GRIGINAL - =. AIA Document G701T" 11111111112001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 024 OWNER: New County Administration Building DATE: March 20, 2007 ARCHITECT: Lying Between the Main Relief Canal to the North, the Lateral D Canal on the CONTRACTOR: Sounth and East and 20th Avenue to the Nes[ FIELD: ❑ TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ Turner Construction Company CONTRACT DATE: (Amendment If 2) August 23, 2005 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - Orlando, Florida 32803 Construction ':Manager at Risk THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) PCO Description Amount _ No. 118 Extend Substantial Completion Date Ninety (90) days from Aril 1 , 2007 to June 30, 2007 Costs of General Conditions and Indirect Costs associated with this Time Extension to be funded through Construction Contingency (Turner Construction) and other uneomitted funds within the GMP. $375,979.00 The acceptance of this change item will not increase or decrease the GMP and will not change the Owner' s Contingency The original Guaranteed Maximum Price was $ 33,086,442.00 The net change by previously authorized Change Orders $ (6, 115,787.00) The Guaranteed Maximum Price prior to this Change Order was $ 26.970,655.00 The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ 0 The new Guaranteed Maximum Price including this Change Order will be $ 26,970,655.00 The Contract Time will be increased by ninety ( 90 ) days. The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2007. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. • A Lt: r ,� 7 Dunedin & Associates, Architects, P.A. Tuner Construction Company Indian &fu r Couna7. )3oaGd,of County Ccnig SSW ners ARCHITECT (Firm name) CONTRACTOR (Finn name) OWNLR(Finn name) _ 609 17th Street, Vero Beach, Florida 800 N. Magnolia Avenue, Orlando, FL 1840 x9th §Ivinet. Venn BeacF ,t omida 32960 32803 32960 : AD R S ADDRESS ADD-RPS (9 gnature) BY (Signaru e) BY (Sign ), N %. Anthony Donadio Louis Fiore Gary C. heeler; Chak Loan (Typed name, (Typed name (Typed name) DATE DATE DATE AIA Document G701 Tw - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12: 14:37 on 03. 13/2007 under Order No.1000250302_1 which expires on 725/2007, and is not for resale. User Notes: Indian River Coh t}' Staff Review Approvals (3902058269) General Services Co. Administrator Q� OMB 4 b o Legal - n Turner March 09, 2007 Mr. Steve Blum Project Manager Indian River County Administration Complex 2625 19th Avenue Vera Beach , FL 32960 RE: IRC New Admin Building 2625 19th Avenue Vero Beach , Florida 32960 Project #: 11531 Change Order Request Number COR-094 Scope Change-Extended General Conditions Dear Mr. Blum, We have finalized gathering all the required quotations for PCO-118 for the following extra work: Extension of Time and Associated General Conditions Costs for Revisions included in CCD's 16117, 20, 219 22, 23, 24, & 25. We have verified that all extra work items are in compliance with our Contract Agreement. The following is a detailed itemization of all extra costs: PCO No Item No Description Amount Contractor 118 001 Extend Substantial Completion Date 90 days from $360,000. TURCON 4/1 /07 to 6/30/07 as a result of Changes issued through CCD's 16, 17, 20, 21 , 22 , 23, 24, and 25. 118 002 Fee at 4.25% of Total . $ 15,979. TURCON Total Cost of this Change : $375,979.00 This change will extend the Substantial Completion Date 90 Days to June 30, 2007. The Costs included herein are for General Conditions and Indirect Costs, only, and do not include other. Direct Costs associated with the referenced CCD's. It is the intent to have this COR initially funded within the GMP through Construction Contingency and other Uncommitted Funds that may accrue at Final Completion of the Project. In the event that part or all of the Funds do not become available to cover this COR, the GMP will be increased by whatever amount is needed , up to the value of $375,979. , to ensure that any part of the Fee associated with this COR does not become encumbered . Please return one ( 1 ) signed copy of this letter indicating your authorization to process this Change Order Request, which does not initially change the Contract Amount. This authorization further recognizes an obligation to increase the GMP up to $3752979. , if it becomes necessary to protect Turner's Fee. This approval will also authorize us to issue Subcontract Change Orders as required . If you have any questions regarding this Change Order Request, please call me at your earliest convenience. incere ike Dougherty Sr. Project Engineer Source of Funding: Recommended By: Date: 3 at`5 • V7 StSteve umI1- ro^^ject Manager Approved By: ��GCiI.r uJ • lM" Date: Tom Frame-Director f General Services cc: COR-094, PCO-118, Cost, Purchasing , Accounting, Donadio, Tom Frame