Loading...
HomeMy WebLinkAbout2006-063 02 - moi - o ( dav6 - 0 � 3 Document G701 - 2001 TM Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 004 OWNER: New County Administration Building DATE: February 14, 2006 Lying Between the Main Relief Canal to ARCHITECT: lire North, the Lateral D Canal on the CONTRACTOR: Sounlh and East and 20th Avenue to the West FIELD: ❑ TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 Turner Construction Com an OTHER: ❑ P' Y CONTRACT DATE: (Amendment #2) August 23, 2005 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - Orlando, Florida 32803 Construction Management at Risk THE CONTRACT IS CHANGED AS FOLLOWS: (Include, rehere applicable, any undisputed amount attributable to previously esecated Construction Change Directives) Reference Description Amount COR-001 Add Eight Inch Water Line Loop $ f 1 ,594 COR-004 Provide 159 Square Feet of Asphalt Offstite for Repair of Existing Area South of Existing County Administration Building $ 495 COR-020 Provide Irrigation for Transplanted Trees $ 3,091 COR-021 Stand Up Ten Oak Trees Blown Over by Hurricane Wilma $ 2,613 COR-029 Removal of Additional Abandoned Underground Utilities not Identified on Drawings $ 22,425 The combination of these will not change the GMP, but will decrease the Owner's contingency of $280,229 by $40,218 resullingin a new Owner Contingency of $240,011 . The original Guaranteed Maximum Price was $ 33,086,442 The net change by previously authorized Change Orders $ (3,844 244) The Guaranteed Maximum Price prior to this Change Order was $ 29,242, 198 The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ (0) The new Guaranteed Maximum Price including this Change Order will be $ 29,242,198 The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is January 16, 2007 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County Commissioners ARCHITECT (Finn name) CONTRACTOR (Firm name) OWNER (Firm name) 609 17th Street, Vero Beach, Florida 800 N. Magnolia Avenue 184025th Street, Vero Beach,Florida 32960 Orlando, Florida 32803 32960 ADDSignature) ADDRESS of (Signan (Signet re) Anthony Donadio Louis Fiore oseph A. Baird, County Administrator (Typed name) (7}ped name) (Typed name) DATE DATE 7-a!/� � `^z. a� DATE ao vG AIA®Document G701 Ta - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under he law. This document was produced by AIA software at 11 :32:26 on 02/15/2006 under Order No. 1000192296 1 which expires /8/2006, antl is n f esale. User Note ' - Revie Recommended for Approval: 12519433400) Steve Blum, Project ManagerThomas W. Fra e, General Servi esirec[or Justin Brown. Bu act Director I /.