#1T4a,1D&A Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the laly_AT�1js d�cu7ieq was produced b AIA software at 13:13:44 on 01110/2008 under Order No.1000313134 1 which expires on 7/24/2008, and is not for resaleJlAIY j 11 User Notes: 11 fi59.443r December 13, 2007 Mr. Tom Frame Director of General Services Indian River County Administration Complex 2625 19th Avenue Vero Beach, FL 32960 RE: IRC New Admin Building 2625 19th Avenue Vero Beach, Florida 32960 Project #: 11531 Change Order Request Number CORA 16 Scope Change Dear Mr. Frame, We have finalized gathering all the required quotations for PCO 032 for the following extra work: Brick Paver Allowance Adjustment We have verified that all extra work items are in compliance with our Contract Agreement The following is a detailed itemization of all extra costs: PCO No Item No Description Amount Contractor 032 005 Provide Decorative Stone Flumes (approximately $2,500. COBCON 1" stone) at base of open downspouts (7 each); five at South Side of Building 1 and two at East Side of Building 2 as directed by Turner Superintendent. 032 001 Release Hold Allowance for Brick Pavers and ($231778.) COBCON Sidewalks 032 010 Increase Owner Contingency--PaverAllowance$9,248. INDRIV Adjustment 032 002 Remove temporary and remaining sidewalks at $4,553. GULCON Northwest Corner of 20th Avenue and 26th Street Intersection. Includes import replacement fill and Bahhia Sod. Ramped Curb Cut at 26th Street up to control joint to remain in place. 032 004 Furnish and Install Detectable Warning Strips $7,000. COBCON made from 4" x 8" Hanson Red Pavers with Detectable Truncated Domes in 4 areas constructed with pavers: At North Entrance of Building 1 Traffic Circle, Walkway from Building 2 Entance to Building 1 Sidewalk (one at each side of road), and at paved sidewalk to Existing Health Department Building. Total Area is approximately 280 square feet. Includes removal and disposal of existing pavers and includes soldier courses of existing pavers around the detectable pavers. Includes clean up, barricades, and traffic control. 032 003 Remove Existing Pedestrian Ramp Curb Cut and $477. COBCON adjacent Sidewalk at northwest corner of intersection at 19th Ave and 26th Street and replace with new curb to match existing. Includes clean up and haul off of demolished debris. Total Change to the GMP: $0.00 Please return one (1) signed copy of this letter indicating your authorization to process this Change Order Request which does not change our Contract Amount. Following final approval of the actual Change Order by the Board of County Commissioners, the Owners Contingency will be increased by Nine Thousand Two Hundred Forty Eight Dollars ($9,248.). All Subcontract Change Orders have been issued. If you have any questions regarding this Change Order Request, please call me at your earliest convenience. Sincerely, ike Dou herty r. Project Engineer Source of Funding: Approved By: CL), ( LO Date: I d Tom Frame -Director OUGeneral Services cc: COR -116, PCO -0321 Cost, Purchasing, Accounting, Donadio, Tom Frame